[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-839-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},839,"(市政施工)基础知识","建筑工程",0,13,50,1169,[13,38,53,68,83,98,113,128,143,158,173,187,202,216,230,245,260,275,289,303,318,332,347,361,376,390,404,418,432,446,460,474,487,502,516,530,544,557,571,584,598,611,625,639,653,663,678,690,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1255398,2,"多选题","我国按沥青混凝土中矿料的最大粒径分为（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","粗粒式沥青混凝土",true,{"key":24,"text":25,"correct":26},"B","瓜子片沥青混凝土",false,{"key":28,"text":29,"correct":22},"C","细粒式沥青混凝土",{"key":31,"text":32,"correct":22},"D","中粒式沥青混凝土",{"key":34,"text":35,"correct":26},"E","普通式沥青混凝土","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1255399,"下列堆载预压法施工要点说法正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"袋装砂井和塑料排水带施工所用钢管内径略小于两者尺寸",{"key":24,"text":45,"correct":26},"砂袋会塑料排水带应高出砂垫层不少于80mm",{"key":28,"text":47,"correct":26},"预压区中心部位的砂垫层底标高应低于周边的砂垫层底标高，以利于排水",{"key":31,"text":49,"correct":22},"堆载预压施工，应根据设计要求分级逐渐加载",{"key":34,"text":51,"correct":22},"竖向变形量每天不宜超过10～15mm，水平位移每天不宜超过4～7mm","DE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1255400,"下列关于碎（砂）石桩法的各项中，正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"当用于消除粉细砂及粉土液化时，宜采用锤击沉管成桩法。",{"key":24,"text":60,"correct":26},"砂桩可采用沉管法，填料粒径不宜大于10mm",{"key":28,"text":62,"correct":22},"施工前应进行成桩工艺试验，试桩数量不应少于2根",{"key":31,"text":64,"correct":22},"黏性土地基宜从中间向外围或间隔跳打进行",{"key":34,"text":66,"correct":22},"碎（砂）石桩施工后，应将基底标高下的松散层挖除或碾压密实，并在其上铺设一层300～500mm厚的碎石垫层","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1255401,"城镇道路横断面反映出道路建设有关的地面和地下共用设施布置的情况，包括（ ）等。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"道路总宽度",{"key":24,"text":75,"correct":26},"道路总长度",{"key":28,"text":77,"correct":22},"红线宽度",{"key":31,"text":79,"correct":22},"污水管管径",{"key":34,"text":81,"correct":22},"雨水管管径","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1255402,"城市道路中的挡土墙常用的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"钢筋混凝土悬壁式",{"key":24,"text":90,"correct":22},"钢筋混凝土扶壁式",{"key":28,"text":92,"correct":22},"混凝土重力式",{"key":31,"text":94,"correct":22},"石砌重力式",{"key":34,"text":96,"correct":26},"拉杆式","ABCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1255403,"混凝土路面板施工程序因摊铺机具而异，我国目前采用的摊铺机具与摊铺方式包括（ ）和手工摊铺等。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"滑模摊铺",{"key":24,"text":105,"correct":22},"碾压摊铺",{"key":28,"text":107,"correct":26},"爬模摊铺",{"key":31,"text":109,"correct":22},"轨道摊铺",{"key":34,"text":111,"correct":22},"三辊轴摊铺","ABDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1255404,"按桩的承载能力不同，桩可分为（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"混凝土桩",{"key":24,"text":120,"correct":26},"钢管桩",{"key":28,"text":122,"correct":22},"摩擦桩",{"key":31,"text":124,"correct":22},"端承桩",{"key":34,"text":126,"correct":26},"预制沉入桩","CD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1255405,"根据人行道按使用材料不同，可分为（ ）等。