[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":592},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,9,50,1361,[13,34,45,57,65,77,89,98,110,122,134,146,158,170,182,194,204,216,228,240,251,263,272,280,288,300,312,324,336,348,360,372,384,396,408,420,428,440,452,464,476,485,497,509,520,532,544,556,568,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1253820,1,"单选题","进度统计报告是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","预算收入为基本控制目标",false,{"key":24,"text":25,"correct":22},"B","成本控制的指导性文件",{"key":27,"text":28,"correct":29},"C","实际成本发生的重要信息来源",true,{"key":31,"text":32,"correct":22},"D","施工成本计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1253821,"下列施工成本控制依据中，能提供工程实际完成量及工程款实际支付情况的是（ ）。",[38,40,41,43],{"key":20,"text":39,"correct":22},"工程承包合同",{"key":24,"text":32,"correct":22},{"key":27,"text":42,"correct":29},"进度报告",{"key":31,"text":44,"correct":22},"工程变更文件",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":31,"analysis":33},1253822,"某工程某月计划完成工程桩100根，计划单价为1.3万元\u002F根，实际完成工程桩110根，实际单价为1.4万元\u002F根，则费用偏差（CV）为（ ）万元。",[49,51,53,55],{"key":20,"text":50,"correct":22},"11",{"key":24,"text":52,"correct":22},"13",{"key":27,"text":54,"correct":22},"-13",{"key":31,"text":56,"correct":29},"-11",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":33},1253823,"工程的承包合同主要指（ ）。",[61,62,63,64],{"key":20,"text":21,"correct":29},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":31,"text":32,"correct":22},{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":20,"analysis":33},1253824,"预算成本是（ ）。",[69,71,73,75],{"key":20,"text":70,"correct":29},"又称项目承包成本，其加上项目企业期望利润后，即为项目经理的责任成本目标值",{"key":24,"text":72,"correct":22},"指施工过程中耗费的为构成工程实体或有助于过程工程实体形成的各项费用支出的和",{"key":27,"text":74,"correct":22},"施工项目承建所承包工程实际发生的各项生产费用的总和",{"key":31,"text":76,"correct":22},"项目经理在承包成本扣除预期成本计划降低额后的成本额",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":27,"analysis":33},1253825,"用赢得值法进行成本控制，以下不是基本参数的是（ ）。",[81,83,85,87],{"key":20,"text":82,"correct":22},"已完工作预算费用",{"key":24,"text":84,"correct":22},"计划工作实际费用",{"key":27,"text":86,"correct":29},"费用绩效指数",{"key":31,"text":88,"correct":22},"计划工作预算费用",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":20,"analysis":33},1253826,"实际成本是（ ）。",[93,94,96,97],{"key":20,"text":74,"correct":29},{"key":24,"text":95,"correct":22},"指为施工准备、组织管理施工作业而发生的费用支出，这些设计施工生产必须发生的",{"key":27,"text":72,"correct":22},{"key":31,"text":74,"correct":22},{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":27,"analysis":33},1253827,"①购置和建造固定资产、无形资产；②机械使用费；③支付的滞纳金、违约金；④企业赞助、捐赠支出；⑤劳动保护费；⑥施工措施费；⑦国家法律、法规规定以外的各种付费。不属于施工项目成本的是（ ）。",[102,104,106,108],{"key":20,"text":103,"correct":22},"①②③④",{"key":24,"text":105,"correct":22},"①③④⑥",{"key":27,"text":107,"correct":29},"①③④⑦",{"key":31,"text":109,"correct":22},"①④⑤⑦",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":27,"analysis":33},1253828,"施工项目成本是施工项目在施工中所发生的全部（ ）的总和。",[114,116,118,120],{"key":20,"text":115,"correct":22},"管理费用",{"key":24,"text":117,"correct":22},"建设费用",{"key":27,"text":119,"correct":29},"生产费用",{"key":31,"text":121,"correct":22},"ABC",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":27,"analysis":33},1253829,"施工成本分类的方法，按成本发生的时间划分为（ ）。",[126,128,130,132],{"key":20,"text":127,"correct":22},"抽象成本和实体成本",{"key":24,"text":129,"correct":22},"直接成本和间接成本",{"key":27,"text":131,"correct":29},"预算成本、计划成本和实际成本",{"key":31,"text":133,"correct":22},"固定成本和变动成本",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":20,"analysis":33},1253830,"某钢门窗安装工程，工程进行到第三个月末时，已完成工作预算费用40万元。