[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,15,50,1169,[13,38,53,68,83,98,112,126,141,155,170,184,198,212,226,241,255,270,285,300,315,330,345,359,373,387,401,411,424,438,452,466,480,494,509,523,534,549,564,578,592,607,621,635,650,664,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1255506,2,"多选题","下列关于现浇（预应力）钢筋混凝土水池施工的说法中，错误的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","池壁与顶板连续施工时，赤壁内模立柱同时作为顶板模板立柱",true,{"key":24,"text":25,"correct":26},"B","止水带安装应牢固，位置准确，其中心线与变形缝中心线对正，带面不得有裂纹、孔洞等",false,{"key":28,"text":29,"correct":26},"C","钢筋安装质量检验应在混凝土浇筑之前对安装完毕的钢筋进行隐蔽验收",{"key":31,"text":32,"correct":26},"D","张拉段无粘结预应力筋长度小于25m时，宜采用一端张拉",{"key":34,"text":35,"correct":22},"E","混凝土浇筑后应加遮盖洒水养护，保持湿润并不应少于28d。洒水养护至达到规范规定的强度","AE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1255507,"市政公用工程施工现场的管理内容包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"合理规划施工用地",{"key":24,"text":45,"correct":26},"做好施工进度计划",{"key":28,"text":47,"correct":22},"适时调整施工现场总平面布置",{"key":31,"text":49,"correct":22},"对现场的使用要有检查",{"key":34,"text":51,"correct":22},"建立文明的施工现场","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1255508,"施工项目资源管理主要是对项目所需的（ ）进行的计划、组织、指挥、协调和控制活动。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"人力",{"key":24,"text":60,"correct":22},"材料",{"key":28,"text":62,"correct":22},"机械设备",{"key":31,"text":64,"correct":22},"技术",{"key":34,"text":66,"correct":26},"临时设施","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1255509,"施工项目管理的对象是施工项目全寿命各阶段的工作，主要包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"投资决策阶段管理",{"key":24,"text":75,"correct":22},"投标签约阶段管理",{"key":28,"text":77,"correct":22},"施工准备阶段管理",{"key":31,"text":79,"correct":22},"施工阶段管理",{"key":34,"text":81,"correct":22},"回访保修阶段的管理","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1255510,"施工项目目标控制的任务主要有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"质量目标控制",{"key":24,"text":90,"correct":22},"进度目标控制",{"key":28,"text":92,"correct":26},"投资目标控制",{"key":31,"text":94,"correct":22},"安全和环境目标控制",{"key":34,"text":96,"correct":22},"成本目标控制","ABDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":97,"analysis":37},1255511,"施工项目目标控制的措施主要有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"组织措施",{"key":24,"text":105,"correct":22},"技术措施",{"key":28,"text":107,"correct":26},"法律措施",{"key":31,"text":109,"correct":22},"经济措施",{"key":34,"text":111,"correct":22},"合同措施",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},1255512,"市政工程施工现场管理中要求，项目部应在门口公示以下标牌（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"工程概况牌",{"key":24,"text":119,"correct":26},"施工进度图",{"key":28,"text":121,"correct":22},"安全纪律牌",{"key":31,"text":123,"correct":22},"施工总平面图",{"key":34,"text":125,"correct":22},"施工项目经理部组织及主要管理人员名单图",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1255513,"下列选项中，属于部门控制项目组织的优点的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"有利于精简机构",{"key":24,"text":133,"correct":22},"人才作用发挥较充分",{"key":28,"text":135,"correct":22},"职责明确，职能专一",{"key":31,"text":137,"correct":22},"项目经理无须专门训练",{"key":34,"text":139,"correct":26},"有利于人才的全面培养","BCD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":52,"analysis":37},1255514,"项目组织结构图应反映项目经理与（ ）工作部门之间的组织关系。