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"基础铺设",{"key":24,"text":135,"correct":22},"沥青面层人行道",{"key":28,"text":137,"correct":22},"水泥混凝土人行道",{"key":31,"text":139,"correct":26},"填缝养生",{"key":34,"text":141,"correct":22},"预制块人行道","BCE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},1255406,"某公司中标修建城市新建道路工程，全长2.5km,双向六车道，其结构从下至上为20cm厚12%石灰土底基层，38cm后水泥稳定碎石基层，8cm后粗粒式沥青混合料底面层，6cm厚中粒式沥青混合料中面层，4cm厚细粒式沥青混合料表面层。 下列属于半刚性基层的有（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":26},"级配碎石",{"key":24,"text":150,"correct":22},"石灰稳定土",{"key":28,"text":152,"correct":22},"水泥稳定碎石",{"key":31,"text":154,"correct":22},"石灰粉煤灰稳定土",{"key":34,"text":156,"correct":26},"级配砂砾","BCD",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},1255407,"下列关于强夯法施工要点中，正确的是（ ）。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"降水联合低能级强夯法处理地基时必须设置合理的降排水体系，包括降水系统和排水系统",{"key":24,"text":165,"correct":22},"低能级强夯应采用“少击多遍，先轻后重”的原则进行施工，施工时据临近建筑物由近向远夯击",{"key":28,"text":167,"correct":26},"当地下水位距地表3m以下且表层为非饱和土时，可直接进行夯击",{"key":31,"text":169,"correct":26},"抽真空设备一套设备有效控制面积一般为600～800m㎡",{"key":34,"text":171,"correct":22},"强夯振动的安全距离一般为10～15m，强夯置换施工按由内向外、隔行跳打的原则完成全部夯点得施工","ABE",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":97,"analysis":37},1255408,"城市道路附属构筑物一般包括（ ）、涵洞、护底、排水沟及挡土墙等。",[177,179,181,183,185],{"key":20,"text":178,"correct":22},"路缘石",{"key":24,"text":180,"correct":22},"人行道",{"key":28,"text":182,"correct":22},"雨水口",{"key":31,"text":184,"correct":22},"护坡",{"key":34,"text":186,"correct":26},"路基",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},1255409,"城市道路路面是层状体系，一般根据使用要求、受力情况和自然因素等作用程度不同，把整个路面结构自上而下分成（ ）三个结构层。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"面层",{"key":24,"text":194,"correct":22},"基层",{"key":28,"text":196,"correct":22},"垫层",{"key":31,"text":198,"correct":26},"底层",{"key":34,"text":200,"correct":26},"封层","ABC",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":172,"analysis":37},1255410,"水泥混凝土面层表面应（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"平整",{"key":24,"text":209,"correct":22},"抗滑",{"key":28,"text":211,"correct":26},"坚实",{"key":31,"text":213,"correct":26},"紧密",{"key":34,"text":215,"correct":22},"耐磨",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":67,"analysis":37},1255411,"下列关于轻型井点管施工表述正确的是（ ）",[220,222,224,226,228],{"key":20,"text":221,"correct":26},"轻型井点管的安装应居中，并保持水平",{"key":24,"text":223,"correct":26},"轻型井点降水应使地下水水位降至沟槽底面位置",{"key":28,"text":225,"correct":22},"轻型井点的集水总管底面及抽水设备的高程宜尽量降低",{"key":31,"text":227,"correct":22},"在施工排水过程中不得间断排水，并应对排水系统经常检查和维护",{"key":34,"text":229,"correct":22},"冬期施工时，排水系统的管路应采取防冻措施",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1255412,"下列关于砂石铺筑垫层施工说法错误的是（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"砂石铺筑分层、分段进行，每层厚度，一般为15～20cm，最大不超过50cm",{"key