[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,5,50,1169,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,345,357,366,378,390,402,414,426,435,447,459,471,483,495,507,519,531,543,555,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1254986,1,"单选题","下列关于砌筑砂浆的组成材料及其技术要求的说法中，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","M15及以下强度等级的砌筑砂浆宜选用42.5级通用硅酸盐水泥或砌筑水泥",false,{"key":24,"text":25,"correct":26},"B","砌筑砂浆常用的细骨料为普通砂。砂的含泥量不应超过5%",true,{"key":28,"text":29,"correct":22},"C","生石灰熟化成石灰膏时，应用孔径不大于3mm×3mm的网过滤，熟化时间不得少于7d；磨细生石灰粉的熟化时间不得少于3d",{"key":31,"text":32,"correct":22},"D","制作电石膏的电石渣应用孔径不大于3mm×3mm的网过滤，检验时应加热至70℃并保持60min，没有乙炔气味后，方可使用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1254987,"厚度大于（ ）的钢板为厚板。",[38,40,42,44],{"key":20,"text":39,"correct":22},"2mm",{"key":24,"text":41,"correct":22},"3mm",{"key":28,"text":43,"correct":26},"4mm",{"key":31,"text":45,"correct":22},"5mm",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1254988,"表征水泥力学性能的重要指标是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"水泥安定性",{"key":24,"text":53,"correct":22},"细度",{"key":28,"text":55,"correct":22},"水化热",{"key":31,"text":57,"correct":26},"胶砂强度",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1254989,"（ ）级钢冲击韧性很好，具有较强的抗冲击、振动荷载的能力，尤其适宜在较低温度下使用。",[62,64,66,68],{"key":20,"text":63,"correct":22},"Q235A",{"key":24,"text":65,"correct":22},"Q235B",{"key":28,"text":67,"correct":22},"Q235C",{"key":31,"text":69,"correct":26},"Q235D",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1254990,"下列关于烧结砖的分类、主要技术要求及应用的相关说法中，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"强度、抗风化性能和放射性物质合格的烧结普通砖，根据尺寸偏差、外观质量、泛霜和石灰爆裂等指标，分为优等品、一等品、合格品三个等级",{"key":24,"text":77,"correct":22},"强度和抗风化性能合格的烧结空心砖，根据尺寸偏差、外观质量、孔型及孔洞排列、泛霜、石灰爆裂分为优等品、一等品二个等级",{"key":28,"text":79,"correct":22},"烧结多孔砖主要用作非承重墙，如多层建筑内隔墙或框架结构的填充墙",{"key":31,"text":81,"correct":22},"烧结空心砖在对安全性要求低的建筑中，可以用于承重墙体",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1254991,"按沥青混合料中剩余空隙率大小的不同分类，压实后剩余空隙率大于18％的沥青混合料称为（ ）沥青混合料。",[86,88,90,92],{"key":20,"text":87,"correct":26},"开式",{"key":24,"text":89,"correct":22},"半开式",{"key":28,"text":91,"correct":22},"封闭式",{"key":31,"text":93,"correct":22},"密实式",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1254992,"混凝土拌和物的主要技术性质为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"强度",{"key":24,"text":101,"correct":26},"和易性",{"key":28,"text":103,"correct":22},"变形",{"key":31,"text":105,"correct":22},"耐久性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1254993,"下列关于建筑工程常用的特性水泥的特性及应用的表述中，不正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"白水泥和彩色水泥主要用于建筑物内外的装饰",{"key":24,"text":113,"correct":22},"膨胀水泥主要用于收缩补偿混凝土工程，防渗混凝土，防身砂浆，结构的加固，构件接缝、接头的灌浆，固定设备的机座及地脚螺栓等",{"key":28,"text":115,"correct":26},"快硬水泥易受潮变质，故储运时须特别注意防潮，并应及时使用，不宜久存，出厂超过3个月，应重新检验，合格后方可使用",{"key":31,"text":117,"correct":22},"快硬硅酸盐水泥可用于紧急抢修工程、低温施工工程等，可配制成早强、高等级混凝土",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1254994,"下列表述，不属于高性能混凝土的主要特性的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"具有一定的强度和高抗渗能力",{"key":24,"text":125,"correct":22},"具有良好的工作性",{"key":28,"text":127,"correct":26},"力学性能良好",{"key":31,"text":129,"correct":22},"具有较高的体积稳定性",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1254995,"我国道路石油沥青的标准指标反映的沥青性质也不相同，其中反映沥青施工安全的指标是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"蜡含量",{"key":24,"text":137,"correct":26},"闪点",{"key":28,"text":139,"correct":22},"延度",{"key":31,"text":141,"correct":22},"软化点",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1254996,"在低气温地区可选择（ ）的沥青，以便冬季低温时有较好的变形能力，防止路面低温开裂。",[146,148,150,152],{"key":20,"text":147,"correct":22},"较高稠度",{"key":24,"text":149,"correct":26},"较低稠度",{"key":28,"text":151,"correct":22},"较高的粘度",{"key":31,"text":153,"correct":22},"较低的粘度",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1254997,"下列关于砌筑砂浆主要技术性质的说法中，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"砌筑砂浆的技术性质主要包括新版砂浆的密度、和易性、硬化砂浆强度和对基面的粘结力、抗冻性、收缩值等指标",{"key":24,"text":161,"correct":22},"流动性的大小用“沉入度”表示，通常用砂浆稠度测定仪测定",{"key":28,"text":163,"correct":22},"砂浆流动性的选择与砌筑种类、施工方法及天气情况有关。