[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256604":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1256604,840,2,"多选题","“施工日志”是为了对施工过程中有关技术管理和质量管理活动作出连续完整的原始记录。对施工日志的要求有：（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","新颖",false,{"key":16,"text":17,"correct":14},"B","生动",{"key":19,"text":20,"correct":21},"C","及时、准确、完整",true,{"key":23,"text":24,"correct":21},"D","连续性",{"key":26,"text":27,"correct":21},"E","可追溯性","CDE","施工日志填写要求：施工日记按每个工区施工段，分部、分项工程填写；记录时间：从开工到竣工验收时止；逐日记载不许中断；按时、真实、详细记录，中途发生人员变动，应当办理交接手续？保持施工日记的连续性、完整性。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)专业管理实务 岗位知识","建筑工程",0]