[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1256004":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1256004,840,1,"单选题","验证施工人员的上岗资格是HDPE膜施工质量的关键环节之一，下列选项中，不符合施工人员上岗资格证的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确认相关的技术管理人员能否满足工期要求",true,{"key":16,"text":17,"correct":18},"B","应审核操作人员的上岗证",false,{"key":20,"text":21,"correct":18},"C","通过验证使有资格的操作人员上岗",{"key":23,"text":24,"correct":18},"D","确认工人数量是否满足工期要求","高密度聚乙烯膜防渗层施工技术，施工人员的上岗资格：应审核操作人员的上岗证，确认其上岗资格，相关的技术管理人员（技术人员、专业实验检验人员）能否上岗到位，工人数量是否满足工期要求。通过验证使有资格的操作人员上岗，保证工期和操作质量。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]