":24,"text":237,"correct":26},"分段施工时，接搓处应做成斜坡，每层接搓处的水平距离应错开0.5～1.0m，并应充分压（夯）实",{"key":28,"text":239,"correct":22},"采用压路机往复碾压，一般碾压不少于2遍，其轮距搭接不少于50cm",{"key":31,"text":241,"correct":26},"边缘和转角处应用人工或蛙式打夯机补夯密实",{"key":34,"text":243,"correct":26},"石灰稳定粒料类垫层与水泥稳定粒料类垫层都适用于城市道路温度和湿度状况不良的环境下","AC",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},1255413,"下列关于高压喷射注浆法的各项中，正确的是（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"施工前进行试桩，确定施工工艺和技术参数，作为施工控制依据，试桩数量不应少于2根",{"key":24,"text":252,"correct":26},"水泥浆液的水胶比按要求确定，可取0.3～1.5，常用为1.0",{"key":28,"text":254,"correct":26},"注浆管分段提升的搭接长度一般大于50mm",{"key":31,"text":256,"correct":22},"钻机与高压泵的距离不宜大于50m",{"key":34,"text":258,"correct":22},"高压喷射注浆完毕，可在原孔位采用冒浆回灌或第二次注浆等措施","ADE",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":274,"analysis":37},1255414,"下列关于属于热拌沥青混合料面层施工前准备的是（ ）。",[264,266,268,270,272],{"key":20,"text":265,"correct":22},"施工前应对各种材料调查试验，经选择确定的材料在施工过程中应保持稳定，不得随意变更",{"key":24,"text":267,"correct":22},"做好配合比设计报送有关方面审批，对各种原材料进行符合性检验",{"key":28,"text":269,"correct":22},"施工前对各种施工机具应作全面检查，应经调试并使其处于良好的性能状态",{"key":31,"text":271,"correct":26},"城市快速路、主干路宜采用两台以上摊铺机联合摊铺",{"key":34,"text":273,"correct":22},"铺筑沥青层前，应检查基层或下卧沥青层的质量，不符要求的不得铺筑沥青混合料","ABCE",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":259,"analysis":37},1255415,"下列关于注浆法施工的各项中，正确的是（ ）。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"塑料阀管注浆芯管每次上拔高度应与阀管开口距离一致，宜为330mm",{"key":24,"text":282,"correct":26},"劈裂注浆时浆液流量不宜过大，宜取10～40L\u002Fmin",{"key":28,"text":284,"correct":26},"压密注浆采用水泥砂浆时，坍落度25mm～80mm，注浆压力一般为1.0～5.0MPa",{"key":31,"text":286,"correct":22},"浆液可用磨细粉煤灰部分代替水泥，掺入量宜为水泥重量的20%～70%",{"key":34,"text":288,"correct":22},"注浆工程检验一般在注浆结束28d后进行",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":97,"analysis":37},1255416,"按面层使用材料的不同进行分类，城市道路可分为（ ）道路。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"天然石材",{"key":24,"text":296,"correct":22},"沥青碎石",{"key":28,"text":298,"correct":22},"沥青混凝土",{"key":31,"text":300,"correct":22},"水泥混凝土",{"key":34,"text":302,"correct":26},"钢筋混凝土",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},1255417,"下列关于说法中，表述正确的是（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"挖土机沿挖方边缘移动时，机械距离边坡上缘的宽度不得小于沟槽或管沟的深度",{"key":24,"text":310,"correct":22},"深度大于1.5m时，根据土质变化情况，应做好沟槽的支撑准备，以防塌陷",{"key":28,"text":312,"correct":22},"在开挖槽边弃土时，应保证边坡和直立帮得稳定",{"key":31,"text":314,"correct":22},"暴露的溶洞，应用浆砌片石或混凝土填满堵满",{"key":34,"text":316,"correct":22},"淤泥、淤泥质土和垃圾土按要求进行挖除，清理干净，回填砂砾材料或碎石，分层整平夯实到基底标高","BCDE",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":97,"analysis":37},1255418,"水泥混凝土面层暴露在大气中，直接承受行车荷载的作用和环境因素的影响，应具有足够的（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"弯拉强度",{"key":24,"text":325,"correct":22},"疲劳强度",{"key":28,"text":327,"correct":22},"抗压强度",{"key":31,"text":329,"correct":22},"耐久性",{"key":34,"text":331,"correct":26},"经济性",