[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256235":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1256235,840,1,"单选题","泥质防水层施工质量检验项目包括压实度试验和（ ）两项。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","严密性试验",false,{"key":16,"text":17,"correct":14},"B","抗压试验",{"key":19,"text":20,"correct":14},"C","强度试验",{"key":22,"text":23,"correct":24},"D","渗水试验",true,"泥质防水层施工质量检验项目包括压实度试验和渗水试验两项。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]