[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256467":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1256467,840,1,"单选题","工程单价分析中，工、料、机单价应是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","考虑预期价格浮动后的优选价",true,{"key":16,"text":17,"correct":18},"B","考虑预期价格浮动后的预算定额价",false,{"key":20,"text":21,"correct":18},"C","考虑预期价格浮动后的市场指导价",{"key":23,"text":24,"correct":18},"D","考虑预期价格浮动后的概算定额价","工程单价分析中，工、料、机单价应是考虑预期价格浮动后的优选价。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]