[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255754":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1255754,839,3,"判断题","预制沉入桩打桩顺序在密集群桩由一端向另一端打。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"打桩顺序：装群施工时，桩会把土挤紧或使土上拱。因此应由一端向另一端打，先深后浅，先坡后坡脚；密集群桩由中心向四边打；靠近建筑的桩先打，然后往外打。",{"id":6,"name":21,"category":22,"favorite":23},"(市政施工)基础知识","建筑工程",0]