[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255057":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1255057,839,1,"单选题","软基处理施工中实施排水与降水应保证（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","路基土壤天然结构不受扰动",true,{"key":16,"text":17,"correct":18},"B","文明施工要求",false,{"key":20,"text":21,"correct":18},"C","进度要求",{"key":23,"text":24,"correct":18},"D","工地用水需要","软基处理施工中实施排水与降水应保证路基土壤天然结构不受扰动。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)基础知识","建筑工程",0]