[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256525":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":24},1256525,840,1,"单选题","大修的城市道路竣工后（ ）年内不得挖掘。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",true,{"key":16,"text":17,"correct":18},"B","5",false,{"key":20,"text":21,"correct":18},"C","7",{"key":23,"text":17,"correct":18},"D","依据《城市道路管理条例》的规定，新、扩、改建的城市道路交付使用后５年内、大修的城市道路竣工后３年内挖掘许可初审。",{"id":6,"name":26,"category":27,"favorite":28},"(市政施工)专业管理实务 岗位知识","建筑工程",0]