[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":732},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,14,50,1169,[13,33,48,63,77,92,107,121,136,151,166,181,193,207,221,236,250,265,279,294,309,323,337,351,366,380,395,409,423,437,451,465,479,494,508,522,536,550,564,578,592,607,620,634,645,660,675,690,704,718],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":31,"analysis":32},1255452,2,"多选题","桥梁总跨径是指多孔桥梁中各孔（ ）的总和。 A.计算跨径 B.净跨径 C.标准跨径 D.小跨径",[19,22,25,27,29],{"key":20,"text":20,"correct":21},"A",false,{"key":23,"text":23,"correct":24},"B",true,{"key":26,"text":26,"correct":24},"C",{"key":28,"text":28,"correct":24},"D",{"key":30,"text":30,"correct":21},"E","BCD","",{"id":34,"libraryId":5,"type":15,"typeLabel":16,"stem":35,"options":36,"answer":47,"analysis":32},1255453,"混凝土结构主要优点有（ ）。",[37,39,41,43,45],{"key":20,"text":38,"correct":24},"就地取材、用材合理",{"key":23,"text":40,"correct":24},"耐久性、防火性好",{"key":26,"text":42,"correct":24},"可模性好",{"key":28,"text":44,"correct":24},"整体性好",{"key":30,"text":46,"correct":21},"自重大","ABCD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":62,"analysis":32},1255455,"灌注桩钻孔中采用泥浆进行护壁，泥浆的主要性能指标的有（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":24},"密度",{"key":23,"text":55,"correct":24},"黏度",{"key":26,"text":57,"correct":21},"稠度",{"key":28,"text":59,"correct":24},"含砂率",{"key":30,"text":61,"correct":21},"含泥量","ABD",{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":47,"analysis":32},1255457,"桥面系主要包括桥面铺装、（ ）。",[67,69,71,73,75],{"key":20,"text":68,"correct":24},"人行道",{"key":23,"text":70,"correct":24},"防水及排水",{"key":26,"text":72,"correct":24},"伸缩装置",{"key":28,"text":74,"correct":24},"栏杆或护栏",{"key":30,"text":76,"correct":21},"桥板",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":91,"analysis":32},1255458,"桥下净空高度是指（ ）与桥跨结构最下缘之间的高差。",[81,83,85,87,89],{"key":20,"text":82,"correct":24},"设计水位",{"key":23,"text":84,"correct":21},"枯水位",{"key":26,"text":86,"correct":21},"历史最高水位",{"key":28,"text":88,"correct":24},"设计通航水位",{"key":30,"text":90,"correct":21},"历史最低水位","AD",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":106,"analysis":32},1255459,"下列关于桥梁围堰施工方法的是（ ）。",[96,98,100,102,104],{"key":20,"text":97,"correct":24},"土围堰",{"key":23,"text":99,"correct":24},"土袋围堰",{"key":26,"text":101,"correct":24},"间隔有桩围堰",{"key":28,"text":103,"correct":24},"钢板桩围堰",{"key":30,"text":105,"correct":24},"套箱围堰","ABCDE",{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":31,"analysis":32},1255460,"下列关于先张法和后张法预应力筋张拉的说法中正确的是（ ）。",[111,113,115,117,119],{"key":20,"text":112,"correct":21},"先张法预应力张拉时，应先调整到初应力，初应力宜为张拉控制应力（σcon）的10%～15%，伸长值应量测最终应力",{"key":23,"text":114,"correct":24},"同时张拉多根预应力筋时，应预先调整其初应力，是相互之间的应力一致，在正式分级整体张拉到控制应力",{"key":26,"text":116,"correct":24},"锚固完毕后并经检验合格后，即可切割端头多余的预应力筋。