完成工作实际费用为45万元，则该项目的成本控制效果是（ ）。",[138,140,142,144],{"key":20,"text":139,"correct":29},"费用偏差为-5万元，项目运行超出预算",{"key":24,"text":141,"correct":22},"费用偏差为5万元，项目运行节支",{"key":27,"text":143,"correct":22},"费用偏差为5万元，项目运行超出预算",{"key":31,"text":145,"correct":22},"费用偏差为-5万元，项目运行节支",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":24,"analysis":33},1253831,"施工项目成本计划是（ ）编制的项目经理部对项目施工成本进行计划管理的指导性文件。",[150,152,154,156],{"key":20,"text":151,"correct":22},"施工开始阶段",{"key":24,"text":153,"correct":29},"施工筹备阶段",{"key":27,"text":155,"correct":22},"施工准备阶段",{"key":31,"text":157,"correct":22},"施工进行阶段",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},1253832,"施工成本控制的步骤是（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":29},"比较一分析一预测一纠偏一检查",{"key":24,"text":165,"correct":22},"预测一检查一比较一分析一纠偏",{"key":27,"text":167,"correct":22},"检查一比较一分析一预测一纠偏",{"key":31,"text":169,"correct":22},"分析一检查一比较一预测一纠偏",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},1253833,"理想的项目成本管理结果应该是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"承包成本>计划成本>实际成本",{"key":24,"text":177,"correct":29},"计划成本>承包成本>实际成本",{"key":27,"text":179,"correct":22},"计划成本>实际成本>承包成本",{"key":31,"text":181,"correct":22},"承包成本>实际成本>计划成本",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1253834,"建立进度控制小组，将进度控制任务落实到个人属于施工项目进度控制措施中的（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":29},"组织措施",{"key":24,"text":189,"correct":22},"技术措施",{"key":27,"text":191,"correct":22},"经济措施",{"key":31,"text":193,"correct":22},"合同措施",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},1253835,"固定成本是（ ）。",[198,200,201,202],{"key":20,"text":199,"correct":29},"指在一定期间和一定的工程量范围内，成本额不受工程量增减变动的影响而相对固定的成本",{"key":24,"text":95,"correct":22},{"key":27,"text":74,"correct":22},{"key":31,"text":203,"correct":22},"指成本发生总额随着工程量的增减变动而成正比例变动的费用",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},1253836,"不属于施工组织总设计技术经济指标的是（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":22},"劳动生产率",{"key":24,"text":211,"correct":29},"投资利润率",{"key":27,"text":213,"correct":22},"项目施工成本",{"key":31,"text":215,"correct":22},"机械化程度",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1253837,"在施工成本控制的工作步骤中，“检查”的主要内容是（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"估计完成项目所需的总费用",{"key":24,"text":223,"correct":29},"了解工程进展情况及纠偏措施的执行情况和效果",{"key":27,"text":225,"correct":22},"及时了解施工单位是否超支",{"key":31,"text":227,"correct":22},"分析成本偏差的原因",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1253838,"确定施工成本偏差的严重性和偏差产生的原因，是施工成本控制过程中（ ）阶段要解决的问题。",[232,234,236,238],{"key":20,"text":233,"correct":22},"比较",{"key":24,"text":235,"correct":29},"分析",{"key":27,"text":237,"correct":22},"预测",{"key":31,"text":239,"correct":22},"纠偏",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":31,"analysis":33},1253839,"施工措施费目标成本的编制，以施工图预算其他直接费为收人依据，按施工方案和施工现场条件，预计（ ）、场地清理费、检验试验费、生产工具用具费、标准化与文明施工等发生的各项费用。",[244,246,248,250],{"key":20,"text":245,"correct":22},"二次搬运费",{"key":24,"text":247,"correct":22},"现场水电费",{"key":27,"text":249,"correct":22},"场地租借费",{"key":31,"text":121,"correct":29},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":31,"analysis":33},1253840,"属于直接成本是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":22},"管理人员的工资",{"key":24,"text":258,"correct":22},"奖金和津贴",{"key":27,"text":260,"correct":22},"办公费",{"key":31,"text":262,"correct":29},"施工措施费用",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":20,"analysis":33},1253841,"间接成本是（ ）。",[267,269,270,271],{"key":20,"text":268,"correct":29},"指为施工准备、组织管理施工作业而发生的费用支出，这些是施工生产必须发生的",{"key":24,"text":268,"correct":22},{"key":27,"text":74,"correct":22},{"key":31,"text":74,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},1253842,"施工成本分类的方法，按生产费用和工程量的关系划分为（ ）。",[276,277,278,279],{"key":20,"text":127,"correct":22},{"key":24,"text":129,"correct":22},{"key":27,"text":131,"correct":22},{"key":31,"text":133,"correct":29},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":31,"analysis":33},1253843,"变动成本是（ ）。",[284,285,286,287],{"key":20,"text":199,"correct":22},{"key":24,"text":95,"correct":22},{"key":27,"text":74,"correct":22},{"key":31,"text":203,"correct":29},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1253844,"起因物是（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"指直接引起中毒的物体或物质",{"key":24,"text":295,"correct":29},"导致事故发生的物体和物质",{"key":27,"text":297,"correct":22},"指直接引起伤害及中毒的物体或物质",{"key":31,"text":299,"correct":22},"导致伤害发生的物体和物质",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1253845,"在危险源的种类，属于第一种的（ ）。",[304,306,308,310],{"key":20,"text":305,"correct":29},"电能伤害",{"key":24,"text":307,"correct":22},"人的偏离标准要求的不安全行为",{"key":27,"text":309,"correct":22},"环境问题促使人的失误",{"key":31,"text":311,"correct":22},"物的故障发生",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1253846,"某工程施工中发生安全事故，造成2人死亡、9人受伤，直接经济损失240万元，按生产安全事故造成的人员伤亡或直接经济损失分类，该工程事故属于（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":29},"一般事故",{"key":24,"text":319,"correct":22},"较大事故",{"key":27,"text":321,"correct":22},"重大事故",{"key":31,"text":323,"correct":22},"特别重大事故",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":31,"analysis":33},1253847,"交通事故、火灾事故自发生之日起（ ）日内，事故造成的伤亡人数发生变化的，应当及时补报。",[328,330,332,334],{"key":20,"text":329,"correct":22},"20",{"key":24,"text":331,"correct":22},"30",{"key":27,"text":333,"correct":22},"14",{"key":31,"text":335,"correct":29},"7",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1253848,"设备安装工地绝大部分危险和有害因素属（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"第一类危险源",{"key":24,"text":343,"correct":29},"第二类危险源",{"key":27,"text":345,"correct":22},"第三类危险源",{"key":31,"text":347,"correct":22},"第四类危险源",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},1253849,"设备安装施工现场搅拌机前台、混凝土输送泵及运输车辆清洗等产生的废水应（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"根据施工方便就近排放",{"key":24,"text":355,"correct":22},"直接排人市政排水管网或河流",{"key":27,"text":357,"correct":22},"直接排出场外",{"key":31,"text":359,"correct":29},"通过现场沉淀池后排人市政排水管网",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},1253850,"某设备安装工程施工中，在主吊机提吊过程时，臂架系统发生斜向倾倒，吊臂及所吊塔体向一侧的钢结构和安装平台倾倒。