[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255517":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255517,839,2,"多选题","工程量清单计价应包括招标文件规定的完成工程量清单所列项目的全部费用，含（ ）几种。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分部分项工程费",true,{"key":16,"text":17,"correct":14},"B","措施项目费",{"key":19,"text":20,"correct":14},"C","其他项目费和规费",{"key":22,"text":23,"correct":14},"D","税金",{"key":25,"text":26,"correct":27},"E","利润",false,"ABCD","招标工程量清单应以单位（项）工程为单位编制，应由分部分项工程项目清单、措施项目清单、其他项目清单、规费和税金项目清单组成。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]