[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255537":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255537,839,2,"多选题","预算定额包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","劳动定额",true,{"key":16,"text":17,"correct":14},"B","材料消耗定额",{"key":19,"text":20,"correct":14},"C","机械台班使用定额",{"key":22,"text":23,"correct":24},"D","时间定额",false,{"key":26,"text":27,"correct":24},"E","产量定额","ABC","预算定额包括劳动定额、材料消耗定额和机械台班使用定额。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]