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":346,"analysis":37},1255419,"下列关于水泥稳定土和级配砂砾基层施工的说法中，表述正确的是（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"应用摊铺机进行，摊铺应均匀，松铺系数一般取1.3～1.5",{"key":24,"text":339,"correct":22},"摊铺混合料不宜中断，如因故较长时间中断，应设置横向接缝",{"key":28,"text":341,"correct":26},"城镇快速路和主干路的基层宜采用单台摊铺机整幅摊铺、碾压，步距5～8m",{"key":31,"text":343,"correct":22},"压路机的碾压速度，初压以1.5～1.7km\u002Fh为宜，复压、中压以2.0～2.5km\u002Fh为宜",{"key":34,"text":345,"correct":26},"两轮压路机每次重叠1\u002F2轮宽，三轮压路机每次重叠轮宽度的1\u002F3","ABD",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":346,"analysis":37},1255420,"下列关于石灰粉煤灰稳定砂砾基层施工的说法中，表述正确的是（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"运输中一般采用有覆盖装置的车辆，做好防止水分蒸发和防扬尘措施",{"key":24,"text":354,"correct":22},"推土机按照虚铺厚度、控制高程点进行摊平料堆，人工拉线配合找平",{"key":28,"text":356,"correct":26},"应采用摊铺机进行下基层作业，以取得较好的平整度",{"key":31,"text":358,"correct":22},"碾压时应采用先轻型后重型压路机组合",{"key":34,"text":360,"correct":26},"混合料的养护采用湿养，始终保持表面潮湿，养护期为28d",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":375,"analysis":37},1255422,"为了减小由于胀缩和翘曲变形所引起的应力，或者由于施工的需要，水泥混凝土面层需要设置（ ）、和等各种形式的接缝。",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"胀缝",{"key":24,"text":368,"correct":26},"沉降缝",{"key":28,"text":370,"correct":22},"缩缝",{"key":31,"text":372,"correct":26},"裂缝",{"key":34,"text":374,"correct":22},"施工缝","ACE",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":346,"analysis":37},1255423,"等级较高的城镇道路线路的平面线形由（ ）组成。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"直线",{"key":24,"text":383,"correct":22},"圆曲线",{"key":28,"text":385,"correct":26},"双曲线",{"key":31,"text":387,"correct":22},"缓和曲线",{"key":34,"text":389,"correct":26},"过渡曲线",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":172,"analysis":37},1255424,"路基施工前准备工作包括（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"组织准备",{"key":24,"text":397,"correct":22},"物质准备",{"key":28,"text":399,"correct":26},"设计准备",{"key":31,"text":401,"correct":26},"思想准备",{"key":34,"text":403,"correct":22},"技术准备",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":259,"analysis":37},1255425,"土方路基施工中，路基压实应（ ）。",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"先轻后重",{"key":24,"text":411,"correct":26},"先重后轻",{"key":28,"text":413,"correct":26},"先快后慢",{"key":31,"text":415,"correct":22},"先慢后快",{"key":34,"text":417,"correct":22},"均匀一致",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":172,"analysis":37},1255427,"目前基层常用的材料有（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"石灰稳定土类",{"key":24,"text":425,"correct":22},"水泥稳定土类",{"key":28,"text":427,"correct":26},"沥青稳定碎石类",{"key":31,"text":429,"correct":26},"级配稳定碎石类",{"key":34,"text":431,"correct":22},"二灰结石",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":346,"analysis":37},1255428,"下列换填法施工要点正确的是（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"不得直接使用泥炭、淤泥、淤泥质土和有机质土进行换填",{"key":24,"text":439,"correct":22},"分段施工时