[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255400":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1255400,839,2,"多选题","下列关于碎（砂）石桩法的各项中，正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","当用于消除粉细砂及粉土液化时，宜采用锤击沉管成桩法。",false,{"key":16,"text":17,"correct":14},"B","砂桩可采用沉管法，填料粒径不宜大于10mm",{"key":19,"text":20,"correct":21},"C","施工前应进行成桩工艺试验，试桩数量不应少于2根",true,{"key":23,"text":24,"correct":21},"D","黏性土地基宜从中间向外围或间隔跳打进行",{"key":26,"text":27,"correct":21},"E","碎（砂）石桩施工后，应将基底标高下的松散层挖除或碾压密实，并在其上铺设一层300～500mm厚的碎石垫层","CDE","当用于消除粉细砂及粉土液化时，宜采用振动沉管成桩法。砂桩可采用沉管法，填料粒径不宜大于5mm。施工前应进行成桩工艺试验，试桩数量不应少于2根。黏性土地基宜从中间向外围或间隔跳打进行。碎（砂）石桩施工后，应将基底标高下的松散层挖除或碾压密实，并在其上铺设一层300～500mm厚的碎石垫层。",{"id":6,"name":31,"category":32,"favorite":33},"(市政施工)基础知识","建筑工程",0]