按安全事故类别分类，该工程事故属于（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"物体打击",{"key":24,"text":367,"correct":29},"起重伤害",{"key":27,"text":369,"correct":22},"机械伤害",{"key":31,"text":371,"correct":22},"高处坠落",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},1253851,"安全生产中规定，（ ）以上的高处、悬空作业、无安全设施的，必须系好安全带，扣好保险钩。",[376,378,380,382],{"key":20,"text":377,"correct":29},"2m",{"key":24,"text":379,"correct":22},"3m",{"key":27,"text":381,"correct":22},"4m",{"key":31,"text":383,"correct":22},"5m",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":31,"analysis":33},1253852,"施工现场为避免或减少污染物向外扩散，围挡设置高度不得低于1.8m，临街不得低于（ ）m。",[388,390,392,394],{"key":20,"text":389,"correct":22},"1.6",{"key":24,"text":391,"correct":22},"1.8",{"key":27,"text":393,"correct":22},"2.0",{"key":31,"text":395,"correct":29},"2.5",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1253853,"以下关于安全检查内容说法正确的是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":29},"查思想主要检查企业的领导和职工对安全生产工作的认识",{"key":24,"text":403,"correct":22},"查管理主要检查作业现场是否符合安全生产、文明生产的要求",{"key":27,"text":405,"correct":22},"查隐患主要检查对过去提出问题的整改情况",{"key":31,"text":407,"correct":22},"查整改主要检查工程的安全生产管理是否有效",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1253854,"某公司接集团总部指令，组建一支电气作业队去灾区抢修10kV以下的架空输电线路。由A公司技术、安全部门负责组织作业前的动员和培训，除公司领导作动员报告外，技术部门负责人做任务交底和方案交底，安全部门负责人及专业施工员做了作业安全技术交底。并安排全体作业人员进行身体健康检查，对电工登高作业用具及施工机械按规定做试验性检查，保证抢修人员和机具完好程度都处于良好的准备状态，专业施工员特别对立杆、紧线的安全技术要求进行了讲解，由于准备充分、安全措施到位，即使在非常规状态下施工，还是顺利完成了任务。请针对上述情况，回答下列问题。 以下不属于立杆施工注意事项是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":29},"采用三相四线制中性点直接接地系统，并须独立设置，其接地电阻值不得大于10",{"key":24,"text":415,"correct":22},"立杆要注意杆坑深度是否符合要求，填土是否夯实，杆的稳定用绳索是否绑扎可靠",{"key":27,"text":417,"correct":22},"焙土要形成凸台",{"key":31,"text":419,"correct":22},"机械立杆不要站在竖立中电杆的下方，立杆作业要设立警戒区标志",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},1253855,"某电气工程施工中发生触电事故，经抢救15人生还，5人死亡，该事故属于（ ）。",[424,425,426,427],{"key":20,"text":323,"correct":22},{"key":24,"text":321,"correct":22},{"key":27,"text":319,"correct":29},{"key":31,"text":317,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1253856,"环境事故发生后的处置不包括（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":29},"建立对施工现场环境保护的制度",{"key":24,"text":435,"correct":22},"按应急预案立即采取措施处理，防止事故扩大或发生次生灾害",{"key":27,"text":437,"correct":22},"积极接受事故调查处理",{"key":31,"text":439,"correct":22},"暂停相关施工作业，保护好事故现场",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},1253857,"以下不属于文明施工管理主要内容的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"好项目文化建设；规范场容",{"key":24,"text":447,"correct":22},"保持作业环境整洁卫生",{"key":27,"text":449,"correct":22},"创造文明有序安全生产的条件",{"key":31,"text":451,"correct":29},"消除对居民和环境的不利影响",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1253858,"应急预案的主要内容不包括（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":29},"各种救护设施是否齐全有效",{"key":24,"text":459,"correct":22},"可依托的社会力量及其救援和联络程序",{"key":27,"text":461,"correct":22},"应急避险的行动程序，应急预案的培训程序",{"key":31,"text":463,"correct":22},"发生事故时应采取的有效措施",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1253859,"文明施工要求，场容管理不包括（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":29},"建立施工保护措施",{"key":24,"text":471,"correct":22},"建立文明施工责任制，划分区域，明确管理负责人",{"key":27,"text":473,"correct":22},"施工地点和周围清洁整齐，做到随时处理、工完场清",{"key":31,"text":475,"correct":22},"施工现场不随意堆垃圾，要按规划地点分类堆放，定期处理，并按规定分类清理",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1253860,"施工现场为避免或减少污染物向外扩散，围挡设置高度一般不得低于（ ）m。",[480,481,482,483],{"key":20,"text":389,"correct":22},{"key":24,"text":391,"correct":29},{"key":27,"text":393,"correct":22},{"key":31,"text":484,"correct":22},"2",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},1253861,"不属于报告事故应该包括的内容（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"事故发生单位概况",{"key":24,"text":492,"correct":22},"事故发生的时间、地点以及事故现场的情况",{"key":27,"text":494,"correct":29},"进行补救的措施",{"key":31,"text":496,"correct":22},"其他应当报告的情况",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},1253862,"某公司接集团总部指令，组建一支电气作业队去灾区抢修10kV以下的架空输电线路。