，不得在基础、墙角下接缝",{"key":28,"text":441,"correct":26},"高炉干渣垫层大面积施工宜采用平碾、振动碾或羊足碾分层碾压，每层松铺厚度宜不大于350mm",{"key":31,"text":443,"correct":22},"压实度一般采用环刀法、灌砂法等方法检验",{"key":34,"text":445,"correct":26},"对砂石、高炉干渣等的压实度试验一般采用环刀法、灌砂法",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":82,"analysis":37},1255429,"城镇道路横断面综合布置的原则包括（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":22},"保证交通的安全与畅通",{"key":24,"text":453,"correct":26},"保证污水的排除",{"key":28,"text":455,"correct":22},"注意节省建设投资，节约城市用地",{"key":31,"text":457,"correct":22},"与沿线各类建筑和公用设施的布置协调一致",{"key":34,"text":459,"correct":22},"避免相互干扰沿线的地下、地上管线，各种构筑物以及人防工程等",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":82,"analysis":37},1255430,"城镇道路平面设计必须遵循保证行车（ ）的线形设计的总原则。",[464,466,468,470,472],{"key":20,"text":465,"correct":22},"安全",{"key":24,"text":467,"correct":26},"可靠",{"key":28,"text":469,"correct":22},"迅速",{"key":31,"text":471,"correct":22},"经济",{"key":34,"text":473,"correct":22},"舒适",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":82,"analysis":37},1255431,"目前水泥混凝土路面包括素混凝土、（ ）、钢纤维混凝土和预制混凝土板等七类。",[478,479,481,483,485],{"key":20,"text":302,"correct":22},{"key":24,"text":480,"correct":26},"预制空心板",{"key":28,"text":482,"correct":22},"连续配筋混凝土",{"key":31,"text":484,"correct":22},"装配式混凝土",{"key":34,"text":486,"correct":22},"预应力混凝土",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":501,"analysis":37},1255432,"下列关于人工挖孔灌注桩的说法中，表述正确的是（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":26},"挖掘顺序应为相邻的孔同时开挖",{"key":24,"text":494,"correct":22},"开挖时一般组织连续作业应采用电动链滑车或架设三脚架，用10～20kN慢速卷扬机提升",{"key":28,"text":496,"correct":26},"桩孔挖掘、支撑护壁必须间隔作业，不得连续",{"key":31,"text":498,"correct":22},"在季节融化层融化的夏季，一般不宜采用挖孔桩",{"key":34,"text":500,"correct":22},"井口周围需用木料、型钢或混凝土制成框架或围圈予以保护，井口围护应高于地面20～30cm，以防止图、石、杂物滚入孔内伤人","BDE",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":36,"analysis":37},1255433,"下列关于土钉支护基坑施工的说法中，表述正确的是（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"一般采用施工机械，根据分层厚度和作业顺序开挖，一般每层开挖深度控制在100～150mm",{"key":24,"text":509,"correct":26},"土钉全长设施金属或塑料定位支架，间距5m，保证钢筋处于钻孔的中心部位",{"key":28,"text":511,"correct":22},"喷射混凝土粗骨料最大粒径不宜大于12mm，水胶比不宜大于0.45，并掺加速凝剂",{"key":31,"text":513,"correct":22},"喷射混凝土终凝后2小时，应根据当地条件采取连续喷水养护5～7d或喷涂养护剂",{"key":34,"text":515,"correct":26},"冬期进行喷射混凝土，作业温度不得低于0℃，混合料进入喷射机的温度和水温不得低于0℃；在结冰的面层上不得喷射混凝土",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":97,"analysis":37},1255434,"路堑土质路基开挖中纵挖法分为（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"分层纵挖法",{"key":24,"text":523,"correct":22},"通道纵挖",{"key":28,"text":525,"correct":22},"混合式开挖法",{"key":31,"text":527,"correct":22},"分段纵挖法",{"key":34,"text":529,"correct":26},"整体纵挖法",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":36,"analysis":37},1255435,"下列关于刚性扩大基础施工要点的说法中，表述正确的是（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"基础砌筑前要清理地基，不得留有浮泥等杂物",{"key":24,"text":537,"correct":26},"开始砌筑时，第一层块石应先坐浆，先砌中间部分再砌四周石部分",{"key":28,"text":539,"correct":22},"面石砌筑时，上下二层的石块要错缝，同一层面石要按一顺一丁或一丁二顺砌筑",{"key":31,"text":541,"correct":22},"混凝土基础施工前一般应先在基坑底部先铺筑一层混凝土垫层，以保护地基",{"key":34,"text":543,"correct":26},"混凝土自高处倾落时，其自由倾落高度不宜超过5m",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":201,"analysis":37},1255436,"为了保证路面的使用年限，路面应具有充分的（ ）；为了保证行车舒适安全，路面还必须具有较高的平整度和抗滑性。",[548,550,552,553,555],{"key":20,"text":549,"correct":22},"强度",{"key":24,"text":551,"correct":22},"稳定性",{"key":28,"text":329,"correct":22},{"key":31,"text":554,"correct":26},"美观性",{"key":34,"text":556,"correct":26},"压实度",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":112,"analysis":37},1255437,"柔性路面主要包括各种基层（水泥混凝土除外）、（ ）面层所组成的路面结构。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"各类沥青",{"key":24,"text":564,"correct":22},"碎石",{"key":28,"text":566,"correct":26},"块石",{"key":31,"text":568,"correct":22},"砾石",{"key":34,"text":570,"correct":22},"块料",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":375,"analysis":37},1255438,"下列关于真空预压法施工要点中，正确的是（ ）。",[575,577,579,581,582],{"key":20,"text":576,"correct":22},"水平向分部滤水管可采用条状、梳齿状、羽字状或目字状等形式，滤水管布置宜形成回路",{"key":24,"text":578,"correct":26},"铺膜应选择在无风无雨的天气分次抽完，当连续5d测沉降速率不大于2mm\u002Fd，或取得数据满足工程要求时，可停止抽真空",{"key":28,"text":580,"correct":22},"密封膜采用抗老化性能好、韧性好、抗刺穿能力强的塑料薄膜",{"key":31,"text":169,"correct":26},{"key":34,"text":583,"correct":22},"对沉降要求控制严格、地基承载力和稳定性要求较高的工程，或为加快预压进度，可采用超载预压法加固",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":67,"analysis":37},1255439,"下列关于水泥粉煤灰碎石桩的说法中，表述正确的是（ ）",[588,590,592,594,596],{"key":20,"text":589,"correct":26},"在浅水区埋设护筒时，应采用机械振动或加压等方式，并与钻机平台的基桩临时固定，防止移位",{"key":24,"text":591,"correct":26},"泥浆护壁黏土自然风干后手握成团，落地开花",{"key":28,"text":593,"correct":22},"正循环回转钻孔其特点是钻进与排渣同时连续进行，在适用的土层中钻进速度较快，但施工占地较多，且机具设备较复杂",{"key":31,"text":595,"correct":22},"分段钢筋笼安装时，应在孔口设操作平台，将分段钢筋笼进行连接，连接方式可采用机械连接或焊接",{"key":34,"text":597,"correct":22},"水下混凝土初凝时间不宜小于2.5小时，水泥强度等级不宜低于42.5级",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":112,"analysis":37},1255440,"目前可用于水泥混凝土路面基层类型主要有（ ）。",[602,604,606,607,609],{"key":20,"text":603,"correct":22},"碎石、砾石",{"key":24,"text":605,"correct":22},"无机结合料",{"key":28,"text":480,"correct":26},{"key":31,"text":608,"correct":22},"沥青稳定碎石",{"key":34,"text":610,"correct":22},"素混凝土和碾压混凝土",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":317,"analysis":37},1255441,"下列关于无支护基坑放坡的说法中，表述正确的是（ ）。",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"深度在5m以内时，当具有天然湿度，构造均匀，水文地质条件好且无地下水，不加支撑的沟槽，可以不放坡",{"key":24,"text":618,"correct":22},"当土质变差时，应按实际情况加大边坡",{"key":28,"text":620,"correct":22},"基坑深度大于5m时，坑壁坡度适当放缓，或加做平台",{"key":31,"text":622,"correct":22},"当基坑开挖经过不同类别的土层或深度超过10m时，坑壁边坡可按各层土质采用不同坡度",{"key":34,"text":624,"correct":22},"基坑开挖因临近建筑物限制，应采用边坡支护措施",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":346,"analysis":37},1255