[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255091":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1255091,839,1,"单选题","某连续梁桥全长179m，拟采用悬臂浇筑法施工，挂篮的主桁部分采用三角形结构，行走为整体移动，其余采用竹胶板。其施工程序计划如下：①在墩顶托架上浇筑0号块并实施墩梁临时固结系统。②在0号块上安装悬臂挂篮，向两侧依次对称地分段浇筑主梁至合龙段。③在临时支架或梁端与边墩向临时托架上支模板浇筑现浇梁段。④主梁合龙段可在改装的简支挂篮托架上浇筑。 挂篮施工、行走时的抗倾覆安全系数不得小于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":18},"B","2",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","4","挂篮施工、行走时的抗倾覆安全系数不得小于2.0。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)基础知识","建筑工程",0]