切割宜采用砂轮机，严禁使用电弧焊切割",{"key":28,"text":118,"correct":24},"张拉过程中，应使活动横梁与固定横梁始终保持平行，并应抽查预应力值，其偏差的绝对值不得超过按一个构件全部力筋预应力总值的5%",{"key":30,"text":120,"correct":21},"后张法预应力筋锚固后的外露长度不宜小于10cm，锚具应采用封端混凝土保护",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":135,"analysis":32},1255461,"钢筋混凝土梁内的钢筋骨架多由主筋、斜筋（弯起钢筋）、箍筋、架立钢筋和纵向防裂钢筋等组成，其中为满足斜截面抗剪强度而设置的钢筋有（ ）。",[125,127,129,131,133],{"key":20,"text":126,"correct":21},"主筋",{"key":23,"text":128,"correct":24},"斜筋（弯起钢筋）",{"key":26,"text":130,"correct":21},"箍筋",{"key":28,"text":132,"correct":24},"架立钢筋",{"key":30,"text":134,"correct":21},"纵向防裂钢筋","BD",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":150,"analysis":32},1255462,"某连续梁桥全长179m，拟采用悬臂浇筑法施工，挂篮的主桁部分采用三角形结构，行走为整体移动，其余采用竹胶板。其施工程序计划如下：①在墩顶托架上浇筑0号块并实施墩梁临时固结系统。②在0号块上安装悬臂挂篮，向两侧依次对称地分段浇筑主梁至合龙段。③在临时支架或梁端与边墩向临时托架上支模板浇筑现浇梁段。④主梁合龙段可在改装的简支挂篮托架上浇筑。 施工单位在合龙阶段拟采用下列措施，其中符合规范要求的有（ ）。",[140,142,144,146,148],{"key":20,"text":141,"correct":21},"合龙段的长度宜为1m",{"key":23,"text":143,"correct":24},"宜在一天中气温最低时进行",{"key":26,"text":145,"correct":24},"合龙前，在两端悬臂预加压重，并于浇筑混凝土过程中逐步撤除",{"key":28,"text":147,"correct":24},"合龙段的混凝土强度宜提高一级，以尽早施加预压力",{"key":30,"text":149,"correct":24},"连续梁的梁跨体系转换，应在合龙段及全部纵向连续预应力筋张拉、压浆完成，并解除各墩临时固结后进行","BCDE",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":165,"analysis":32},1255463,"城市桥梁按跨越障碍物的性质进行分类，有（ ）。",[155,157,159,161,163],{"key":20,"text":156,"correct":24},"跨河桥",{"key":23,"text":158,"correct":21},"钢架桥",{"key":26,"text":160,"correct":24},"高架桥",{"key":28,"text":162,"correct":24},"跨海桥",{"key":30,"text":164,"correct":24},"栈桥","ACDE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":32},1255464,"城市桥梁结构的组成，也可归纳为“五大部件”和“五小部件'，其中“五小部件”包括（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":24},"桥面铺装",{"key":23,"text":173,"correct":21},"支座",{"key":26,"text":175,"correct":24},"栏杆",{"key":28,"text":177,"correct":24},"伸缩缝",{"key":30,"text":179,"correct":21},"桥头搭板","ACD",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":150,"analysis":32},1255466,"桥梁结构的组成，也可归纳为“五大部件”和“五小部件”，下列选项中属于“五大部件”的有（ ）。",[185,186,188,189,191],{"key":20,"text":171,"correct":21},{"key":23,"text":187,"correct":24},"桥跨结构",{"key":26,"text":173,"correct":24},{"key":28,"text":190,"correct":24},"桥墩",{"key":30,"text":192,"correct":24},"基础",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":47,"analysis":32},1255467,"模板、拱架和支架的设计应符合国家现行标准（ ）的有关规定。",[197,199,201,203,205],{"key":20,"text":198,"correct":24},"《钢结构设计规范》GB50017-2003",{"key":23,"text":200,"correct":24},"《木结构设计规范》GB50005-2003",{"key":26,"text":202,"correct":24},"《组合钢模板技术规范》GB50214-2001",{"key":28,"text":204,"correct":24},"《公路桥涵钢结构及木结构设计规范》JTJ025-2000",{"key":30,"text":206,"correct":21},"《混凝土结构工程施工规范》GB506666-2011",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":150,"analysis":32},1255468,"现浇预应力混凝土盖梁施工应控制好（ ）四个环节。",[211,213,215,217,219],{"key":20,"text":212,"correct":21},"测量",{"key":23,"text":214,"correct":24},"支架搭设",{"key":26,"text":216,"correct":24},"拆除",{"key":28,"text":218,"correct":24},"预应力张拉",{"key":30,"text":220,"correct":24},"模板设计",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":235,"analysis":32},1255469,"梁式桥是一种使用最广泛的桥梁形式，可细分为（ ）。",[225,227,229,231,233],{"key":20,"text":226,"correct":24},"简支梁桥",{"key":23,"text":228,"correct":21},"刚构梁桥",{"key":26,"text":230,"correct":24},"连续梁桥",{"key":28,"text":232,"correct":21},"斜拉桥",{"key":30,"text":234,"correct":24},"悬臂梁桥","ACE",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":62,"analysis":32},1255470,"下列属于塑料类排水管材的主要有（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":24},"PVC双壁波纹管",{"key":23,"text":243,"correct":24},"HDPE双壁波纹管",{"key":26,"text":245,"correct":21},"衬塑钢管",{"key":28,"text":247,"correct":24},"金属内增强聚乙烯螺旋波纹管",{"key":30,"text":249,"correct":21},"铝塑复合管",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":264,"analysis":32},1255471,"下列关于沟槽开挖施工要点的说法中，错误的是（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":21},"当管径小、土方量少、施工现场狭窄、地下障碍物多无法采用机械挖土时采用人工开挖",{"key":23,"text":257,"correct":21},"相邻沟槽开挖时，应遵循先深后浅的施工顺序",{"key":26,"text":259,"correct":24},"采用机械挖土时，应使槽底留50cm左右厚度土层，由人工清槽底",{"key":28,"text":261,"correct":24},"已有地下管线与沟槽交叉或临近建筑物、电杆、测量标志时，应采取避开措施",{"key":30,"text":263,"correct":21},"穿越道路时，架设施工临时便桥，设置明显标志，做好交通导行措施","CD",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":135,"analysis":32},1255472,"下列关于门窗工程施工工艺的说法中，正确的是（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":21},"电热张拉顺序可由池壁底端开始，逐环向上",{"key":23,"text":272,"correct":24},"每一环预应力筋应对称张拉，并不得间断",{"key":26,"text":274,"correct":21},"必须重复张拉时，同一根钢筋的重复次数不得超过5次，发生裂纹时，应更换预应力筋",{"key":28,"text":276,"correct":24},"一般条件下，喷射保护层厚50mm，喷射作业宜在气温高于15℃时施工",{"key":30,"text":278,"correct":21},"在喷射保护层凝结后，应加遮盖、保持湿润不应小于28d",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":293,"analysis":32},1255473,"下列关于城市绿化植物与有关设施的距离要求的说法中，表述正确的是（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":21},"电线电压380V，树枝至电线的水平距离及垂直距离均不小于1.50m",{"key":23,"text":286,"correct":24},"电线电压3000～10000V，树枝至电线的水平距离及垂直距离均不小于3.00m",{"key":26,"text":288,"correct":21},"乔木中心与各种地下管线边缘的间距均不小于2.00m",{"key":28,"text":290,"correct":24},"灌木边缘与各地下管线边缘的间距均不小于0.50m",{"key":30,"text":292,"correct":24},"道路交叉路