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"进度控制",{"key":24,"text":148,"correct":26},"信息管理",{"key":28,"text":150,"correct":22},"质量控制",{"key":31,"text":152,"correct":22},"材料采购",{"key":34,"text":154,"correct":22},"合同管理",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1255515,"工程定额具有以下几方面的作用（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"编制招标工程标底及投标报价的依据",{"key":24,"text":162,"correct":22},"确定建筑工程造价、编制竣工结算的依据",{"key":28,"text":164,"correct":22},"编制工程计划、组织和管理施工的重要依据",{"key":31,"text":166,"correct":26},"按生产要素分配及经济核算的依据",{"key":34,"text":168,"correct":22},"总结、分析和改进生产方法的手段","ABCE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":97,"analysis":37},1255516,"下列关于交通管理设施正确的是（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"标牌制作按不同版型以平方米计算",{"key":24,"text":177,"correct":22},"标杆制作按不同杆式类型以吨计算",{"key":28,"text":179,"correct":26},"门架制作以平方米计算",{"key":31,"text":181,"correct":22},"图案、文字按最大外围面积计算",{"key":34,"text":183,"correct":22},"双柱杆以吨计算",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":67,"analysis":37},1255517,"工程量清单计价应包括招标文件规定的完成工程量清单所列项目的全部费用，含（ ）几种。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"分部分项工程费",{"key":24,"text":191,"correct":22},"措施项目费",{"key":28,"text":193,"correct":22},"其他项目费和规费",{"key":31,"text":195,"correct":22},"税金",{"key":34,"text":197,"correct":26},"利润",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},1255518,"下列说法正确的是（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"钢筋混凝土方桩、板桩按桩长度乘以桩横断面面积计算",{"key":24,"text":205,"correct":26},"钢筋混凝土管桩按桩长度乘以桩横断面面积",{"key":28,"text":207,"correct":22},"钢筋混凝土管桩按桩长度乘以桩横断面面积，减去空心部分体积计算",{"key":31,"text":209,"correct":22},"现浇混凝土工程量以实体积计算，不扣除钢筋、铁丝、铁件等所占体积",{"key":34,"text":211,"correct":22},"预制混凝土计算中空心板梁的堵头板体积不计入工程量内",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":67,"analysis":37},1255519,"在钢筋工程量计算时，与钢筋计算长度有关的选项包括（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"构件图示尺寸",{"key":24,"text":219,"correct":22},"保护层总厚度",{"key":28,"text":221,"correct":22},"两端弯钩长度",{"key":31,"text":223,"correct":22},"图纸注明的搭接长度、弯起钢筋斜长的增加值",{"key":34,"text":225,"correct":26},"钢筋型号",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1255520,"市政管网工程量计算中，根据管道防腐面积计算规则，管道的外防腐面积取决于（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"管内径",{"key":24,"text":233,"correct":22},"管外径",{"key":28,"text":235,"correct":26},"管道公称直径",{"key":31,"text":237,"correct":22},"设计长度",{"key":34,"text":239,"correct":26},"施工长度","BD",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":36,"analysis":37},1255521,"某市政项目的独立土方工程，招标文件中估计工程量为100万m3，甲乙合同中约定；土方工程单价为6元\u002Fm3，当实际工程量超过估计工程量20％时，调整单价，单价调为4元\u002Fm3。工程结束时核算实际完成土方工程量为130万m3。 若因分部分项工程量清单漏项或非承包人原因引起的工程变更，造成增加新的工程量清单项目时，其对应的综合单价应按（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"合同中已有适用的综合单价，按合同中已有的综合单价确定",{"key":24,"text":248,"correct":26},"合同中已有适用的综合单价，按合同中类似的综合单价确定",{"key":28,"text":250,"correct":26},"合同中有类似的综合单价，按合同中已有的综合单价确定",{"key":31,"text":252,"correct":26},"合同中有适用或类似的综合单价，由承包人提出综合单价，经发包人确认后执行",{"key":34,"text":254,"correct":22},"合同中没有适用或类似的综合单价，由承包人提出综合单价，经发包人确认后执行",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1255522,"桥涵工程中，所计算的现浇混凝土工程量包含了（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"混凝土实体积",{"key":24,"text":262,"correct":26},"空心箱梁空心体积",{"key":28,"text":264,"correct":26},"空心板梁空心体积",{"key":31,"text":266,"correct":22},"钢筋、铁丝体积",{"key":34,"text":268,"correct":22},"预留压浆孔道体积","ADE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1255523,"路基（床）工程量计算时，利用土填方包括（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":26},"借土填方",{"key":24,"text":277,"correct":22},"本桩利用土填方",{"key":28,"text":279,"correct":22},"远运利用土填方",{"key":31,"text":281,"correct":26},"可利用方",{"key":34,"text":283,"correct":26},"弃方","BC",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1255524,"对原路面以下的路床部分说法正确的是（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"全部为换填土",{"key":24,"text":292,"correct":26},"全部为填方",{"key":28,"text":294,"correct":22},"部分为换填土部分为填方",{"key":31,"text":296,"correct":22},"以原地面线和路基顶面线较低者为界进行计算",{"key":34,"text":298,"correct":26},"以原地面线和路基顶面线较高者为界进行计算","CD",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1255525,"按执行范围或按主编单位分类，可分为（