[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255507":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255507,839,2,"多选题","市政公用工程施工现场的管理内容包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合理规划施工用地",true,{"key":16,"text":17,"correct":18},"B","做好施工进度计划",false,{"key":20,"text":21,"correct":14},"C","适时调整施工现场总平面布置",{"key":23,"text":24,"correct":14},"D","对现场的使用要有检查",{"key":26,"text":27,"correct":14},"E","建立文明的施工现场","ACDE","施工现场管理的内容：（1）合理规划施工用地（2）做好施工总平面图设计（3）适时调整施工现场总平面布置（4）对现场的使用要有检查（5）建立文明的施工现场（6）及时清场转移",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]