[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256404":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1256404,840,1,"单选题","接地体可用角钢，钢管不少于（ ）根，人土深度不小于（ ）m，两根接地体间距不小于（ ）m，接地电阻不大于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","两，1，5.0，4",false,{"key":16,"text":17,"correct":18},"B","两，2，2.5，4",true,{"key":20,"text":21,"correct":14},"C","两，3，3.0，2",{"key":23,"text":24,"correct":14},"D","三，4，2.0，2","接地体可用角钢、钢管，不少于2根，人土深度不小于2m，两根接地体间距不小于2.5m，接地电阻不大于4。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]