[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256087":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1256087,840,1,"单选题","关于用各种起吊机具设备吊放梁、板的说法，错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","起吊混凝土梁板时，捆绑吊点位置应按设计规定或根据计算决定",false,{"key":16,"text":17,"correct":14},"B","吊移板式构件时，不得吊错板梁的上、下面，防止折断",{"key":19,"text":20,"correct":14},"C","构件移运、停放的支承位置应与吊点位置一致，并应支承稳固",{"key":22,"text":23,"correct":24},"D","混凝土梁、板经过验算不会发生超容许应力情况时，可采用一个吊点在梁的重心起吊",true,"本题考点涉及预制梁板的吊运要求。（1）构件移运、吊装时的吊点位置应按设计规定或根据计算决定。（2，）吊装时构件的吊环应顺直，吊绳与起吊构件的交角小于60。时，应设置吊架或吊装扁担，尽量使吊环垂直受力。（3）构件移运、停放的支承应与吊点位置一致，并应支承稳固。在顶起构件时应随时置好保险垛。（4）吊移板式构件时，不得吊错板梁的上、下面，防止折断。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]