[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255522":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255522,839,2,"多选题","桥涵工程中，所计算的现浇混凝土工程量包含了（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","混凝土实体积",true,{"key":16,"text":17,"correct":18},"B","空心箱梁空心体积",false,{"key":20,"text":21,"correct":18},"C","空心板梁空心体积",{"key":23,"text":24,"correct":14},"D","钢筋、铁丝体积",{"key":26,"text":27,"correct":14},"E","预留压浆孔道体积","ADE","桥涵工程中，所计算的现浇混凝土工程量包含了混凝土实体积；钢筋、铁丝体积；预留压浆孔道体积。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]