[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256435":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1256435,840,1,"单选题","基坑（槽）、边坡、基础桩、模板和临时建筑作业前，施工单位应按设计单位要求编制施工方案，（ ）审批签字，项目分管负责人组织有关部门验收，经验收合格签字后，方可作业。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单位技术负责人",true,{"key":16,"text":17,"correct":18},"B","项目技术负责人",false,{"key":20,"text":21,"correct":18},"C","项目负责人",{"key":23,"text":24,"correct":18},"D","单位分管负责人","基坑（槽）、边坡、基础桩、模板和临时建筑作业前，施工单位应按设计单位要求编制施工方案，单位技术负责人审批签字，项目分管负责人组织有关部门验收，经验收合格签字后，方可作业。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]