[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,8,50,1361,[13,34,46,58,70,82,94,106,118,130,142,150,162,174,186,198,210,222,234,246,258,266,278,290,302,313,323,335,345,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,541,553,561,573,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1253770,1,"单选题","过程的输出不能由后续的监视或测量加以验证，需要进行过程确认的过程是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","一般过程",false,{"key":24,"text":25,"correct":26},"B","特殊过程",true,{"key":28,"text":29,"correct":22},"C","关键过程",{"key":31,"text":32,"correct":22},"D","重要过程","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1253771,"生产过程各项作业的检验以（ ）为主，专职检验人员巡回抽检为辅，成品质量必须进行最终认证。",[38,40,42,44],{"key":20,"text":39,"correct":22},"专业工程师",{"key":24,"text":41,"correct":22},"专职检验人员",{"key":28,"text":43,"correct":22},"材料责任工程师",{"key":31,"text":45,"correct":26},"施工现场操作人员的自检、互检",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1253772,"当梁突出顶棚高度（ ）mm时，被梁隔断的每个梁间区域，至少应设置（ ）只探测器。",[50,52,54,56],{"key":20,"text":51,"correct":22},"600，二",{"key":24,"text":53,"correct":22},"500，二",{"key":28,"text":55,"correct":26},"600，一",{"key":31,"text":57,"correct":22},"500，一",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1253773,"不属于事中质量控制的具体措施是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"控制施工有重点",{"key":24,"text":65,"correct":22},"质量处理有复查",{"key":28,"text":67,"correct":22},"材料代换有制度",{"key":31,"text":69,"correct":22},"设计变更有手续",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1253774,"下列机电安装施工过程中，属于特殊过程的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"压力管道焊接",{"key":24,"text":77,"correct":22},"高压设备或高压管道耐压严密性试验",{"key":28,"text":79,"correct":22},"大型设备吊装",{"key":31,"text":81,"correct":22},"大型设备现场组装",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1253775,"工序未执行施工操作规程，无证上岗引起的质量事故属于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"操作责任事故",{"key":24,"text":89,"correct":26},"指导责任事故",{"key":28,"text":91,"correct":22},"一般质量事故",{"key":31,"text":93,"correct":22},"严重质量问题",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1253776,"法兰连接螺栓应加镀锌平垫圈，且均匀拧紧。吊杆螺栓与横架型钢连接下端用（ ）在调整水平度后锁紧，上面用（ ）锁紧。",[98,100,102,104],{"key":20,"text":99,"correct":22},"双螺母双螺母",{"key":24,"text":101,"correct":26},"双螺母单螺母",{"key":28,"text":103,"correct":22},"单螺母双螺母",{"key":31,"text":105,"correct":22},"单螺母单螺母",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1253777,"施工组织设计复核由（ ）进行。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目经理",{"key":24,"text":113,"correct":22},"项目副经理",{"key":28,"text":115,"correct":26},"项目部总工程师",{"key":31,"text":117,"correct":22},"项目部专业工程师",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1253778,"房屋建筑安装工程中排水是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"机械流",{"key":24,"text":125,"correct":26},"重力流",{"key":28,"text":127,"correct":22},"动力流",{"key":31,"text":129,"correct":22},"压力流",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1253779,"对涉及结构安全和使用功能的重要分部分项工程应进行（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"局部检测",{"key":24,"text":137,"correct":22},"全面检测",{"key":28,"text":139,"correct":26},"抽样检测",{"key":31,"text":141,"correct":22},"指定部位检测",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1253780,"对产品的质量特性起决定性作用的过程是（ ）。",[146,147,148,149],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1253781,"做好玻璃钢风管的成品保护，属于（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"事前阶段质量控制",{"key":24,"text":157,"correct":26},"事中阶段质量控制",{"key":28,"text":159,"correct":22},"事后阶段质量控制",{"key":31,"text":161,"correct":22},"事前阶段管理控制",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1253782,"引入摄像机的电缆要有（ ）m的余量在外。",[166,168,170,172],{"key":20,"text":167,"correct":26},"1",{"key":24,"text":169,"correct":22},"2",{"key":28,"text":171,"correct":22},"3",{"key":31,"text":173,"correct":22},"4",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},1253783,"物资准备包括（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"控制网、水准点、标桩的测量，“五通一平”，生产、生活临时设施等准备",{"key":24,"text":181,"correct":22},"项目扩大初步设计方案的审查，熟悉和审查项目的施工图纸，项目建设地点自然条件、技术经济条件调查分析，编制项目施工图预算和施工预算，编制项目施工组织设计等",{"key":28,"text":183,"correct":22},"建立项目组织机构，集结施工队伍，对施工人员进行入场教育等",{"key":31,"text":185,"correct":26},"建筑材料准备，构配件和制品加工准备，施工机具准备，生产工艺设备的准备等",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1253784,"在质量管理的PDCA循环中：其中A是指（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"计划",{"key":24,"text":193,"correct":22},"实施",{"key":28,"text":195,"correct":22},"检查",{"key":31,"text":197,"correct":26},"处置",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1253785,"现场进行质量检查的方法有（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"看、摸、敲、照四个字",{"key":24,"text":205,"correct":26},"目测法、实测法和试验检查三种",{"key":28,"text":207,"correct":22},"靠、吊、量、套四个字",{"key":31,"text":209,"correct":22},"计划、实施、检查和改进",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},1253786,"室外摄像机要备有（ ），摄像机外壳和视频电缆一样对地（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":26},"防雨罩绝缘",{"key":24,"text":217,"correct":22},"挡风罩绝缘",{"key":28,"text":219,"correct":22},"防雨罩导电",{"key":31,"text":221,"correct":22},"挡风罩导电",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1253787,"项目施工组织设计批准后，（ ）牵头向项目现场管理工程师交底。",[226,228,230,232],{"key":20,"text":227,"correct":26},"项目总工程师",{"key":24,"text":229,"correct":22},"方案编制人",{"key":28,"text":231,"correct":22},"项目现场管理工程师",{"key":31,"text":233,"correct":22},"分包单位施工人员",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1253788,"事前质量控制指在正式施工前的质量控制，其控制重点是（ ）",[238,240,242,244],{"key":20,"text":239,"correct":22},"全面控制施工过程，重点工序质量",{"key":24,"text":241,"correct":26},"做好施工准备工作，且施工准备工作要贯穿施工全过程中",{"key":28,"text":243,"correct":22},"工序交接有对策",{"key":31,"text":245,"correct":22},"质量文件有档案",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1253789,"“四新”指的是施工中（ ）的应用。",[250,252,254,256],{"key":20,"text":251,"correct":26},"新材料",{"key":24,"text":253,"correct":22},"新方法",{"key":28,"text":255,"correct":22},"新方案",{"key":31,"text":257,"correct":22},"新机体",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1253790,"施工方案、图纸会审、设计变更、施工技术交底复核由（ ）进行。",[262,263,264,265],{"key":20,"text":111,"correct":22},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":26},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1253791,"建筑安装工程施工过程中质量检查实行三检制，是指（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"作业人员的“自检”和专职质量员的“专检”、“互检”相结合的检查制度",{"key":24,"text":273,"correct":26},"作业人员的“自检”、“互检”和专职质量员的“专检”相结合的检查制度",{"key":28,"text":275,"correct":22},"作业人员的“互检”、“专检”和专职质量员的“自检”相结合的检查制度",{"key":31,"text":277,"correct":22},"作业人员的“自检”、“互检”和“专检”相结合的检查制度",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},1253792,"水泵运转时发生跳动，大部分原因是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":26},"转动部分不平衡，产生离心力所致",{"key":24,"text":285,"correct":22},"轴心转动不一致",{"key":28,"text":287,"correct":22},"连轴器不同心",{"key":31,"text":289,"correct":22},"两轴即无径向位移，也无角向位移，两轴中心线完全重合",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1253793,"（ ）是影响工程质量的主要因素。",[294,296,298,300],{"key":20,"text":295,"correct":22},"自然因素",{"key":24,"text":297,"correct":26},"人的因素",{"key":28,"text":299,"correct":22},"设计因素",{"key":31,"text":301,"correct":22},"方法因素",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1253794,"检查的工序活动的结果，一旦发现问题，即停止作业活动进行处理，直到符合要求。