[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1254845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1254845,839,1,"单选题","公路勘测阶段的测量工作不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","中线测量",false,{"key":16,"text":17,"correct":14},"B","路线纵横断面测量",{"key":19,"text":20,"correct":14},"C","带状地形测量",{"key":22,"text":23,"correct":24},"D","直接测量和间接测量",true,"公路勘测阶段的测量工作不包括直接测量和间接测量。",{"id":6,"name":27,"category":28,"favorite":29},"(市政施工)基础知识","建筑工程",0]