[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255185":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1255185,839,1,"单选题","某市政项目的独立土方工程，招标文件中估计工程量为100万m3，甲乙合同中约定；土方工程单价为6元\u002Fm3，当实际工程量超过估计工程量20％时，调整单价，单价调为4元\u002Fm3。工程结束时核算实际完成土方工程量为130万m3。 合同约定范围内（20％以内）的工程款为（ ）万元。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","480",false,{"key":16,"text":17,"correct":14},"B","600",{"key":19,"text":20,"correct":14},"C","700",{"key":22,"text":23,"correct":24},"D","720",true,"120*6=720万元",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)基础知识","建筑工程",0]