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"全国统一定额",{"key":24,"text":307,"correct":22},"地区统一定额",{"key":28,"text":309,"correct":26},"地区施工定额",{"key":31,"text":311,"correct":26},"企业施工定额",{"key":34,"text":313,"correct":22},"企业定额","ABE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1255526,"建设工程分类有多种形式，按建设用途可分为（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"生产性建设项目",{"key":24,"text":322,"correct":22},"非生产性建设项目",{"key":28,"text":324,"correct":26},"新建项目",{"key":31,"text":326,"correct":26},"扩建项目",{"key":34,"text":328,"correct":26},"临时项目","AB",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},1255527,"下列属于按定额的编制程序和用途来分类的定额是（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"施工定额",{"key":24,"text":337,"correct":26},"劳动定额",{"key":28,"text":339,"correct":22},"预算定额",{"key":31,"text":341,"correct":22},"概算定额",{"key":34,"text":343,"correct":26},"人工定额","ACD",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":97,"analysis":37},1255528,"道路路基工程的分项工程包括（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"土方路基",{"key":24,"text":352,"correct":22},"石方路基",{"key":28,"text":354,"correct":26},"沥青碎石基层",{"key":31,"text":356,"correct":22},"路基处理",{"key":34,"text":358,"correct":22},"路肩",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":269,"analysis":37},1255529,"下列关于土石方运输计算正确的是（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"推土机的运距按挖填方区的重心之间的直线距离计算",{"key":24,"text":366,"correct":26},"铲运机运距按循环运距的三分之一",{"key":28,"text":368,"correct":26},"铲运机运距按挖方区至弃土区重心之间的直线距离",{"key":31,"text":370,"correct":22},"铲运机运距按挖方区至弃土区重心之间的直线距离，另加转向运距45m",{"key":34,"text":372,"correct":22},"自卸汽车运距按循环路线的二分之一距离计算",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":52,"analysis":37},1255530,"市政工程定额的作用主要有（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"有利于节约社会劳动和提高生产率",{"key":24,"text":380,"correct":26},"为企业编制施工组织设计提供依据",{"key":28,"text":382,"correct":22},"有利于建筑市场公平竞争",{"key":31,"text":384,"correct":22},"有利于市场行为的规范",{"key":34,"text":386,"correct":22},"有利于完善市场的信息系统",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":169,"analysis":37},1255531,"工程量清单计价的特点有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"满足竞争的需要",{"key":24,"text":394,"correct":22},"竞争条件平等",{"key":28,"text":396,"correct":22},"有利于工程款的拨付",{"key":31,"text":398,"correct":26},"有利于避免风险",{"key":34,"text":400,"correct":22},"有利于建设单位对投资的控制",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":82,"analysis":37},1255532,"按用途分类，市政工程定额可分为（ ）。",[405,406,407,408,409],{"key":20,"text":337,"correct":26},{"key":24,"text":335,"correct":22},{"key":28,"text":339,"correct":22},{"key":31,"text":341,"correct":22},{"key":34,"text":410,"correct":22},"概算指标",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":82,"analysis":37},1255533,"计算工程量单价的价格依据包括（ ）。",[415,416,418,420,422],{"key":20,"text":341,"correct":26},{"key":24,"text":417,"correct":22},"人工单价",{"key":28,"text":419,"correct":22},"材料价格",{"key":31,"text":421,"correct":22},"材料运杂费",{"key":34,"text":423,"correct":22},"机械台班费",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":67,"analysis":37},1255534,"“土石方体积折算系数表”中规定了（ ）的折算系数。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"天然密实度体积",{"key":24,"text":431,"correct":22},"虚方体积",{"key":28,"text":433,"correct":22},"夯实后体积",{"key":31,"text":435,"correct":22},"松填体积",{"key":34,"text":437,"correct":26},"饱和体积",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":67,"analysis":37},1255535,"工程量清单计价与定额计价的差别有（ ）。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"编制工程量的单位不同",{"key":24,"text":445,"correct":22},"编制工程量清单的时间不同",{"key":28,"text":447,"correct":22},"表现形式不同",{"key":31,"text":449,"correct":22},"编制依据不同",{"key":34,"text":451,"correct":26},"适用范围不同",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":344,"analysis":37},1255536,"下列关于沟槽底宽计算方法正确的是（ ）。