[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255510":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255510,839,2,"多选题","施工项目目标控制的任务主要有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","质量目标控制",true,{"key":16,"text":17,"correct":14},"B","进度目标控制",{"key":19,"text":20,"correct":21},"C","投资目标控制",false,{"key":23,"text":24,"correct":14},"D","安全和环境目标控制",{"key":26,"text":27,"correct":14},"E","成本目标控制","ABDE","施工项目管理目标控制的任务主要有进度目标控制、质量目标控制、成本目标控制、安全和环境目标控制。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]