[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256088":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1256088,840,1,"单选题","张拉设备的标准期限不得超过（ ），且不得超过200次张拉作业。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3个月",false,{"key":16,"text":17,"correct":18},"B","半年",true,{"key":20,"text":21,"correct":14},"C","9个月",{"key":23,"text":24,"correct":14},"D","一年","预应力张拉施工质量事故预防措施的设备控制中：张拉设备的校准期限不得超过半年，且不得超过200次张拉作业。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]