[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256449":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1256449,840,1,"单选题","在工程实施阶段，有关工程计量和计价的说法错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量依据双方确认的工程量，合同约定的综合单价计算",false,{"key":16,"text":17,"correct":14},"B","工程量清单中若出现工程量偏差，应按承包人履行合同义务过程中完成的工程量计算",{"key":19,"text":20,"correct":14},"C","当工程量变化在合同约定幅度以外的，综合单价应予以调整",{"key":22,"text":23,"correct":24},"D","计日工应按承包人上报的事项计算",true,"计日工应按发包人实际签证确认的事项计算。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]