[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,7,50,1169,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,224,236,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1255092,1,"单选题","下列选项中不属于先张法制作预应力混凝土梁板工艺流程的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","调整初应力",false,{"key":24,"text":25,"correct":22},"B","张拉预应力筋",{"key":27,"text":28,"correct":29},"C","管道压浆",true,{"key":31,"text":32,"correct":22},"D","整修锚、夹具","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1255093,"沉人桩桩架的选择，主要根据桩锤种类、（ ）、施工条件等而定。",[38,40,42,44],{"key":20,"text":39,"correct":22},"锤长",{"key":24,"text":41,"correct":22},"锤重",{"key":27,"text":43,"correct":22},"人数",{"key":31,"text":45,"correct":29},"桩长",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1255095,"桥梁所受的荷载作用中，汽车荷载属于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"临时作用",{"key":24,"text":53,"correct":22},"永久作用",{"key":27,"text":55,"correct":29},"可变作用",{"key":31,"text":57,"correct":22},"偶然荷载",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1255096,"受弯构件是指（ ）的构件。",[62,64,66,68],{"key":20,"text":63,"correct":22},"截面上有弯矩、剪力和扭矩作用",{"key":24,"text":65,"correct":22},"截面上有弯矩作用",{"key":27,"text":67,"correct":29},"截面上有弯矩、剪力作用",{"key":31,"text":69,"correct":22},"截面上有扭矩、剪力作用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1255097,"排水管道工程中常用的金属管有球墨铸铁管和（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"FRP管",{"key":24,"text":77,"correct":22},"UPVC管",{"key":27,"text":79,"correct":22},"HDPE管",{"key":31,"text":81,"correct":29},"PCCP管",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1255098,"整体式现浇钢筋混凝土池体结构施工流程（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"测量定位→土方开挖及地基处理→防水施工→垫层施工→底板浇筑→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":24,"text":89,"correct":22},"测量定位→土方开挖及地基处理→底板浇筑→垫层施工→防水施工→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":27,"text":91,"correct":29},"测量定位→土方开挖及地基处理→垫层施工→防水施工→底板浇筑→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":31,"text":93,"correct":22},"测量定位→土方开挖及地基处理→底板浇筑→防水施工→垫层施工→池壁及柱浇筑→顶板浇筑→功能性试验",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1255099,"适用于胶结松散的砾、卵石层的下沉方法（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"抓斗挖土法",{"key":24,"text":101,"correct":22},"辅助下沉法",{"key":27,"text":103,"correct":22},"水枪冲土法",{"key":31,"text":105,"correct":22},"人工或风动工具挖土法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1255100,"上层土质较好、下层土质松软，当环境条件许可、沟槽深度不超过4.5m时，可采用（ ）断面。",[110,112,114,116],{"key":20,"text":111,"correct":22},"直槽",{"key":24,"text":113,"correct":22},"梯形槽",{"key":27,"text":115,"correct":29},"混合槽",{"key":31,"text":117,"correct":22},"联合槽",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1255101,"无压管道应进行管道的严密性试验，严密性试验分为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"闭水试验和闭气试验",{"key":24,"text":125,"correct":22},"闭水试验和水压试验",{"key":27,"text":127,"correct":22},"强度试验和闭气试验",{"key":31,"text":129,"correct":22},"强度试验和闭水试验",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1255102,"公路铺筑面外侧据乔木中心不小于（ ）m，据灌木边缘不小于（ ）m。",[134,136,138,140],{"key":20,"text":135,"correct":22},"0.75，不宜种",{"key":24,"text":137,"correct":29},"0.8，2.00",{"key":27,"text":139,"correct":22},"1.00，0.50",{"key":31,"text":141,"correct":22},"2.00，0.50",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1255103,"当管道内径大于700mm时，可按管道井段数量抽样选取（ ）进行闭水试验；试验不合格时，抽样井段数量应在原抽样基础上加倍进行试验。",[146,148,150,152],{"key":20,"text":147,"correct":22},"1\u002F2",{"key":24,"text":149,"correct":29},"1\u002F3",{"key":27,"text":151,"correct":22},"1\u002F4",{"key":31,"text":153,"correct":22},"1\u002F5",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1255104,"下列选项中，不属于排水管道施工的工序是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"下管、排管",{"key":24,"text":161,"correct":29},"稳管、接口",{"key":27,"text":163,"correct":22},"试压",{"key":31,"text":165,"correct":22},"质量检查与验收",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1255105,"排水检查井所用的混凝土强度一般不宜低于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"C10",{"key":24,"text":173,"correct":22},"C15",{"key":27,"text":175,"correct":29},"C20",{"key":31,"text":177,"correct":22},"C30",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1255106,"排水沟断面尺寸一般为（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"10cm×10cm",{"key":24,"text":185,"correct":29},"30cm×30cm",{"key":27,"text":187,"correct":22},"50m×50cm",{"key":31,"text":189,"correct":22},"100cm×100cm",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1255107,"我国城市燃气管道按压力进行分类，低压燃气管道输气压力P",[194,196,198,200],{"key":20,"text":195,"correct":22},"0.001",{"key":24,"text":197,"correct":29},"0.01",{"key":27,"text":199,"correct":22},"0.1",{"key":31,"text":201,"correct":22},"1",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1255108,"下列属于聚乙烯给水管道连接方式的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":29},"法兰",{"key":24,"text":209,"correct":22},"承插口",{"key":27,"text":211,"correct":22},"螺纹",{"key":31,"text":213,"correct":22},"焊接",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1255109,"城市给水管道工程中，橡胶圈接口不适用于（ ）。",[218,220,221,222],{"key":20,"text":219,"correct":22},"橡胶圈",{"key":24,"text":213,"correct":22},{"key":27,"text":207,"correct":22},{"key":31,"text":223,"correct":29},"丝扣",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":27,"analysis":33},1255110,"管棚超前支护技术施工工艺流程为（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"测放孔位→钻机就位→水平钻孔→压入钢管→移机→开挖→注浆→封口",{"key":24,"text":231,"correct":22},"钻机就位→测放孔位→水平钻孔→压入钢管→移机→开挖→注浆→封口",{"key":27,"text":233,"correct":29},"测放孔位→钻机就位→水平钻孔→压入钢管→移机→注浆→封口→开挖",{"key":31,"text":235,"correct":22},"钻机就位→测放孔位→水平钻孔→压入钢管→移机→注浆→封口→开挖",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1255111,"不属于排水管道施工的工序是（ ）。",[240,241,242,243],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":29},{"key":27,"text":163,"correct":22},{"key":31,"text":165,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},1255112,"不开槽施工方法中，一般情况下，浅埋暗挖法适用于直径（ ）管道施工。",[248,250,252,254],{"key":20,"text":249,"correct":22},"100～1000mm",{"key":24,"text":251,"correct":29},"2000mm以上",{"key":27,"text":253,"correct":22},"800～3000mm",{"key":31,"text":255,"correct":22},"3000mm以上",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":31,"analysis":33},1255113,"根据接口的弹性，不属于管道接口形式的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"柔性",{"key":24,"text":263,"correct":22},"刚性",{"key":27,"text":265,"correct":22},"半刚半柔性",{"key":31,"text":267,"correct":29},"弹性",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1255114,"道路上的井室必须使用（ ）装配稳固。",[272,274,276,278],{"key":20,"text":273,"correct":29},"重型井盖",{"key":24,"text":275,"correct":22},"轻型井盖",{"key":27,"text":277,"correct":22},"普通井盖",{"key":31,"text":279,"correct":22},"钢筋混凝土井盖",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},1255115,"给水管网中的阀门等附件一般安装在阀门井中，阀门井的形状有圆形和（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"椭圆形",{"key":24,"text":287,"correct":22},"方形",{"key":27,"text":289,"correct":29},"矩形",{"key":31,"text":291,"correct":22},"菱形",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},1255116,"盖挖逆作法的施工顺序（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"构筑围护结构之地下连续墙和结构中间桩柱→回填顶板以上土方→开挖施工结构顶板→往上施工地上建筑",{"key":24,"text":299,"correct":22},"开挖施工结构顶板→回填顶板以上土方→构筑围护结构之地下连续墙和结构中间桩柱→往上施工地上建筑",{"key":27,"text":301,"correct":29},"构筑围护结构之地下连续墙和结构中间桩柱→开挖施工结构顶板→回填顶板以上土方→往上施工地上建筑",{"key":31,"text":303,"correct":22},"开挖施工结构顶板→构筑围护结构之地下连续墙和结构中间桩柱→回填顶板以上土方→往上施工地上建筑",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":27,"analysis":33},1255117,"不属于常用沟槽支撑形式的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"横撑",{"key":24,"text":311,"correct":22},"竖撑",{"key":27,"text":313,"correct":29},"纵撑",{"key":31,"text":315,"correct":22},"板桩撑",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1255118,"直埋管道接头的一级管网的现场安装的接头密封应进行（ ）的气密性检验。",[320,322,324,326],{"key":20,"text":321,"correct":22},"20%",{"key":24,"text":323,"correct":22},"50%",{"key":27,"text":325,"correct":22},"80%",{"key":31,"text":327,"correct":29},"100%",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},1255119,"预制构件应按设计位置起吊，曲梁宜采用（ ）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"一点吊装",{"key":24,"text":335,"correct":22},"两点吊装",{"key":27,"text":337,"correct":29},"三点吊装",{"key":31,"text":339,"correct":22},"多点吊装",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1255120,"不属于洞口土体加固主要方法的是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":29},"SMW法",{"key":24,"text":347,"correct":22},"注浆法",{"key":27,"text":349,"correct":22},"高压喷射搅拌法",{"key":31,"text":351,"correct":22},"冻结法",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1255121,"GCL垫施工流程为（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":29},"基底检验→吊运就位→人工铺展→搭接宽度调整→搭接处撒膨润土粉→进行后续施工",{"key":24,"text":359,"correct":22},"基底检验→人工铺展→吊运就位→搭接宽度调整→搭接处撒膨润土粉→进行后续施工",{"key":27,"text":361,"correct":22},"基底检验→吊运就位→搭接宽度调整→人工铺展→搭接处撒膨润土粉→进行后续施工",{"key":31,"text":363,"correct":22},"基底检验→吊运就位→人工铺展→搭接处撒膨润土粉→搭接宽度调整→进行后续施工",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1255122,"泄水阀一般设置在阀门井中构成泄水阀井，当由于地形因素排水管不能直接将水排走时，还应建造一个与阀门井相连的（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"测流井",{"key":24,"text":371,"correct":22},"排水井",{"key":27,"text":373,"correct":22},"泄水井",{"key":31,"text":375,"correct":29},"湿井",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1255123,"水文气象不稳定、沉管距离较长、水流速度相对较大时，可采用（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"水面浮运法",{"key":24,"text":383,"correct":29},"铺管船法",{"key":27,"text":385,"correct":22},"底拖法",{"key":31,"text":387,"correct":22},"浮运发",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},1255124,"排水管道按照管体结构受力形式分为刚性管道和柔性管道两大类，下列选项中属于刚性管道的是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"玻璃纤维管",{"key":24,"text":395,"correct":22},"钢塑复合管",{"key":27,"text":397,"correct":29},"钢筋混凝土管",{"key":31,"text":399,"correct":22},"双壁波纹管",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},1255125,"顶管法施工管道的首节管是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"钢管",{"key":24,"text":407,"correct":22},"相同管材的管段",{"key":27,"text":409,"correct":29},"工具管",{"key":31,"text":411,"correct":22},"排水管",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},1255126,"花境布置形式以（ ）为主。",[416,418,420,422],{"key":20,"text":417,"correct":22},"组从状",{"key":24,"text":419,"correct":29},"带状自然式",{"key":27,"text":421,"correct":22},"带状组团式",{"key":31,"text":423,"correct":22},"点状自然式",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1255127,"“刃脚”的作用是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"满足下沉要求",{"key":24,"text":431,"correct":29},"减小下沉阻力",{"key":27,"text":433,"correct":22},"增加整体刚度",{"key":31,"text":435,"correct":22},"防止渗水",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1255128,"根据地下水量大小、基坑平面形状及水泵能力，集水井每隔（ ）m设置一个。",[440,442,444,446],{"key":20,"text":441,"correct":22},"10~20",{"key":24,"text":443,"correct":22},"20~30",{"key":27,"text":445,"correct":29},"30~40",{"key":31,"text":447,"correct":22},"40~50",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1255129,"沟槽支撑的目的是防止侧壁坍塌，为沟槽创造安全的施工条件。支撑材料通常由（ ）做成。",[452,454,456,458],{"key":20,"text":453,"correct":22},"管材或钢筋",{"key":24,"text":455,"correct":22},"混凝土预制构件",{"key":27,"text":457,"correct":29},"木材或钢材",{"key":31,"text":459,"correct":22},"塑性材料",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},1255130,"重力流排水管道铺设的顺序是（ ），排管时应将承口排向施工前进的方向。",[464,466,468,470],{"key":20,"text":465,"correct":22},"从上游开始顺水方向铺设",{"key":24,"text":467,"correct":22},"从上游开始逆水方向铺设",{"key":27,"text":469,"correct":22},"从下游开始顺水方向铺设",{"key":31,"text":471,"correct":29},"从下游开始逆水方向铺设",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1255131,"进货质量应核验产品出厂三证，下列不属于三证的是（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"产品合格证",{"key":24,"text":479,"correct":22},"产品说明书",{"key":27,"text":481,"correct":29},"产品成分报告单",{"key":31,"text":483,"correct":22},"产品试验报告单",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},1255132,"城市给水管道主要基础类型不包括（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"天然基础",{"key":24,"text":491,"correct":22},"砂基础",{"key":27,"text":493,"correct":29},"碎石基础",{"key":31,"text":495,"correct":22},"混凝土基础",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1255133,"正确选定沟槽的（ ），可以为后续施工过程创造良好条件，保证工程质量和施工安全，以及减少开挖土方量。",[500,502,504,506],{"key":20,"text":501,"correct":22},"施工人员",{"key":24,"text":503,"correct":22},"施工机械",{"key":27,"text":505,"correct":22},"开挖进度",{"key":31,"text":507,"correct":29},"开挖断面",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1255134,"构筑物满水试验程序为（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":29},"实验准备→水池注水→水池内水位观测→蒸发量测定→有关资料整理",{"key":24,"text":515,"correct":22},"有关资料整理→实验准备→水池注水→水池内水位观测→蒸发量测定",{"key":27,"text":517,"correct":22},"实验准备→水池注水→蒸发量测定→水池内水位观测→有关资料整理",{"key":31,"text":519,"correct":22},"有关资料整理→实验准备→水池注水→蒸发量测定→水池内水位观测",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1255135,"双侧壁导坑法施工顺序是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"开挖上部核心土→开挖下台阶→施作内层衬砌→开挖一侧导坑→开挖另一侧导坑→拆除导坑临空部分的支护",{"key":24,"text":527,"correct":22},"开挖一侧导坑→开挖另一侧导坑→施作内层衬砌→开挖上部核心土→开挖下台阶→拆除导坑临空部分的支护",{"key":27,"text":529,"correct":22},"开挖上部核心土→开挖下台阶→开挖一侧导坑→开挖另一侧导坑→拆除导坑临空部分的支护→施作内层衬砌",{"key":31,"text":531,"correct":29},"开挖一侧导坑→开挖另一侧导坑→开挖上部核心土→开挖下台阶→拆除导坑临空部分的支护→施作内层衬砌",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1255136,"机械式接口球墨铸铁管施工工艺流程为（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"清理插口、压兰和橡胶圈→下管→清理承口→对口→刷润滑剂→临时紧固→螺栓全方位紧固→检查螺栓扭矩",{"key":24,"text":539,"correct":22},"下管→清理插口、压兰和橡胶圈→清理承口→对口→刷润滑剂→临时紧固→螺栓全方位紧固→检查螺栓扭矩",{"key":27,"text":541,"correct":22},"清理插口、压兰和橡胶圈→下管→清理承口→刷润滑剂→对口→临时紧固→螺栓全方位紧固→检查螺栓扭矩",{"key":31,"text":543,"correct":29},"下管→清理插口、压兰和橡胶圈→清理承口→刷润滑剂→对口→临时紧固→螺栓全方位紧固→检查螺栓扭矩",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1255137,"当管底为岩石、碎石或多石地基时，对金属管道应铺垫不小于（ ）mm厚的中砂或粗砂，构成给水管道砂基础。",[548,550,552,554],{"key":20,"text":549,"correct":22},"50",{"key":24,"text":551,"correct":29},"100",{"key":27,"text":553,"correct":22},"150",{"key":31,"text":555,"correct":22},"200",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1255138,"采用HDPE膜防渗技术的核心是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"HDPE膜的进货质量",{"key":24,"text":563,"correct":22},"HDPE膜的机具",{"key":27,"text":565,"correct":22},"HDPE膜的施工季节合理性",{"key":31,"text":567,"correct":29},"HDPE膜的施工质量",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1255139,"支撑结构挡土的应力传递路径（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":29},"围护（桩）墙→围檩（冠梁）→支撑",{"key":24,"text":575,"correct":22},"围檩（冠梁）→围护（桩）墙→支撑",{"key":27,"text":577,"correct":22},"围护（桩）墙→支撑→围檩（冠梁）",{"key":31,"text":579,"correct":22},"支撑→围护（桩）墙→围檩（冠梁）",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1255140,"改进施工方法和改变施工机具为加快工程进度，属于动态控制中的（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"组织措施",{"key":24,"text":587,"correct":22},"经济措施",{"key":27,"text":589,"correct":22},"合同措施",{"key":31,"text":591,"correct":29},"技术措施",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},1255141,"总结经验，改正缺点，并将遗留问题转人下一轮循环是PDCA中的（ ）阶段。",[596,598,600,602],{"key":20,"text":597,"correct":22},"计划",{"key":24,"text":599,"correct":22},"执行",{"key":27,"text":601,"correct":22},"检查",{"key":31,"text":603,"correct":29},"处置",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":20,"analysis":33},1255142,"下列选项中，不属于矩阵式项目组织的优点是（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":29},"职责明确，职能专一，关系简单",{"key":24,"text":611,"correct":22},"兼有部门控制式和工作队式两种组织的优点",{"key":27,"text":613,"correct":22},"以尽可能少的人力，实现多个项目的管理",{"key":31,"text":615,"correct":22},"有利于人才的全面培养",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]