流动性过大，砂浆太稀，不仅铺砌难，而且硬化后强度降低；流动性过小，砂浆太稠，难于铺平",{"key":31,"text":165,"correct":26},"砂浆的强度是以5个150mm×150mm×150mm的立方体试块，在标准条件下养护28d后，用标准方法测得的抗压强度（MPa）算术平均值来评定的",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1254998,"气硬性胶凝材料一般只适用于（ ）环境中。",[170,172,174,176],{"key":20,"text":171,"correct":26},"干燥",{"key":24,"text":173,"correct":22},"干湿交替",{"key":28,"text":175,"correct":22},"潮湿",{"key":31,"text":177,"correct":22},"水中",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1254999,"下列不属于碎（砂）石桩法施工的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"振冲法施工",{"key":24,"text":185,"correct":22},"振动沉管法施工",{"key":28,"text":187,"correct":22},"锤击沉管法施工",{"key":31,"text":189,"correct":26},"水冲法施工",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1255000,"对于饱和夹砂的黏性土地层，可采用（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"强夯置换法",{"key":24,"text":197,"correct":22},"真空预压法",{"key":28,"text":199,"correct":26},"降水联合低能级强夯法",{"key":31,"text":201,"correct":22},"换填法",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1255001,"城镇道路由很多不同功能部分组成，其中供有动力装置的车辆行驶的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"人行道",{"key":24,"text":209,"correct":22},"非机动车道",{"key":28,"text":211,"correct":26},"机动车道",{"key":31,"text":213,"correct":22},"混合车道",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1255002,"当土质较差有严重流沙现象，可采用（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"明沟排水法",{"key":24,"text":221,"correct":26},"井点降水法",{"key":28,"text":223,"correct":22},"管井降水法",{"key":31,"text":225,"correct":22},"集水坑排水法",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1255003,"纵缝间距超过（ ）m时，应在板中线上设纵向缩缝。",[230,232,234,236],{"key":20,"text":231,"correct":22},"2",{"key":24,"text":233,"correct":22},"3",{"key":28,"text":235,"correct":26},"4",{"key":31,"text":237,"correct":22},"5",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1255004,"修筑道路垫层常用材料有两类：一类是整体性材料；另一类是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"松散性",{"key":24,"text":245,"correct":26},"松散颗粒",{"key":28,"text":247,"correct":22},"松散石料",{"key":31,"text":249,"correct":22},"松散土",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1255005,"一根20m的预制桩吊点数目应为（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"一点起吊",{"key":24,"text":257,"correct":26},"二点起吊",{"key":28,"text":259,"correct":22},"三点起吊",{"key":31,"text":261,"correct":22},"四点起吊",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1255006,"城市道路路面按力学特性分类，可分为柔性路面和（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"弹性路面",{"key":24,"text":269,"correct":22},"塑性路面",{"key":28,"text":271,"correct":26},"刚性路面",{"key":31,"text":273,"correct":22},"脆性路面",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1255007,"护筒埋设方法适于旱地或水中的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"下埋式",{"key":24,"text":281,"correct":26},"上埋式",{"key":28,"text":283,"correct":22},"下沉式",{"key":31,"text":285,"correct":22},"上浮式",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},1255008,"高压喷射注浆法施工工序为（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"机具就位→置入喷射管→钻孔→喷射注浆→拔管→冲洗",{"key":24,"text":293,"correct":22},"机具就位→钻孔→拔管→置入喷射管→喷射注浆→冲洗",{"key":28,"text":295,"correct":26},"机具就位→钻孔→置入喷射管→喷射注浆→拔管→冲洗",{"key":31,"text":297,"correct":22},"钻孔→机具就位→置入喷射管→喷射注浆→拔管→冲洗",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1255009,"封闭泥浆的7d立方体抗压强度宜为（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"0.3～0.5MPa",{"key":24,"text":305,"correct":22},"0.5～0.8MPa",{"key":28,"text":307,"correct":22},"1.0～1.2MPa",{"key":31,"text":309,"correct":22},"1.2～1.5MPa",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1255010,"石灰土基层施工路拌法施工工艺流程（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"土料铺摊→整平、轻压→拌合→石灰铺摊→整形→碾压成型→养护",{"key":24,"text":317,"correct":26},"土料铺摊→整平、轻压→石灰铺摊→拌合→整形→碾压成型→养护",{"key":28,"text":319,"correct":22},"土料铺摊→整平、轻压→拌合→整形→石灰铺摊→碾压成型→养护",{"key":31,"text":321,"correct":22},"土料铺摊→石灰铺摊→整平、轻压→拌合→整形→碾压成型→养护",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1255011,"用灌砂法检查压实度时，取土样的底面位置为每一压实层底部；用环刀法试验时，环刀位于压实层厚的（ ）深度。",[326,328,330,332],{"key":20,"text":327,"correct":22},"顶面",{"key":24,"text":329,"correct":22},"1\u002F3",{"key":28,"text":331,"correct":26},"1\u002F2",{"key":31,"text":333,"correct":22},"底部",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1255012,"路缘石采用M10水泥砂浆灌缝，灌缝密实后，常温养护不得少于（ ）天。",[338,339,341,343],{"key":20,"text":233,"correct":22},{"key":24,"text":340,"correct":22},"7",{"key":28,"text":342,"correct":26},"14",{"key":31,"text":344,"correct":22},"28",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1255013,"城镇道路设计是通过（ ）把设计成果反映出来，它们之间相互制约、相辅相成。",[349,351,353,355],{"key":20,"text":350,"correct":22},"平、纵两方面",{"key":24,"text":352,"correct":22},"平、横两方面",{"key":28,"text":354,"correct":22},"纵、横两方面",{"key":31,"text":356,"correct":26},"平、纵、横三方面",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":28,"analysis":33},1255014,"塑料排水带应反复对折（ ）次不断裂才认为合格。",[361,362,363,364],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":22},{"key":28,"text":237,"correct":26},{"key":31,"text":365,"correct":22},"10",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1255015,"砂石铺筑垫层施工应按（ ）的顺序进行。",[370,372,374,376],{"key":20,"text":371,"correct":26},"先深后浅",{"key":24,"text":373,"correct":22},"先浅后深",{"key":28,"text":375,"correct":22},"先上后下",{"key":31,"text":377,"correct":22},"先下后上",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1255016,"路基边桩是为了（ ），同一桩号但不同层时，边桩的位置（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"控制上土范围，不同",{"key":24,"text":385,"correct":22},"控制路肩范围，相同",{"key":28,"text":387,"correct":22},"控制上土范围，相同",{"key":31,"text":389,"correct":22},"控制路肩范围，不同",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1255017,"下列选项中，不属于城镇道路地下设施的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"给水管",{"key":24,"text":397,"correct":26},"检查井",{"key":28,"text":399,"correct":22},"排水管",{"key":31,"text":401,"correct":22},"地下通道",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},1255018,"城镇道路路拱横坡度的确定原则，不包括（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"有利于路面排水顺畅",{"key":24,"text":409,"correct":22},"保证行车安全",{"key":28,"text":411,"correct":22},"保证行车平稳",{"key":31,"text":413,"correct":26},"保证行车道宽度",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},1255019,"市政道路基层施工中，水泥稳定土类材料宜在冬期开始前（ ）天完成施工。",[418,420,422,424],{"key":20,"text":419,"correct":22},"7~14",{"key":24,"text":421,"correct":22},"14~21",{"key":28,"text":423,"correct":26},"15~30",{"key":31,"text":425,"correct":22},"30~45",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1255020,"路基填土压实，应严格控制土壤的压实含水量在最佳含水量的±（ ）％以内。",[430,432,433,434],{"key":20,"text":431,"correct":22},"1",{"key":24,"text":231,"correct":26},{"key":28,"text":233,"correct":22},{"key":31,"text":235,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},1255021,"地面横坡不陡于（ ）且路堤高超过0.5m时，基底可不做处理。",[439,441,443,445],{"key":20,"text":440,"correct":22},"1：2",{"key":24,"text":442,"correct":22},"1：3",{"key":28,"text":444,"correct":22},"1：5",{"key":31,"text":446,"correct":26},"1：10",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},1255022,"城镇道路分隔带中，为防止越道逆行而设在道路中线位置，将左右或上下行车道分开的是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"中心分隔带",{"key":24,"text":454,"correct":26},"中央分隔带",{"key":28,"text":456,"correct":22},"中线分隔带",{"key":31,"text":458,"correct":22},"路中分隔带",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1255023,"设置在特大或大城市外环，主要为城镇间提供大流量、长距离的快速交通服务，为联系城镇各主要功能分区及为过境交通服务的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":26},"快速路",{"key":24,"text":466,"correct":22},"主干路",{"key":28,"text":468,"correct":22},"次干路",{"key":31,"text":470,"correct":22},"支路",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},1255024,"基层施工中（ ）采用帖薄层方法整平修补表面。",[475,477,479,481],{"key":20,"text":476,"correct":22},"必须",{"key":24,"text":478,"correct":22},"可以",{"key":28,"text":480,"correct":22},"不宜",{"key":31,"text":482,"correct":26},"严禁",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":28,"analysis":33},1255025,"真空预压的施工顺序一般为（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"设置竖向排水体→铺设排水垫层→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":24,"text":490,"correct":22},"铺设排水垫层→设置竖向排水体→开挖边沟→埋设滤管→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":28,"text":492,"correct":26},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":31,"text":494,"correct":22},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→抽空→铺膜、填沟、安装射流泵等→抽真空、预压",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1255026,"路堤填方施工工艺流程为（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"现场清理、填前碾压→碾压→填筑→质量检验",{"key":24,"text":502,"correct":26},"现场清理、填前碾压→填筑→碾压→质量检验",{"key":28,"text":504,"correct":22},"现场清理、填前碾压→碾压→质量检验→填筑",{"key":31,"text":506,"correct":22},"现场清理、填前碾压→质量检验→填筑→碾压",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":28,"analysis":33},1255027,"城镇道路横断面的布置应结合地形、地貌，进行科学合理布置，下列有关横断面布置形式，说法正确的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"沿坡地布置时，当车行道中线高程接近坡地地面时，采用路堑式布置",{"key":24,"text":514,"correct":22},"沿坡地布置时，当车行道中线高程低于或高于谷地地面时，采用半填半挖式布置",{"key":28,"text":516,"correct":26},"沿谷地布置时，当车行道中线高程接近谷地地面时，采用路堑式布置",{"key":31,"text":518,"correct":22},"沿谷地布置时，当车行道中线高程低于或高于谷地地面时，采用半填半挖式布置",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},1255028,"沥青混合料面层基本施工工艺流程为（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"洒布车撒布→洒布石屑→人工补撒→养护",{"key":24,"text":526,"correct":22},"洒布车撒布→养护→人工补撒→洒布石屑",{"key":28,"text":528,"correct":22},"洒布车撒布→洒布石屑→养护→人工补撒",{"key":31,"text":530,"correct":26},"洒布车撒布→人工补撒→洒布石屑→养护",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1255029,"深层搅拌法固化剂的主剂是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"混凝土",{"key":24,"text":538,"correct":22},"减水剂",{"key":28,"text":540,"correct":26},"水泥浆",{"key":31,"text":542,"correct":22},"粉煤灰",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1255030,"浆砌块石基础石料一般以（ ）为宜。",[547,549,551,553],{"key":20,"text":548,"correct":22},"石灰岩",{"key":24,"text":550,"correct":26},"花岗岩",{"key":28,"text":552,"correct":22},"页岩",{"key":31,"text":554,"correct":22},"玄武岩",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},1255031,"沥青混凝土路面的基层对（ ）没有要求。",[559,561,563,564],{"key":20,"text":560,"correct":26},"耐磨性",{"key":24,"text":562,"correct":22},"刚度",{"key":28,"text":99,"correct":22},{"key":31,"text":565,"correct":22},"稳定性",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},1255032,"石灰粉煤灰稳定砂砾施工工艺流程为（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":26},"拌合、运输→摊铺与整形→碾压成型→养护",{"key":24,"text":573,"correct":22},"摊铺与整形→养护→拌合、运输→碾压成型",{"key":28,"text":575,"correct":22},"拌合、运输→碾压成型→摊铺与整形→养护",{"key":31,"text":577,"correct":22},"摊铺与整形→拌合、运输→碾压成型→养护",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},1255033,"进行地基处理施工，下列地层中适用强夯法的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"淤泥",{"key":24,"text":585,"correct":26},"黏性土",{"key":28,"text":587,"correct":22},"沼泽土",{"key":31,"text":589,"correct":22},"腐殖土",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":28,"analysis":33},1255034,"路缘石背后应（ ）支撑，并还土夯实。还土夯实宽度不宜小于50cm。",[594,596,598,600],{"key":20,"text":595,"correct":22},"填土",{"key":24,"text":597,"correct":22},"填砂",{"key":28,"text":599,"correct":26},"浇注水泥混凝土",{"key":31,"text":601,"correct":22},"填筑砂浆",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},1255035,"绘制横断面图的比例尺一般为1：100或（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":26},"1：200",{"key":24,"text":609,"correct":22},"1：300",{"key":28,"text":611,"correct":22},"1：400",{"key":31,"text":613,"correct":22},"1：500",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]