[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256479":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1256479,840,1,"单选题","下列不属于工程量计算依据的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程量计算规则",false,{"key":16,"text":17,"correct":14},"B","施工设计图纸及其说明",{"key":19,"text":20,"correct":21},"C","施工组织设计或施工方案",true,{"key":23,"text":24,"correct":14},"D","招标文件","2）工程量计算依据①施工图纸及设计说明、相关图纸、设计变工、图纸答疑、会审记录等。②工程施工合同、招标文件的商务条款。③工程量计算规则。3）工程量计算规则智考题库工程量计算规则是指确定建筑产品分部分项工程数量的基本规则，是实施工程量清单计价，提供工程量数据的最基础的资料之--，不同的计算规则，会有不同的分部分项工程量。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]