[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256527":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1256527,840,1,"单选题","（ ）是规划和指导施工全过程的综合性技术经济文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工方案",false,{"key":16,"text":17,"correct":18},"B","施工组织设计",true,{"key":20,"text":21,"correct":14},"C","施工进度计划",{"key":23,"text":24,"correct":14},"D","施工安全方案","施工组织设计是规划和指导施工全过程的综合性技术经济文件。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]