[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256305":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1256305,840,1,"单选题","计算劳动量和机械台班数时，应首先确定所采用的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定额",true,{"key":16,"text":17,"correct":18},"B","施工方案",false,{"key":20,"text":21,"correct":18},"C","施工组织设计",{"key":23,"text":24,"correct":18},"D","施工顺序","计算劳动量和机械台班数时，应首先确定所采用的定额。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]