[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256240":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1256240,840,1,"单选题","在旧路上开槽埋管时，沟槽挖掘计算深度通常是指（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地表标高—管底设计标高",false,{"key":16,"text":17,"correct":18},"B","地表标高—管道土基标高",true,{"key":20,"text":21,"correct":14},"C","路基标高—管底设计标高",{"key":23,"text":24,"correct":14},"D","路基标高—管道土基标高","本题考点涉及沟槽挖掘计算深度的概念。这是在工程实践中的常识问题，但初入行的人常容易犯错。本题的选项A、C肯定是错项，因为都漏算了管壁厚度、度；大于时，应取承口处的厚度作为管壁厚度进行计算。为什么B选项是答案，在通常情况下都是用此概念，唯有在判别沟槽深度是否大于5m，是否需要编制专项施方案进行专家评审时，才有可能用到D选项的概念。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]