口、里弄出口及道路弯道处栽植树木应满足车辆的安全视距","BDE",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":308,"analysis":32},1255474,"桥管工程施工方案主要内容包括（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":24},"吊装前地上管节组对拼装方法",{"key":23,"text":301,"correct":24},"施工平面布置图及剖面图；管桥吊装施工方法的选择及相应的技术要求",{"key":26,"text":303,"correct":21},"管道（段）下沉测量控制方法",{"key":28,"text":305,"correct":24},"水上运输航线的确定，通航管理措施",{"key":30,"text":307,"correct":24},"施工场地临时供电、供水、通信等设计","ABDE",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":235,"analysis":32},1255475,"下列关于不开槽管道施工的说法中，表述正确的是（ ）。",[313,315,317,319,321],{"key":20,"text":314,"correct":24},"顶管宜采用工作坑壁的原土作后背",{"key":23,"text":316,"correct":21},"井深大于6m且有地下水时，不宜采用地下连续墙、沉井等支护方法",{"key":26,"text":318,"correct":24},"液压顶进设备液压油缸活塞退回时，油压不得过大，速度不得过快",{"key":28,"text":320,"correct":21},"中继间的设计最大顶力应超过管节承压面抗压能力的70%",{"key":30,"text":322,"correct":24},"触变泥浆灌注应从顶管的前端进行，待顶进数米后，再从后端及中间进行补浆",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":150,"analysis":32},1255476,"下列关于盾构法隧道施工的说法中，表述正确的是（ ）。",[327,329,331,333,335],{"key":20,"text":328,"correct":21},"盾构工作井的宽度一般比盾构直径小1.6～2.0m",{"key":23,"text":330,"correct":24},"盾构始发指盾构自始发工作井内盾构基座上开始推进到完成初始段掘进止",{"key":26,"text":332,"correct":24},"盾构机盾尾进入洞口后，拼装整环临时管片（负一环），并在开口部安装上部轴向支承，使随后盾构掘进时全部盾构千斤顶都可使用",{"key":28,"text":334,"correct":24},"盾构接收是指自掘进距接收工作井一定距离到盾构机落到接收工作井接收基座上止",{"key":30,"text":336,"correct":24},"盾构机推进结束后，应迅速拼装管片成环。管片拼装完成后，随着盾构的推进，管片与洞体之间出现空隙",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":62,"analysis":32},1255477,"下列关于钢管铺设施工的说法中，表述正确的是（ ）。",[341,343,345,347,349],{"key":20,"text":342,"correct":24},"钢管焊口经无损检测合格，并经强度试验合格后进行除锈、防腐和保温施工",{"key":23,"text":344,"correct":24},"直埋保温管道预警系统应按设计要求进行，安装过程中，首先连接预警线，并在每个接头安装完毕后进行预警线断路、短路检测",{"key":26,"text":346,"correct":21},"燃气管道一般采用填料型，其施工按照产品说明及规范要求进行",{"key":28,"text":348,"correct":24},"安全阀出口如果直接排入大气，则在出口处应加置凝液排放口",{"key":30,"text":350,"correct":21},"热水、给水管道一般采用通球法冲洗",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":365,"analysis":32},1255478,"市政管道工程包括的种类很多，下列选项中属于按其功能进行分类的有（ ）。",[355,357,359,361,363],{"key":20,"text":356,"correct":24},"给水",{"key":23,"text":358,"correct":24},"排水",{"key":26,"text":360,"correct":21},"中水",{"key":28,"text":362,"correct":21},"移动",{"key":30,"text":364,"correct":24},"电信","ABE",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":150,"analysis":32},1255479,"下列属于玻璃钢夹砂管道施工要求的是（ ）。",[370,372,374,376,378],{"key":20,"text":371,"correct":21},"管道连接就位后，应采用有效方法对管道进行定位，防止管道中心、高程发生位移变化",{"key":23,"text":373,"correct":24},"当沟槽深度和宽度达到设计要求后，在基础相对应的管道接口位置下挖下个长约50cm、深约20cm的接口工作坑",{"key":26,"text":375,"correct":24},"在承口内表面均匀涂上润滑剂，然后把两个“O”形橡胶圈分别套装在插口上",{"key":28,"text":377,"correct":24},"校核管道高程，使其达到设计要求，管道安装完毕",{"key":30,"text":379,"correct":24},"玻璃钢管与钢管、球墨铸铁管的连接：按照厂家提供的工艺执行",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":32},1255480,"常用的预制钢筋混凝土管道基础有（ ）。",[384,386,388,390,392],{"key":20,"text":385,"correct":24},"弧形素土基础",{"key":23,"text":387,"correct":24},"砂垫层基础",{"key":26,"text":389,"correct":24},"灰土基础",{"key":28,"text":391,"correct":21},"水泥垫层基础",{"key":30,"text":393,"correct":24},"混凝土基础","ABCE",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":32},1255481,"施工机具有的效性应对进场的机具进行检查，包括（ ）。",[399,401,403,405,407],{"key":20,"text":400,"correct":21},"机具的产品合格证",{"key":23,"text":402,"correct":24},"机具是否在有效期内",{"key":26,"text":404,"correct":24},"机具种类是否齐全",{"key":28,"text":406,"correct":24},"数量是否满足工期需要",{"key":30,"text":408,"correct":21},"机具的产品说明书",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":293,"analysis":32},1255482,"属于给水管道的附属构筑物有（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":21},"检查井",{"key":23,"text":416,"correct":24},"阀门井",{"key":26,"text":418,"correct":21},"溢流井",{"key":28,"text":420,"correct":24},"水表井",{"key":30,"text":422,"correct":24},"支墩",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":293,"analysis":32},1255483,"下列关于球墨铸铁管道铺设施工的说法中，表述正确的是（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":21},"接口工作坑每隔一个管口设一个，砂垫层检查合格后，机械开挖管道接口工作坑",{"key":23,"text":430,"correct":24},"管道沿曲线安装时，先把槽开宽，适合转角和安装",{"key":26,"text":432,"correct":21},"当采用截断的管节进行安装时，管端切口与管体纵向轴线平行",{"key":28,"text":434,"correct":24},"将管节吊起稍许，使插口对正承口装入，调整好接口间隙后固定管身，卸去吊具",{"key":30,"text":436,"correct":24},"螺栓上紧之后，用力矩扳手检验每个螺栓的扭矩",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":47,"analysis":32},1255484,"沉井结构的组成（ ）。",[441,443,445,447,449],{"key":20,"text":442,"correct":24},"井壁",{"key":23,"text":444,"correct":24},"刃脚",{"key":26,"text":446,"correct":24},"底梁",{"key":28,"text":448,"correct":24},"凹槽",{"key":30,"text":450,"correct":21},"井口",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":62,"analysis":32},1255485,"下列关于盖挖法的土方开挖施工的说法中，错误的是（ ）。",[455,457,459,461,463],{"key":20,"text":456,"correct":24},"开挖时机械开挖至每层板底设计标高，严禁超挖",{"key":23,"text":458,"correct":24},"侧墙、梁槽与基坑土方开挖分层开挖到位，基坑底严禁超挖，梁侧模避免超挖",{"key":26,"text":460,"correct":21},"开挖过程中，在钢管柱附近处，使用挖机挖掘要注意钢管柱两侧土体高差不要过大",{"key":28,"text":462,"correct":24},"边墙及中梁部位梁槽采用人工开挖",{"key":30,"text":464,"correct":21},"某一施工单元的土方工程结束后，具备施工条件，即可展开下道工序的施工",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":150,"analysis":32},1255487,"铺植草坪的方法有（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":21},"撒铺",{"key":23,"text":472,"correct":24},"密铺",{"key":26,"text":474,"correct":24},"间铺",{"key":28,"text