由A公司技术、安全部门负责组织作业前的动员和培训，除公司领导作动员报告外，技术部门负责人做任务交底和方案交底，安全部门负责人及专业施工员做了作业安全技术交底。并安排全体作业人员进行身体健康检查，对电工登高作业用具及施工机械按规定做试验性检查，保证抢修人员和机具完好程度都处于良好的准备状态，专业施工员特别对立杆、紧线的安全技术要求进行了讲解，由于准备充分、安全措施到位，即使在非常规状态下施工，还是顺利完成了任务。请针对上述情况，回答下列问题。 下列选项中不属于安全技术交底内容的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"分部分项工程概括",{"key":24,"text":504,"correct":22},"施工资源配置情况",{"key":27,"text":506,"correct":29},"施工单位相关业绩",{"key":31,"text":508,"correct":22},"施工人员应注意的安全事项",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},1253863,"某安装公司在钢结构安装过程中发生整体倾覆事故，正在施工的工人3人死了，52人重伤。按照事故造成损失的严重程度，该事故可判定为（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"一般质量事故",{"key":24,"text":516,"correct":22},"较大质量事故",{"key":27,"text":518,"correct":29},"重大质量事故",{"key":31,"text":323,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1253864,"文明施工要求，材料管理不包括（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"库房内材料要分类码放整齐，限宽限高，上架入箱，标识齐全",{"key":24,"text":527,"correct":22},"易燃易爆及有毒有害物品仓库按规定距离单独设立，且远离生活区和施工区，有专人保护",{"key":27,"text":529,"correct":22},"配有消防器材",{"key":31,"text":531,"correct":29},"库房应高大宽敞",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1253865,"对房屋建筑安装工程中产生的环境污染源识别后，应按以下程序采取措施不包括（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"对确定的重要环境因素制定目标、指标及管理方案",{"key":24,"text":539,"correct":29},"及时通报可能受到污染危害的单位和居民",{"key":27,"text":541,"correct":22},"明确相关岗位人员和管理人员的职责",{"key":31,"text":543,"correct":22},"建立环境保护信息沟通渠道，实施有效监督，做到施工全过程监控，鼓励社会监督",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},1253866,"工程项目安全检查的目的是为了消除隐患、防止事故，以下不属于安全检查分类项目的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"日常性检查",{"key":24,"text":551,"correct":22},"专业性检查",{"key":27,"text":553,"correct":29},"非季节性检查",{"key":31,"text":555,"correct":22},"节假日前后的检查",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1253867,"以下不属于安全事故处理四不放过原则的为（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"事故原因没有查清楚不放过",{"key":24,"text":563,"correct":22},"事故责任者没有受到处理不放过",{"key":27,"text":565,"correct":22},"群众没有受到教育不放过",{"key":31,"text":567,"correct":29},"奖惩措施不落实不放过",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1253868,"以下属于建筑企业的安全生产方针是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"安全第一，惩罚违法",{"key":24,"text":575,"correct":29},"安全第一，预防为主，综合治理",{"key":27,"text":577,"correct":22},"安全第一，综合治理",{"key":31,"text":579,"correct":22},"安全第一，确保安全",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},1253869,"安全“三宝”是指安全帽、安全带和（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"安全绳",{"key":24,"text":587,"correct":22},"防滑鞋",{"key":27,"text":589,"correct":29},"安全网",{"key":31,"text":591,"correct":22},"安全梯",[593,596,599,602,605,608],{"id":15,"name":594,"category":7,"favorite":595},"领导干部任职前廉政法规知识测试题",92,{"id":597,"name":598,"category":7,"favorite":15},595,"建筑结构与设备",{"id":600,"name":601,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":603,"name":604,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":606,"name":607,"category":7,"favorite":8},534,"BIM工程师",{"id":609,"name":607,"category":7,"favorite":8},535]