[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255524":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255524,839,2,"多选题","对原路面以下的路床部分说法正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","全部为换填土",false,{"key":16,"text":17,"correct":14},"B","全部为填方",{"key":19,"text":20,"correct":21},"C","部分为换填土部分为填方",true,{"key":23,"text":24,"correct":21},"D","以原地面线和路基顶面线较低者为界进行计算",{"key":26,"text":27,"correct":14},"E","以原地面线和路基顶面线较高者为界进行计算","CD","路床填土部分属于换填土、部分属于填方，应当以原地面线盒路基顶面线较低者为界进行分别计算。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]