[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255993":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1255993,840,1,"单选题","下列哪些工程需要组织专家对专项方案进行论证。（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","开挖深度4m的基坑工程",false,{"key":16,"text":17,"correct":14},"B","搭设高度6m的混凝土模板工程",{"key":19,"text":20,"correct":21},"C","开挖深度24m的人工挖孔桩工程",true,{"key":23,"text":24,"correct":14},"D","搭设高度24m的落地式钢管脚手架工程","需要组织专家对专项方案进行论证的是：搭设高度8m的混凝土模板工程、开挖深度24m的人工挖孔桩工程、开挖深度5m的基坑工程、搭设高度50m的落地式钢管脚手架工程等",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)专业管理实务 岗位知识","建筑工程",0]