判定符合要求的标准是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"各专业的施工质量验收规范，规范必须是现行的有效版本",{"key":24,"text":309,"correct":22},"各专业的施工质量验收规范，规范可以是任意的有效版本",{"key":28,"text":311,"correct":22},"各专业的施工质量设计规范，规范可以是任意的有效版本",{"key":31,"text":311,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1253795,"室外摄像机安装高度不低于（ ）m。",[317,318,320,321],{"key":20,"text":173,"correct":22},{"key":24,"text":319,"correct":26},"3.5",{"key":28,"text":171,"correct":22},{"key":31,"text":322,"correct":22},"2.5",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},1253796,"单位工程竣工验收由（ ）组织。",[327,329,331,333],{"key":20,"text":328,"correct":22},"总包项目经理",{"key":24,"text":330,"correct":22},"总包技术负责任人",{"key":28,"text":332,"correct":26},"建设单位（项目）负责人",{"key":31,"text":334,"correct":22},"总监理工程师",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1253797,"施工质量计划编制完毕，应经（ ）审核批准，并按施工承包合同的约定提交工程监理或建设单位批准确认后执行。",[339,341,342,343],{"key":20,"text":340,"correct":26},"企业技术领导",{"key":24,"text":227,"correct":22},{"key":28,"text":229,"correct":22},{"key":31,"text":344,"correct":22},"现场管理工程师",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1253798,"做好通风空调工程的调试试运转事故方案并实施是（ ）。",[349,350,351,352],{"key":20,"text":155,"correct":22},{"key":24,"text":157,"correct":22},{"key":28,"text":159,"correct":26},{"key":31,"text":161,"correct":22},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1253799,"不属于施工项目质量管理的特点（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"贯彻科学、公正、守法的职业规范",{"key":24,"text":360,"correct":22},"影响质量的因素多",{"key":28,"text":362,"correct":22},"质量检查不能解体、拆卸；质量易受投资、进度制约",{"key":31,"text":364,"correct":22},"易产生第一、第二判断错误",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1253800,"按照工程重要程度，单位工程开工前，应由企业或项目技术负责人组织全面的",[369,371,373,375],{"key":20,"text":370,"correct":22},"组织管理",{"key":24,"text":372,"correct":22},"责任分工",{"key":28,"text":374,"correct":22},"进度安排",{"key":31,"text":376,"correct":26},"技术交底",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1253801,"某医院医技综合楼机电总承包工程，具体工作范围包括给排水、电气、暖通空调、消防、智能、净化、医疗气体工程。大楼管线系统复杂，质量要求高，项目部为搞好工程质量，保证施工进度安全等各项指标的实现，在项目开工前进行了详细的质量策划、制定质量控制点、组织质量交底、技术交底，有效实现了项目的各项指标。根据背景资料，回答下列问题。 施工组织设计的关键是保证（ ）目标的实现。",[381,383,385,387],{"key":20,"text":382,"correct":22},"进度",{"key":24,"text":384,"correct":26},"质量",{"key":28,"text":386,"correct":22},"成本",{"key":31,"text":388,"correct":22},"安全",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1253802,"根据工程质量事故造成的人员伤亡或者直接经济损失，工程质量事故分为4个等级，其中造成100万元以上1000万元以下直接经济损失的质量事故属于（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"一般事故",{"key":24,"text":396,"correct":22},"较大事故",{"key":28,"text":398,"correct":22},"重大事故",{"key":31,"text":400,"correct":22},"特别重大事故",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1253803,"工程竣工后（ ）应依据《建设工程质量管理条例》和建设部的有关规定，到县级以上人民政府建设行政主管部门或其他有关部门备案。",[405,407,409,411],{"key":20,"text":406,"correct":26},"建设单位",{"key":24,"text":408,"correct":22},"监理单位",{"key":28,"text":410,"correct":22},"总包单位",{"key":31,"text":412,"correct":22},"设计单位",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},1253804,"某医院医技综合楼机电总承包工程，具体工作范围包括给排水、电气、暖通空调、消防、智能、净化、医疗气体工程。大楼管线系统复杂，质量要求高，项目部为搞好工程质量，保证施工进度安全等各项指标的实现，在项目开工前进行了详细的质量策划、制定质量控制点、组织质量交底、技术交底，有效实现了项目的各项指标。根据背景资料，回答下列问题。 判定符合要求的标准时各专业的现行有效（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"工艺规程",{"key":24,"text":420,"correct":22},"工艺技术标准",{"key":28,"text":422,"correct":26},"施工质量验收规范",{"key":31,"text":424,"correct":22},"合同约定",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1253805,"某医院医技综合楼机电总承包工程，具体工作范围包括给排水、电气、暖通空调、消防、智能、净化、医疗气体工程。大楼管线系统复杂，质量要求高，项目部为搞好工程质量，保证施工进度安全等各项指标的实现，在项目开工前进行了详细的质量策划、制定质量控制点、组织质量交底、技术交底，有效实现了项目的各项指标。根据背景资料，回答下列问题。 通过施工质量策划形成的施工质量计划等同于（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"技术方案",{"key":24,"text":432,"correct":22},"质量方案",{"key":28,"text":434,"correct":22},"施工方案",{"key":31,"text":436,"correct":26},"施工组织设计",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1253806,"成本分析的内容分为事前的成本预测分析、（ ）、事后的成本监控。",[441,443,445,447],{"key":20,"text":442,"correct":22},"事中的成本分析",{"key":24,"text":444,"correct":22},"过程中的成本分析",{"key":28,"text":446,"correct":22},"日常的成本分析",{"key":31,"text":448,"correct":26},"施工中的成本分析",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},1253807,"属于间接成本是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"人工费",{"key":24,"text":456,"correct":22},"材料费",{"key":28,"text":458,"correct":26},"交通费",{"key":31,"text":460,"correct":22},"施工机械使用费",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1253808,"施工项目目标成本的确定，人工、材料、机械的价格（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":26},"按市场价取定",{"key":24,"text":468,"correct":22},"按投标报价文件规定取定",{"key":28,"text":470,"correct":22},"按现行机械台班单价、周转设备租赁单价取定",{"key":31,"text":472,"correct":22},"按实际发生价取定",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1253809,"进行施工成本的材料费控制，主要控制的内容有（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":26},"材料用量",{"key":24,"text":480,"correct":22},"材料定额",{"key":28,"text":482,"correct":22},"材料数量标准",{"key":31,"text":484,"correct":22},"材料价格",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1253810,"施工成本控制过程中，为了及时发现施工成本是否超支，应该定期进行（ ）的比较。",[489,491,493,495],{"key":20,"text":490,"correct":26},"施工成本计划值与实际值",{"key":24,"text":492,"correct":22},"施工成本计划值与投标报价",{"key":28,"text":494,"correct":22},"成本实际值与投标报价",{"key":31,"text":496,"correct":22},"实际工程款支付与合同价",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},1253811,"成本控制是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"在预测的基础上，以货币的形式编制的在工程施工计划期内的生产费用、成本水平和成本降低率，以及为降低成本采取的主要措施和规范的书面文件",{"key":24,"text":504,"correct":22},"把生产费用正确地归集到承担的客体",{"key":28,"text":506,"correct":26},"指在施工活动中对影响成本的因素进行加强管理",{"key":31,"text":508,"correct":22},"说把费用归集到核算的对象账上",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},1253812,"项目管理层是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"其管理以企业确定的项目成本为目标，体现现场生产成本控制中心的监理职能",{"key":24,"text":516,"correct":22},"其管理从投标开始止于结算的全过程，着眼于体现效益中心的监督职能",{"key":28,"text":518,"correct":22},"其管理从投标开始止于结算的全过程，着眼于体现效益中心的管理职能",{"key":31,"text":520,"correct":26},"其管理以企业确定的施工成本为目标，体现现场生产成本控制中心的管理职能",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1253813,"下列关于施工成本控制的说法，不正确的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"施工成本控制应贯穿项目从投标开始到工程竣工验收的全过程",{"key":24,"text":528,"correct":26},"施工成本控制应对成本的形成过程进行分析，并寻求进一步降低成本的途径",{"key":28,"text":530,"correct":22},"施工成本控制需按动态控制原理对实际施工成本的发生过程进行有效控制",{"key":31,"text":532,"correct":22},"进度报告和工程变更及索赔资料是施工成本控制过程中的动态资料",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1253814,"成本计划是（ ）。",[537,538,539,540],{"key":20,"text":502,"correct":26},{"key":24,"text":504,"correct":22},{"key":28,"text":506,"correct":22},{"key":31,"text":508,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1253815,"施工项目的成本管理的最终目标是（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"低成本",{"key":24,"text":548,"correct":22},"高质量",{"key":28,"text":550,"correct":22},"短工期",{"key":31,"text":552,"correct":26},"ABC",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1253816,"企业管理层是（ ）。",[557,558,559,560],{"key":20,"text":518,"correct":26},{"key":24,"text":520,"correct":22},{"key":28,"text":514,"correct":22},{"key":31,"text":516,"correct":22},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},1253817,"计划成本是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"又称项目承包成本，其加上项目企业期望利润后，即为项目经理的责任成本目标值",{"key":24,"text":568,"correct":22},"指施工过程中耗费的为构成工程实体或有助于过程工程实体形成的各项费用支出的和",{"key":28,"text":570,"correct":22},"施工项目承建所承包工程实际发生的各项生产费用的总和",{"key":31,"text":572,"correct":26},"项目经理在承包成本扣除预期成本计划降低额后的成本额",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1253818,"成本核算是（ ）。",[577,578,579,580],{"key":20,"text":504,"correct":26},{"key":24,"text":502,"correct":22},{"key":28,"text":506,"correct":22},{"key":31,"text":581,"correct":22},"指在项目管理中对影响成本的因素进行加强管理",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1253819,"施工成本分类的方法，按生产费用进入成本的方法划分为（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"抽象成本和实体成本",{"key":24,"text":589,"correct":26},"直接成本和间接成本",{"key":28,"text":591,"correct":22},"预算成本、计划成本和实际成本",{"key":31,"text":593,"correct":22},"固定成本和变动成本",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]