[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1256151,840,1,"单选题","按风险的（ ）可分为项目风险、国别风险和地区风险。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","严峻程度",false,{"key":16,"text":17,"correct":14},"B","工程实施不同阶段",{"key":19,"text":20,"correct":21},"C","范围",true,{"key":23,"text":24,"correct":14},"D","来源","（1）按风险严峻程度分为特殊风险（非常风险）和其他风险；（2）按工程实施不同阶段分为项目风险、合同谈判阶段的风险、合同实施阶段的风险；（3）按风险范围分为项目风险、国别风险和地区风险；（4）从风险的来源可分为政治风险、经济风险、技术风险、商务风险、公共关系风险和管理风险。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]