[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255919":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1255919,839,3,"判断题","施工定额是指在正常合理的施工条件下，规定完成一定计量单位的分项工程或结构构件所必需的人工（工日）、材料、机械（台班）以及货币形式表现的消耗数量标准。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"施工定额是以“施工技术验收规范”及“安全操作规程”为依据，在一定的施工技术和施工组织的条件下，规定建筑安装工人或班组消耗在单位合格建筑安装产品（包括预制件及假定产品）上的人工、材料和机械台班数量标准。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)基础知识","建筑工程",0]