442,"下列关于深层搅拌法的说法中，表述正确的是（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"固化剂宜选用强度等级为42.5级及以上的水泥。",{"key":24,"text":632,"correct":22},"单、双轴深层搅拌水泥掺量可取13%～15%",{"key":28,"text":634,"correct":26},"三轴深层搅拌桩水泥掺量可取18%～20%",{"key":31,"text":636,"correct":22},"水泥浆水胶比应保证施工时的可喷性，宜取0.45～0.70",{"key":34,"text":638,"correct":26},"施工流程为：搅拌机械就位→预搅下沉→搅拌提升→关闭搅拌机械",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":82,"analysis":37},1255443,"填土采用同类土分层进行，一般方法有（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"人工填土",{"key":24,"text":646,"correct":26},"混凝土车填土",{"key":28,"text":648,"correct":22},"推土机填土",{"key":31,"text":650,"correct":22},"铲运机铺填土",{"key":34,"text":652,"correct":22},"自卸汽车填土",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":36,"analysis":37},1255444,"按结构层次分类，城镇道路的组成有（ ）。",[657,658,659,660,661],{"key":20,"text":186,"correct":22},{"key":24,"text":196,"correct":26},{"key":28,"text":194,"correct":22},{"key":31,"text":192,"correct":22},{"key":34,"text":662,"correct":26},"保护层",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":677,"analysis":37},1255445,"修筑道路垫层所用材料，强度要求不高，但（ ）要好。",[667,669,671,673,675],{"key":20,"text":668,"correct":26},"耐磨性",{"key":24,"text":670,"correct":22},"水稳性",{"key":28,"text":672,"correct":26},"隔水性",{"key":31,"text":674,"correct":22},"隔热性",{"key":34,"text":676,"correct":26},"刚度","BD",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":36,"analysis":37},1255446,"路缘石的施工一般以预制安砌为主，施工程序包括测量放样、（ ）、（ ）和（ ）。",[682,683,685,687,688],{"key":20,"text":133,"correct":22},{"key":24,"text":684,"correct":26},"土方开挖",{"key":28,"text":686,"correct":22},"排列安砌",{"key":31,"text":139,"correct":22},{"key":34,"text":689,"correct":26},"土方回填",{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":82,"analysis":37},1255447,"城市道路排水设施有（ ）。",[694,695,697,699,701],{"key":20,"text":182,"correct":22},{"key":24,"text":696,"correct":26},"污水口",{"key":28,"text":698,"correct":22},"进水口",{"key":31,"text":700,"correct":22},"支管",{"key":34,"text":702,"correct":22},"检查井",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":36,"analysis":37},1255450,"板式橡胶支座包括（ ）。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"滑板式支座",{"key":24,"text":710,"correct":26},"螺旋锚固板式橡胶支座",{"key":28,"text":712,"correct":22},"四氟板支座",{"key":31,"text":714,"correct":22},"坡型板式橡胶支座",{"key":34,"text":716,"correct":26},"球形板支座",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":375,"analysis":37},1255451,"下列关于桥面系施工的说法中，表述正确的是（ ）。",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"基面应坚实平整粗糙，不得有尖硬接茬、空鼓、开裂、起砂和脱皮等缺陷",{"key":24,"text":724,"correct":26},"基层混凝土强度应达到设计强度并符合设计要求，含水率不得大于15%",{"key":28,"text":726,"correct":22},"桥面涂层防水施工采用涂刷发、刮涂法或喷涂法施工",{"key":31,"text":728,"correct":26},"涂刷应现进行大面积涂刷，后做转角处、变形缝部位",{"key":34,"text":730,"correct":22},"切缝过程中，要保护好切缝外侧沥青混凝土边角，防止污染破损",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]