[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256211":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1256211,840,1,"单选题","目前基坑围护结构类型可归为6类，SMW工法属于（ ）中的一种。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","柱列式W",false,{"key":16,"text":17,"correct":14},"B","自立式水泥土挡墙",{"key":19,"text":20,"correct":14},"C","板桩式",{"key":22,"text":23,"correct":24},"D","组合式",true,"组合式围护结构分为SMW工法和灌注桩与搅拌桩结合。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]