[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,8,50,1169,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,258,270,282,294,306,317,329,341,353,365,377,389,401,413,425,437,449,461,470,478,490,499,511,523,535,543,555,567,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1255143,1,"单选题","工作队式项目组织适用于（ ）施工项目。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","适用于小型的，专业性较强的",false,{"key":24,"text":25,"correct":26},"B","大型项目、工期要求紧迫的项目",true,{"key":28,"text":29,"correct":22},"C","大型经营性企业的工程承包",{"key":31,"text":32,"correct":22},"D","大规模综合性的","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1255144,"项目是由一组有起止时间的、相互协调的受控活动所组成的特定过程。其具有的共同特征中，下列选项不正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目具有一次性",{"key":24,"text":41,"correct":22},"项目具有明确的目标",{"key":28,"text":43,"correct":26},"项目具有可逆性",{"key":31,"text":45,"correct":22},"项目具有特定的生命期",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1255145,"以下不属于施工项目现场管理内容的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"规划及报批施工用地",{"key":24,"text":53,"correct":22},"设计施工现场平面图",{"key":28,"text":55,"correct":22},"建立施工现场管理组织",{"key":31,"text":57,"correct":26},"为项目经理决策提供信息依据",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1255146,"反映一个组织系统中各子系统之间或各工作部门之间的指令关系的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"组织结构模式",{"key":24,"text":65,"correct":22},"组织分工",{"key":28,"text":67,"correct":22},"工作流程组织",{"key":31,"text":69,"correct":22},"工作分解结构",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1255147,"项目资金管理以实现（ ）和提高经济效益为目标。",[74,76,78,80],{"key":20,"text":75,"correct":22},"保证收人、节约成本、防范风险",{"key":24,"text":77,"correct":26},"保证收人、节约支出、防范风险",{"key":28,"text":79,"correct":22},"保证成本、节约支出、防范风险",{"key":31,"text":81,"correct":22},"保证收人、节约支出、加强合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1255148,"施工项目管理的主体是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"以项目经理为首的项目经理部",{"key":24,"text":89,"correct":22},"以总监理工程师为首的监理单位",{"key":28,"text":91,"correct":22},"以项目法为为首的建设单位",{"key":31,"text":93,"correct":22},"建设行政主管部门",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1255149,"下列选项中，不属于运用动态控制原理控制施工进度的步骤的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工进度目标的逐层分解",{"key":24,"text":101,"correct":26},"对施工进度目标的分析和比较",{"key":28,"text":103,"correct":22},"对施工进度目标进行动态跟踪和控制",{"key":31,"text":105,"correct":22},"调整施工进度目标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1255150,"市政工程施工现场应采用封闭管理。在市区内，围挡应高于（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"1.8m",{"key":24,"text":113,"correct":22},"2.0m",{"key":28,"text":115,"correct":26},"2.5m",{"key":31,"text":117,"correct":22},"3.0m",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1255151,"（ ）是现场管理的重要内容和依据，是施工组织设计的组成部分。",[122,124,126,128],{"key":20,"text":123,"correct":22},"施工进度计划",{"key":24,"text":125,"correct":22},"施工方案设计",{"key":28,"text":127,"correct":26},"施工总平面设计",{"key":31,"text":129,"correct":22},"施工合同文件",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1255152,"资源管理以实现（ ）和成本节约为目标。",[134,136,138,140],{"key":20,"text":135,"correct":22},"资源最少配置、动态控制",{"key":24,"text":137,"correct":22},"资源优化配置、静态控制",{"key":28,"text":139,"correct":22},"资源最多配置、动态控制",{"key":31,"text":141,"correct":26},"资源优化配置、动态控制",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1255153,"下列选项中，不属于施工项目现场管理的内容的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"申领施工许可证",{"key":24,"text":149,"correct":22},"合理规划施工用地",{"key":28,"text":151,"correct":22},"建立文明的施工现场",{"key":31,"text":153,"correct":22},"做好施工总平面设计",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1255154,"项目目标动态控制的核心是在项目实施的过程中定期地进行（ ）的比较。",[158,160,162,164],{"key":20,"text":159,"correct":22},"项目目标计划值和偏差值",{"key":24,"text":161,"correct":22},"项目目标实际值和偏差值",{"key":28,"text":163,"correct":26},"项目目标计划值和实际值",{"key":31,"text":165,"correct":22},"项目目标当期值和上一期值",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1255155,"下列有关环境保护和文明施工管理的论述中，错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"渣土运输车应采用覆盖措施",{"key":24,"text":173,"correct":22},"使用密目式安全网对在建建筑物进行封闭",{"key":28,"text":175,"correct":26},"搅拌场所采取喷雾洒水措施",{"key":31,"text":177,"correct":22},"施工处地的料场、生活区域应进行硬化处理",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1255156,"施工项目管理工作的主要内容是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"三控制、二管理、一协调",{"key":24,"text":185,"correct":26},"三控制、三管理、一协调",{"key":28,"text":187,"correct":22},"两控制、二管理、一协调",{"key":31,"text":189,"correct":22},"两控制、三管理、一协调",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1255157,"某市政工程土方开挖时，底宽6m、底长15m、挖深2.5m，则应套用的土方开挖形式为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"一般土方开挖",{"key":24,"text":197,"correct":22},"沟槽土方开挖",{"key":28,"text":199,"correct":26},"基坑土方开挖",{"key":31,"text":201,"correct":22},"场地平整",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1255158,"劳动消耗定额又称（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"人工消耗定额",{"key":24,"text":209,"correct":22},"材料消耗定额",{"key":28,"text":211,"correct":22},"机械台班消耗定额",{"key":31,"text":213,"correct":22},"施工定额",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1255159,"（ ）作为确定工程造价的主要依据，是计算标底和确定报价的主要依据。",[218,220,221,223],{"key":20,"text":219,"correct":22},"劳动定额",{"key":24,"text":213,"correct":22},{"key":28,"text":222,"correct":26},"预算定额",{"key":31,"text":224,"correct":22},"概算定额",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},1255160,"下列关于保护层厚度的说法不正确的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"当混凝土强度等级不低于C20且施工质量可靠保证，其保护层厚度可按相应规范中减少5mm",{"key":24,"text":232,"correct":22},"预制构件中的预应力钢筋保护层厚度不应小于25mm",{"key":28,"text":234,"correct":22},"钢筋混凝土受弯构件，钢筋端头的保护层厚度一般为10mm",{"key":31,"text":236,"correct":26},"板、墙、壳中分布钢筋的保护层厚度不应小于15mm",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1255161,"计算市政管网工程量时，管道外防腐面积的计算公式为：管道外防腐面积=（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"管内径×3.142×设计长度",{"key":24,"text":244,"correct":26},"管外径×3.142×设计长度",{"key":28,"text":246,"correct":22},"管道公称直径×3.142×设计长度",{"key":31,"text":248,"correct":22},"（管道公称直径+10mm）×3过42×设计长度",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1255162,"使用国有资金投资的建设工程发承包，必须采用（ ）计价。",[253,254,255,256],{"key":20,"text":213,"correct":22},{"key":24,"text":222,"correct":22},{"key":28,"text":224,"correct":22},{"key":31,"text":257,"correct":26},"工程量清单",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1255163,"市政管网工程量计算中，计算规则“管外径×3.142×设计长度”表达的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"管道安装长度",{"key":24,"text":265,"correct":22},"管道闭气试验长度",{"key":28,"text":267,"correct":22},"管道内防腐面积",{"key":31,"text":269,"correct":26},"管道外防腐面积",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},1255164,"DN1000钢筋混凝土排水管道工程开挖，基础采用混凝土基础90°，管道基础宽1.4m，根据施工组织设计设置挡土板，则沟槽开挖底宽应为（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"1.4",{"key":24,"text":277,"correct":22},"2.0",{"key":28,"text":279,"correct":22},"2.4",{"key":31,"text":281,"correct":26},"2.9",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1255165,"工程量均以施工图为准计算，下列说法错误的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":26},"砌筑按计算体积，以立方米计算抹灰和勾缝",{"key":24,"text":289,"correct":22},"各种井的预制构件以实体积计算",{"key":28,"text":291,"correct":22},"井、渠垫层、基础按实体积以立方米计算",{"key":31,"text":293,"correct":22},"沉降缝应区分材质，按沉降缝的断面积或铺设长分别以平方米和米计算",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1255166,"管道沟槽的深度按基础的形式和埋深分别计算，枕基的计算方法是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"原地面高程减设计管道基础底面高程",{"key":24,"text":301,"correct":26},"原地面高程减设计管道基础底面高程加管壁厚度",{"key":28,"text":303,"correct":22},"原地面高程减设计管道基础底面高程加垫层厚度",{"key":31,"text":305,"correct":22},"原地面高程减设计管道基础底面高程减管壁厚度",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1255167,"下列不属于按定额反映的生产要素消耗内容分类的定额是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"劳动消耗定额",{"key":24,"text":313,"correct":26},"时间消耗定额",{"key":28,"text":315,"correct":22},"机械消耗定额",{"key":31,"text":209,"correct":22},{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":28,"analysis":33},1255168,"桥涵工程中，桩基工程量计算时，“按桩长度（包括桩尖长度）乘以桩横断面面积，再减去空心部分体积计算”的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"钢筋混凝土方桩",{"key":24,"text":324,"correct":22},"预制桩",{"key":28,"text":326,"correct":26},"钢筋混凝土管桩",{"key":31,"text":328,"correct":22},"钢管桩",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1255169,"工程造价作为项目决策的依据与项目筹集资金的依据，体现了工程造价的（ ）职能。",[333,335,337,339],{"key":20,"text":334,"correct":26},"预测",{"key":24,"text":336,"correct":22},"控制",{"key":28,"text":338,"correct":22},"调控",{"key":31,"text":340,"correct":22},"评审",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1255170,"以下关于灌注桩水下混凝土工程量计算规则的说法中，正确的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"以根计量，按设计图小数量计算",{"key":24,"text":348,"correct":22},"以立方米计算，按不同截面在桩长范围内以体积计算",{"key":28,"text":350,"correct":22},"以米计量，按设计图示尺寸以桩长（包括桩尖）计算",{"key":31,"text":352,"correct":26},"按设计桩长加上桩顶设计超灌高度乘以设计横断面面积计算，桩顶超灌高度无设计要求的，则按1m计算",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1255171,"将系统和控制论的研究成果应用于建设工程造价管理，以尽可能地减少或避免工程造价目标值与实际值的偏离，属于（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"采取主动控制措施",{"key":24,"text":360,"correct":22},"合理设置工程造价控制目标",{"key":28,"text":362,"correct":22},"以决策阶段为重点进行全过程工程造价控制",{"key":31,"text":364,"correct":22},"技术与经济相结合是控制工程造价最有效的手段",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1255172,"根据市政工程定额分部分项工程的划分原则，分项工程是（ ）的组成部分。",[369,371,373,375],{"key":20,"text":370,"correct":22},"建设项目",{"key":24,"text":372,"correct":22},"单项工程",{"key":28,"text":374,"correct":22},"单位工程",{"key":31,"text":376,"correct":26},"分部工程",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":28,"analysis":33},1255173,"下列选项中，不属于挖掘机按铲斗分类的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"正铲挖掘机",{"key":24,"text":384,"correct":22},"反铲挖掘机",{"key":28,"text":386,"correct":26},"单斗液压反铲挖掘机",{"key":31,"text":388,"correct":22},"拉铲挖掘机",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1255174,"在钢筋工程量计算中，钢筋工程应按设计长度乘以单位重量，以（ ）计算。",[393,395,397,399],{"key":20,"text":394,"correct":22},"米.吨",{"key":24,"text":396,"correct":22},"厘米.千克",{"key":28,"text":398,"correct":22},"千克",{"key":31,"text":400,"correct":26},"吨",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1255175,"某市政项目的独立土方工程，招标文件中估计工程量为100万m3，甲乙合同中约定；土方工程单价为6元\u002Fm3，当实际工程量超过估计工程量20％时，调整单价，单价调为4元\u002Fm3。工程结束时核算实际完成土方工程量为130万m3。 超过20％之后部分工程量的工程款为（ ）万元。",[405,407,409,411],{"key":20,"text":406,"correct":22},"20",{"key":24,"text":408,"correct":26},"40",{"key":28,"text":410,"correct":22},"60",{"key":31,"text":412,"correct":22},"80",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1255176,"以下关于工程量清单说法不正确的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"工程量清单是招标文件的组成部分",{"key":24,"text":420,"correct":26},"工程量清单应采用工料单价计价",{"key":28,"text":422,"correct":22},"工程量清单可由招标人编制",{"key":31,"text":424,"correct":22},"工程量清单是由招标人提供的文件",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1255177,"下列有关工程量计算错误的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"计算单位要和套用的定额项目的计算单位一致",{"key":24,"text":432,"correct":26},"相同计量单位只有一种计算方法",{"key":28,"text":434,"correct":22},"注意计算包括的范围",{"key":31,"text":436,"correct":22},"注意标准要符合定额的规定",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},1255178,"在钢筋工程量计算中，钢筋长度计算公式为（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"钢筋长度=构件图示尺寸+保护层总厚度+两端弯钩长度-（图纸注明的搭接长度、弯起钢筋斜长的增加值）",{"key":24,"text":444,"correct":22},"钢筋长度=构件图示尺寸+保护层总厚度一两端弯钩长度-（图纸注明的搭接长度、弯起钢筋斜长的增加值）",{"key":28,"text":446,"correct":26},"钢筋长度=构件图示尺寸-保护层总厚度+两端弯钩长度+（图纸注明的搭接长度、弯起钢筋斜长的增加值）",{"key":31,"text":448,"correct":22},"钢筋长度=构件图示尺寸-保护层总厚度-两端弯钩长度+（图纸注明的搭接长度、弯起钢筋斜长的增加值）",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1255179,"随着科学技术水平和管理水平的提高，社会生产力的水平也必然会提高，原有定额不能使用生产发展时，定额授权部门根据新的情况对定额进行修订和补充，这体现了定额的（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"真实性",{"key":24,"text":456,"correct":26},"时效性",{"key":28,"text":458,"correct":22},"系统性",{"key":31,"text":460,"correct":22},"可变性",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1255180,"以下哪项既是企业编制施工组织设计的依据，又是企业编制施工作业计划的依据。",[465,466,467,468],{"key":20,"text":224,"correct":22},{"key":24,"text":213,"correct":26},{"key":28,"text":222,"correct":22},{"key":31,"text":469,"correct":22},"概算指标",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1255181,"定额编制时使用平均先进水平的是（ ）。",[474,475,476,477],{"key":20,"text":213,"correct":26},{"key":24,"text":222,"correct":22},{"key":28,"text":224,"correct":22},{"key":31,"text":469,"correct":22},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},1255182,"某城市道路，快车道路面铺设工程量计算时，应不扣除（ ）所示面积。",[482,484,486,488],{"key":20,"text":483,"correct":22},"绿化带",{"key":24,"text":485,"correct":26},"检查井",{"key":28,"text":487,"correct":22},"路缘石",{"key":31,"text":489,"correct":22},"安全岛",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1255183,"某新建水厂建设项目的生产车间应看作是一个（ ）。",[494,495,496,498],{"key":20,"text":374,"correct":22},{"key":24,"text":372,"correct":26},{"key":28,"text":497,"correct":22},"分项工程",{"key":31,"text":497,"correct":22},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1255184,"某城市道路路面结构分别为石灰土底基层、水泥稳定碎石基层，底基层面积为950㎡，基层顶面面积为900㎡，则基层的养生面积应为（ ）㎡。",[503,505,507,509],{"key":20,"text":504,"correct":26},"900",{"key":24,"text":506,"correct":22},"950",{"key":28,"text":508,"correct":22},"1800",{"key":31,"text":510,"correct":22},"1900",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1255185,"某市政项目的独立土方工程，招标文件中估计工程量为100万m3，甲乙合同中约定；土方工程单价为6元\u002Fm3，当实际工程量超过估计工程量20％时，调整单价，单价调为4元\u002Fm3。工程结束时核算实际完成土方工程量为130万m3。 合同约定范围内（20％以内）的工程款为（ ）万元。",[515,517,519,521],{"key":20,"text":516,"correct":22},"480",{"key":24,"text":518,"correct":22},"600",{"key":28,"text":520,"correct":22},"700",{"key":31,"text":522,"correct":26},"720",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},1255186,"在编制分部分项工程量清单中，（ ）不一定按照全国统一的工程量清单项目设置规则和计量规则要求填写。",[527,529,531,533],{"key":20,"text":528,"correct":22},"项目编号",{"key":24,"text":530,"correct":22},"项目名称",{"key":28,"text":532,"correct":22},"工程数量",{"key":31,"text":534,"correct":26},"项目工作内容",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1255187,"以下哪项是以整个构筑物为对象，而规定人工、机械与材料的耗用量及其费用标准。",[539,540,541,542],{"key":20,"text":224,"correct":22},{"key":24,"text":213,"correct":22},{"key":28,"text":222,"correct":22},{"key":31,"text":469,"correct":26},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1255188,"以下不属于施工项目管理内容的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"施工项目的生产要素管理",{"key":24,"text":550,"correct":22},"组织协调",{"key":28,"text":552,"correct":22},"施工现场的管理",{"key":31,"text":554,"correct":26},"项目的规划设计",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},1255189,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（ ）、施工项目安全控制四个方面。",[559,561,563,565],{"key":20,"text":560,"correct":22},"施工项目管理控制",{"key":24,"text":562,"correct":26},"施工项目成本控制",{"key":28,"text":564,"correct":22},"施工项目人力控制",{"key":31,"text":566,"correct":22},"施工项目物资控制",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":28,"analysis":33},1255190,"PowerPoint演示文稿的缺省扩展名为（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"doc",{"key":24,"text":574,"correct":22},"txt",{"key":28,"text":576,"correct":26},"ppt",{"key":31,"text":578,"correct":22},"xls",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1255191,"AutoCAD中，某一直线的起点坐标为（8，5）、终点坐标为（15，5），则终点相对于起点的相对极坐标为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"7，0",{"key":24,"text":586,"correct":26},"@7\u003C0",{"key":28,"text":588,"correct":22},"7\u003C0",{"key":31,"text":590,"correct":22},"@7，0",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":28,"analysis":33},1255192,"”BIM技术”是（ ）的简称。",[595,597,599,601],{"key":20,"text":596,"correct":22},"计算机辅助设计技术",{"key":24,"text":598,"correct":22},"计算机辅助制造技术",{"key":28,"text":600,"correct":26},"建筑信息模型技术",{"key":31,"text":602,"correct":22},"施工信息化技术",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]