[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256275":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1256275,840,1,"单选题","在安排一个小型项目施工的进度时，只需编制（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工总进度方案",false,{"key":16,"text":17,"correct":14},"B","施工总进度规划",{"key":19,"text":20,"correct":21},"C","施工总进度计划",true,{"key":23,"text":24,"correct":14},"D","施工总进度目标","安排一个小型项目施工的进度时，只需编制施工总进度计划。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]