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"排水管道底宽按其管道基础宽度加两侧工作面宽度计算",{"key":24,"text":459,"correct":26},"给水燃气管道沟槽底宽按其管道基础宽度加两侧工作面宽度计算",{"key":28,"text":461,"correct":22},"给水燃气管道沟槽底宽按管道外径加两侧工作面宽度计算",{"key":31,"text":463,"correct":22},"支挡土板沟槽底宽除按规定计算外，每边另加0.1m",{"key":34,"text":465,"correct":26},"支挡土板沟槽底宽除按规定计算外，每边另减0.1m",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":479,"analysis":37},1255537,"预算定额包括（ ）。",[470,471,473,475,477],{"key":20,"text":337,"correct":22},{"key":24,"text":472,"correct":22},"材料消耗定额",{"key":28,"text":474,"correct":22},"机械台班使用定额",{"key":31,"text":476,"correct":26},"时间定额",{"key":34,"text":478,"correct":26},"产量定额","ABC",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":344,"analysis":37},1255538,"工程量清单计价的特点有（ ）几种。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"强制性",{"key":24,"text":487,"correct":26},"全面性",{"key":28,"text":489,"correct":22},"竞争性",{"key":31,"text":491,"correct":22},"通用性",{"key":34,"text":493,"correct":26},"并存性",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},1255539,"广联达定额计价软件中，定额子目输人的查询输入包括（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"定额查询",{"key":24,"text":501,"correct":22},"人材机查询",{"key":28,"text":503,"correct":26},"预算查询",{"key":31,"text":505,"correct":22},"条件查询",{"key":34,"text":507,"correct":26},"概算查询","ABD",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":97,"analysis":37},1255540,"以下各项中属于环境保护和文明施工管理的措施有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"防治大气污染措施",{"key":24,"text":516,"correct":22},"防治水污染措施",{"key":28,"text":518,"correct":26},"防治扬尘污染措施",{"key":31,"text":520,"correct":22},"防治施工噪声污染措施",{"key":34,"text":522,"correct":22},"防治固体废弃物污染措施",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":67,"analysis":37},1255541,"以下属于施工项目资源管理的内容的是（ ）。",[527,529,530,531,532],{"key":20,"text":528,"correct":22},"劳动力",{"key":24,"text":60,"correct":22},{"key":28,"text":64,"correct":22},{"key":31,"text":62,"correct":22},{"key":34,"text":533,"correct":26},"施工现场",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":548,"analysis":37},1255542,"以下各项中属于施工现场管理的内容的是（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":26},"落实资源进度计划",{"key":24,"text":541,"correct":22},"施工平面布置",{"key":28,"text":543,"correct":22},"施工现场封闭管理",{"key":31,"text":545,"correct":26},"施工资源进度计划的动态调整",{"key":34,"text":547,"correct":22},"警示标牌","BCE",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":563,"analysis":37},1255543,"下列关于施工项目目标控制的措施说法错误的是（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":26},"施工项目进度控制的措施主要有组织措施、技术措施、合同措施、经济措施",{"key":24,"text":556,"correct":22},"经济措施主要是建立健全目标控制组织，完善组织内各部门及人员的职责分工",{"key":28,"text":558,"correct":26},"技术措施主要是项目目标控制中所用的技术措施有两大类：一类是硬技术，即工艺技术；一类是软技术，即管理技术",{"key":31,"text":560,"correct":26},"合同措施是指严格执行和完成合同规定的一切内容，阶段性检查合同履行情况，对偏离合同的行为应及时采取纠正措施",{"key":34,"text":562,"correct":22},"组织措施是目标控制的基础，制定有关规章制度，保证制度的贯彻与执行，建立健全控制信息流通的渠道","BE",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":314,"analysis":37},1255544,"在Microsoftword文档中选定文本后，移动该文本的方法可以是（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"使用鼠标右键拖放",{"key":24,"text":571,"correct":22},"使用剪贴板",{"key":28,"text":573,"correct":26},"使用“查找”与“替换”功能",{"key":31,"text":575,"correct":26},"使用键盘控制键",{"key":34,"text":577,"correct":22},"使用鼠标左键拖放",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":82,"analysis":37},1255545,"Microsoftword文档的段落对齐方式包括（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":26},"整体对齐",{"key":24,"text":585,"correct":22},"居中对齐",{"key":28,"text":587,"correct":22},"两端对齐",{"key":31,"text":589,"correct":22},"右边对齐",{"key":34,"text":591,"correct":22},"左边对齐",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":606,"analysis":37},1255546,"以下有关MicrosoftExcel表格排序的说法中，正确有（ ）。",[596,598,600,602,604],{"key":20,"text":597,"correct":26},"只有数字类型可以作为排序的依据",{"key":24,"text":599,"correct":26},"只有日期类型可以作为排序的依据",{"key":28,"text":601,"correct":22},"笔画和拼音不能作为排序的依据",{"key":31,"text":603,"correct":26},"日期类型不能作为排序的依据",{"key":34,"text":605,"correct":22},"排序规则有升序和降序","CE",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":314,"analysis":37},1255547,"AutoCAD中的文字样式定义了文字的（ ）等参数。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"字体",{"key":24,"text":614,"correct":22},"高度",{"key":28,"text":616,"correct":26},"宽度",{"key":31,"text":618,"correct":26},"厚度",{"key":34,"text":620,"correct":22},"效果",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":140,"analysis":37},1255548,"AutoCAD所使用的坐标系包括（ ）。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"虚拟坐标系",{"key":24,"text":628,"correct":22},"笛卡尔坐标系",{"key":28,"text":630,"correct":22},"世界坐标系",{"key":31,"text":632,"correct":22},"用户坐标系",{"key":34,"text":634,"correct":26},"自定义坐标系",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":649,"analysis":37},1255549,"下列各项中，属于项目管理组织职能的是（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"组织设计",{"key":24,"text":642,"correct":22},"组织联系",{"key":28,"text":644,"correct":22},"组织运行",{"key":31,"text":646,"correct":22},"组织行为",{"key":34,"text":648,"correct":22},"组织调整","ABCDE",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":240,"analysis":37},1255550,"下列各项中，不属于施工项目管理的内容的是（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":26},"建立施工项目管理组织",{"key":24,"text":657,"correct":22},"编制《施工项目管理目标责任书》",{"key":28,"text":659,"correct":26},"施工项目的生产要素管理",{"key":31,"text":661,"correct":22},"施工项目的施工情况的评估",{"key":34,"text":663,"correct":26},"施工项目的信息管理",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":678,"analysis":37},1255551,"钢筋末端的标准弯钩可设置成（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":26},"45°",{"key":24,"text":671,"correct":26},"60°",{"key":28,"text":673,"correct":22},"90°",{"key":31,"text":675,"correct":22},"135°",{"key":34,"text":677,"correct":22},"180°","CDE",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":508,"analysis":37},1255552,"下列关于尺寸标注的说法中，错误的是（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"当尺寸线与图形轮廓重合时，可以省略尺寸线",{"key":24,"text":686,"correct":22},"尺寸起止符的起止方向与尺寸线成逆时针45°角",{"key":28,"text":688,"correct":26},"图上的尺寸，应以尺寸数字为准",{"key":31,"text":690,"correct":22},"尺寸排列标注时，长尺寸应靠近图形标注",{"key":34,"text":692,"correct":26},"在道路工程图中，线路的里程桩号以km为单位",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":67,"analysis":37},1255553,"城镇道路施工图主要包括（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"道路工程图",{"key":24,"text":700,"correct":22},"道路路面结构图",{"key":28,"text":702,"correct":22},"道路交叉工程图",{"key":31,"text":704,"correct":22},"灯光照明与绿化工程图",{"key":34,"text":706,"correct":26},"道路基础结构图",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":720,"analysis":37},1255554,"道路横断面图是沿道路中心线垂直方向的断面图，其包括（ ）。",[711,712,714,716,718],{"key":20,"text":700,"correct":26},{"key":24,"text":713,"correct":22},"路线标准横断面图",{"key":28,"text":715,"correct":26},"竖向设计图",{"key":31,"text":717,"correct":22},"路基一般设计图",{"key":34,"text":719,"correct":22},"特殊路基设计图","BDE",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":36,"analysis":37},1255556,"桥梁施工图中，钢筋混凝土结构图包括（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"构件构造图",{"key":24,"text":728,"correct":26},"桥梁总体布置图",{"key":28,"text":730,"correct":26},"桥梁地质断面图",{"key":31,"text":732,"correct":26},"桥梁平面图",{"key":34,"text":734,"correct":22},"钢筋结构图",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]