[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256260":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1256260,840,1,"单选题","沉桩方式不包括",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","锤击沉桩",false,{"key":16,"text":17,"correct":18},"B","放射沉桩",true,{"key":20,"text":21,"correct":14},"C","振动沉桩",{"key":23,"text":24,"correct":14},"D","静力压桩","沉桩方式包括锤击沉桩、振动沉桩、射水沉桩、静压力沉桩、钻孔沉桩。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]