[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1255011":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1255011,839,1,"单选题","用灌砂法检查压实度时，取土样的底面位置为每一压实层底部；用环刀法试验时，环刀位于压实层厚的（ ）深度。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","顶面",false,{"key":16,"text":17,"correct":14},"B","1\u002F3",{"key":19,"text":20,"correct":21},"C","1\u002F2",true,{"key":23,"text":24,"correct":14},"D","底部","用灌砂法、灌水（水袋）法检测压实度时，取土样的底面位置为每一压实层底部；用环刀法试验时，环刀中部处于压实层厚的1\u002F2深度；用核子仪试验时，应根据其类型，按说明书要求办理。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)基础知识","建筑工程",0]