[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255535":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255535,839,2,"多选题","工程量清单计价与定额计价的差别有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","编制工程量的单位不同",true,{"key":16,"text":17,"correct":14},"B","编制工程量清单的时间不同",{"key":19,"text":20,"correct":14},"C","表现形式不同",{"key":22,"text":23,"correct":14},"D","编制依据不同",{"key":25,"text":26,"correct":27},"E","适用范围不同",false,"ABCD","工程量清单计价与定额计价的差别：编制工程量的单位不同；编制工程量清单的时间不同；表现形式不同；编制依据不同。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]