":476,"correct":24},"点铺",{"key":30,"text":478,"correct":24},"茎铺",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":493,"analysis":32},1255488,"下列关于花境植物质量要求的说法中，表述正确的是（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":24},"宿根花卉根系发育良好，每丛3～4个芽，选用常绿或绿色期长的品种，无明显病虫害或机械损伤",{"key":23,"text":486,"correct":21},"根茎类多年花卉宜选用需每年挖掘地下部分做养护处理的种类，要求植株健壮、生长点多。",{"key":26,"text":488,"correct":21},"球根花卉的种球尽量大而饱满，种球无明显病害",{"key":28,"text":490,"correct":24},"矮生木本植物应选用株型丰满、无明显病虫害的观花或观叶植物。木本植物宜经移栽或盆栽",{"key":30,"text":492,"correct":24},"一、二年生花卉质量要求同花坛用花。","ADE",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":165,"analysis":32},1255489,"下列关于GCL垫质量控制要点的说法中，表述正确的是（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":24},"填埋区基底检验合格后方可进行GCL垫铺设作业，每一工作面施工前均要对基底进行修整和检验",{"key":23,"text":501,"correct":21},"对铺开的GCL垫进行调整，调整搭接宽度，控制在450±50mm范围内，拉平GCL垫，确保无褶皱、无悬空现象，与基础层贴实",{"key":26,"text":503,"correct":24},"掀开搭接处上层GCL垫，在搭接处均匀撒膨润土粉，将两层垫间密封然后将掀开的GCL垫铺回",{"key":28,"text":505,"correct":24},"根据填埋区基底设计坡向，GCL垫的搭接，尽量采用顺坡搭接，即采用上压下的搭接方式；注意避免出现十字搭接，而尽量采用品形分布",{"key":30,"text":507,"correct":24},"GCL垫需当日铺设当日覆盖，遇有雨雪天气停止施工，并将已铺设的GCL垫覆盖好",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":32},1255490,"下列关于沉井施工方法的说法中，正确的是（ ）。",[512,514,516,518,520],{"key":20,"text":513,"correct":21},"挖土层应一次性进行；对于有底梁或支撑梁沉井，其相邻阁仓高差不宜超过0.5m",{"key":23,"text":515,"correct":24},"机械设备的配备应满足沉井下沉以及水中开挖、出土等要求，运行正常；废弃土方、泥浆专门处置，不得随意排放",{"key":26,"text":517,"correct":24},"下沉应平稳、均衡、缓慢，发生偏斜应通过调整开挖顺序和方式“随叫随到、动中纠偏”",{"key":28,"text":519,"correct":24},"干封底保持施工水平稳定地下水位距坑底不小于0.5m；在沉井封底前应用大石块将刃脚下垫实",{"key":30,"text":521,"correct":21},"水下混凝土封底的浇筑顺序，应从低处开始，逐渐向中心缩小",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":180,"analysis":32},1255491,"下列关于树木栽植的说法中，表述正确的是（ ）。",[526,528,530,532,534],{"key":20,"text":527,"correct":24},"挖种植穴、槽应垂直下挖，穴槽壁要平滑，上下口径大小要一致，以免树木根系不能舒展或填土不实",{"key":23,"text":529,"correct":21},"对行道树的修剪还应注意分枝点，应保持在2.5m以上，相邻的分枝点要间隔较远",{"key":26,"text":531,"correct":24},"乔木地上部分修剪：对干性强又必须保留中干优势的树种，采用削枝保干的修剪法",{"key":28,"text":533,"correct":24},"在秋季挖掘落叶树木时，必须摘掉尚未脱落的树叶，但不得伤害幼芽",{"key":30,"text":535,"correct":21},"肥基层以上应做成环形拦水围堰，高50mm以上",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":62,"analysis":32},1255492,"下列关于泥质防水层实际做法说法中，表述正确的是（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":24},"选好土源，检测土壤成分，通过做不同掺量的土样，优选最佳配比",{"key":23,"text":543,"correct":24},"做好现场拌合工作，严格控制含水率，保证压实度",{"key":26,"text":545,"correct":21},"膨润土含量越高抗渗性能越好，尽可能大产量使用膨润土",{"key":28,"text":547,"correct":24},"分层施工同步检验，严格执行验收标准，不符合要求的坚决返工",{"key":30,"text":549,"correct":21},"采用材料招标的方法确定膨润土供货商即可进场",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":62,"analysis":32},1255493,"顶管法工作坑根据不同功能可分为（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":24},"转向坑",{"key":23,"text":557,"correct":24},"交汇坑",{"key":26,"text":559,"correct":21},"垂直坑",{"key":28,"text":561,"correct":24},"接收坑",{"key":30,"text":563,"correct":21},"水平坑",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":62,"analysis":32},1255494,"下列关于水泥粉煤灰碎石桩的说法中，表述正确的是（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":24},"桩机就位，调整钻杆与地面垂直，偏差不大于1.0%",{"key":23,"text":571,"correct":24},"质量检验主要分为复合地基承载力和装机完整性，一般在成桩28d后进行",{"key":26,"text":573,"correct":21},"一般采用长螺旋钻机干成孔。桩顶高程一般高出设计高程80cm",{"key":28,"text":575,"correct":24},"一般采用长螺旋钻机干成孔",{"key":30,"text":577,"correct":21},"试验数量宜为总桩数的0.5%，且没检验批不少于2根",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":235,"analysis":32},1255495,"下列选项中，属于城市热力管网的主要附件的有（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":24},"补偿器",{"key":23,"text":585,"correct":21},"排水器",{"key":26,"text":587,"correct":24},"支吊架",{"key":28,"text":589,"correct":21},"放气口",{"key":30,"text":591,"correct":24},"阀门",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":606,"analysis":32},1255496,"城市热力管道通常采用的材料有（ ）。",[596,598,600,602,604],{"key":20,"text":597,"correct":24},"无缝钢管",{"key":23,"text":599,"correct":21},"聚乙烯管",{"key":26,"text":601,"correct":24},"钢板卷焊管",{"key":28,"text":603,"correct":21},"混凝土管",{"key":30,"text":605,"correct":21},"焊接钢管","AC",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":165,"analysis":32},1255497,"沉管工程施工方案主要内容包括（ ）。",[611,613,615,617,619],{"key":20,"text":612,"correct":24},"施工平面布置图及剖面图",{"key":23,"text":614,"correct":21},"施工总平面布置图",{"key":26,"text":616,"correct":24},"沉管施工方法的选择及相应的技术要求",{"key":28,"text":618,"correct":24},"沉管施工各阶段的管道浮力计算，并根据施工方法进行施工各阶段的管道强度、刚度、稳定性验算",{"key":30,"text":305,"correct":24},{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":47,"analysis":32},1255498,"支撑形式应根据（ ）因素确定。",[624,626,628,630,632],{"key":20,"text":625,"correct":24},"沟槽的土质",{"key":23,"text":627,"correct":24},"地下水位",{"key":26,"text":629,"correct":24},"开槽断面",{"key":28,"text":631,"correct":24},"荷载条件",{"key":30,"text":633,"correct":21},"沟槽位置",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":493,"analysis":32},1255499,"市政工程排水管道的附属构筑物包括（ ）。",[638,639,640,641,643],{"key":20,"text":414,"correct":24},{"key":23,"text":416,"correct":21},{"key":26,"text":422,"correct":21},{"key":28,"text":642,"correct":24},"雨水口",{"key":30,"text":644,"correct":24},"出水口",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":659,"analysis":32},1255500,"顶管施工具有（ ）等优点。",[649,651,653,655,657],{"key":20,"text":650,"correct":21},"影响交通",{"key":23,"text":652,"correct":21},"土方开挖量大",{"key":26,"text":654,"correct":24},"不影响交通",{"key":28,"text":656,"correct":24},"土方开挖量小",{"key":30,"text":658,"correct":24},"不受冬雨季的影响","CDE",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":674,"analysis":32},1255501,"下列关于暗挖主要分项工程施工的说法中，表述错误的是（ ）。",[664,666,668,670,672],{"key":20,"text":665,"correct":24},"钢拱架宜选用钢筋、型钢、钢轨等制成，采用钢筋加工而成格栅的主筋直径不宜小于12mm，其间采用受力较好、冷压成型“八”字或“8”字加强筋",{"key":23,"text":667,"correct":24},"钢架应与喷射混凝土形成一体，钢架与围岩间的间隙必须用喷射混凝土充填密实，钢架应全部被喷射混凝土覆盖，保护层厚度不得小于10mm",{"key":26,"text":669,"correct":21},"复合式衬砌防水施工应优先选用射钉铺设",{"key":28,"text":671,"correct":21},"衬砌施工缝和沉降缝的止水带不得有割伤、破裂，固定应牢固，防止偏移，提高止水带部位混凝土浇筑的质量",{"key":30,"text":673,"correct":21},"二衬采用补偿收缩混凝土，具有良好的抗裂性能","AB",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":689,"analysis":32},1255502,"地铁车站等构筑物的长条形基坑在开挖过程中要考虑纵向放坡的原因是（ ）。",[679,681,683,685,687],{"key":20,"text":680,"correct":21},"施工简便，经济性好",{"key":23,"text":682,"correct":21},"对环境影响小",{"key":26,"text":684,"correct":24},"保证开挖安全防止滑坡",{"key":28,"text":686,"correct":21},"对施工工艺要求低",{"key":30,"text":688,"correct":24},"保证出土运输方便","CE",{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":165,"analysis":32},1255503,"沟槽开挖施工中常采用的沟槽断面形式有（ ）。",[694,696,698,700,702],{"key":20,"text":695,"correct":24},"直槽",{"key":23,"text":697,"correct":21},"V形槽",{"key":26,"text":699,"correct":24},"梯形槽",{"key":28,"text":701,"correct":24},"混合槽",{"key":30,"text":703,"correct":24},"联合槽",{"id":705,"libraryId":5,"type":15,"typeLabel":16,"stem":706,"options":707,"answer":264,"analysis":32},1255504,"下列属于针叶常绿乔木大树规格的是（ ）。",[708,710,712,714,716],{"key":20,"text":709,"correct":21},"胸径在20cm以上",{"key":23,"text":711,"correct":21},"胸径在40cm以上",{"key":26,"text":713,"correct":24},"株高在6m以上",{"key":28,"text":715,"correct":24},"地径在18cm以上",{"key":30,"text":717,"correct":21},"株高在12m以上",{"id":719,"libraryId":5,"type":15,"typeLabel":16,"stem":720,"options":721,"answer":394,"analysis":32},1255505,"下列关于注浆工艺选择正确的是（ ）。",[722,724,726,728,730],{"key":20,"text":723,"correct":24},"在砂卵石地层中宜采用渗入注浆法",{"key":23,"text":725,"correct":24},"在砂层中宜采用渗透注浆法",{"key":26,"text":727,"correct":24},"在黏土层中宜采用劈裂注浆法",{"key":28,"text":729,"correct":21},"在淤泥质软土层中宜采用电动硅化注浆法",{"key":30,"text":731,"correct":24},"在淤泥质软土层中宜采用高压喷射注浆法",[733,737,740,743,746,749],{"id":734,"name":735,"category":7,"favorite":736},1,"领导干部任职前廉政法规知识测试题",92,{"id":738,"name":739,"category":7,"favorite":734},595,"建筑结构与设备",{"id":741,"name":742,"category":7,"favorite":734},715,"招标采购专业知识与法律法规",{"id":744,"name":745,"category":7,"favorite":734},848,"市政方向-通用基础",{"id":747,"name":748,"category":7,"favorite":8},534,"BIM工程师",{"id":750,"name":748,"category":7,"favorite":8},535]