[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,7,50,1361,[13,34,46,58,66,78,90,102,114,122,134,145,157,169,181,190,202,214,226,238,250,262,274,286,298,310,322,330,338,350,362,374,386,394,406,418,430,442,451,463,475,487,499,511,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1253720,1,"单选题","质量改进是指（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","致力于增强满足质量要求的能力",true,{"key":24,"text":25,"correct":26},"B","致力于满足质量要求",false,{"key":28,"text":29,"correct":26},"C","致力于制定质量目标并规定必要的运行工程和相关资源以实现质量目标",{"key":31,"text":32,"correct":26},"D","致力于提供质量要求会得到满足的信任","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1253721,"工序的质量控制是（ ）质量控制的重点。",[38,40,42,44],{"key":20,"text":39,"correct":26},"设计阶段",{"key":24,"text":41,"correct":26},"施工准备阶段",{"key":28,"text":43,"correct":22},"施工阶段",{"key":31,"text":45,"correct":26},"竣工验收阶段",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1253722,"ZSTB15的玻璃球色标为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"红色",{"key":24,"text":53,"correct":26},"黄色",{"key":28,"text":55,"correct":22},"绿色",{"key":31,"text":57,"correct":26},"橙色",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1253723,"质量策划是指（ ）。",[62,63,64,65],{"key":20,"text":21,"correct":26},{"key":24,"text":29,"correct":22},{"key":28,"text":25,"correct":26},{"key":31,"text":32,"correct":26},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1253724,"连轴器找正的基本要求是（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":26},"转动部分不平衡，产生离心力所致",{"key":24,"text":73,"correct":26},"轴心转动不一致",{"key":28,"text":75,"correct":26},"连轴器不同心",{"key":31,"text":77,"correct":22},"两轴即无径向位移，也无角向位移，两轴中心线完全重合",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":20,"analysis":33},1253725,"首层两处检验两股充实水柱同时达到消火栓应到的最远点的能力，充实水柱一般取为（ ）m。",[82,84,86,88],{"key":20,"text":83,"correct":22},"10",{"key":24,"text":85,"correct":26},"15",{"key":28,"text":87,"correct":26},"20",{"key":31,"text":89,"correct":26},"25",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},1253726,"点型火灾探测器安装的基本规定是，探测器（ ）m内不应有遮挡物。",[94,96,98,100],{"key":20,"text":95,"correct":26},"2",{"key":24,"text":97,"correct":26},"1.5",{"key":28,"text":99,"correct":26},"1",{"key":31,"text":101,"correct":22},"0.5",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},1253727,"边长或直径大于（ ）mm的弯管、三通、消声弯管等应单独设置支架，不应由部件与直管的接口承重。",[106,108,110,112],{"key":20,"text":107,"correct":26},"1000",{"key":24,"text":109,"correct":26},"900",{"key":28,"text":111,"correct":26},"1150",{"key":31,"text":113,"correct":22},"1250",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1253728,"ZSTP15的玻璃球色标为（ ）。",[118,119,120,121],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":57,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1253729,"工程施工前，由（ ）向施工单位有关技术人员进行设计交底。",[126,128,130,132],{"key":20,"text":127,"correct":26},"建设单位",{"key":24,"text":129,"correct":22},"设计单位",{"key":28,"text":131,"correct":26},"监理单位",{"key":31,"text":133,"correct":26},"施工单位",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":28,"analysis":33},1253730,"点型火灾探测器安装的基本规定是，探测器接线应留有余量（ ）cm，接线后应封堵接线口。",[138,140,142,143],{"key":20,"text":139,"correct":26},"12",{"key":24,"text":141,"correct":26},"14",{"key":28,"text":85,"correct":22},{"key":31,"text":144,"correct":26},"18",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":20,"analysis":33},1253731,"质量事故是（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"由于工程质量不符合标准规定，而引起或造成规定数额以上的经济损失、导致工期严重延误，或造成人身设备安全事故、影响使用功能",{"key":24,"text":152,"correct":26},"施工质量不符合标准规定，直接经济损失也没有超过额度，不影响使用功能和工程结构安全的，也不会有永久性不可弥补损失",{"key":28,"text":154,"correct":26},"施工质量不符合标准规定，直接经济损失也没有超过额度，影响使用功能和工程结构安全的，也不会有永久性不可弥补损失",{"key":31,"text":156,"correct":26},"由于工程质量符合标准规定，而引起或造成规定数额以上的经济损失、导致工期严重延误，或造成人身设备安全事故、影响使用功能",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":31,"analysis":33},1253732,"漏光法检测，在环境黑暗的条件下，在风管内用一个电压不高于（ ）V功率高于（ ）W的手提行灯。",[161,163,165,167],{"key":20,"text":162,"correct":26},"24，50",{"key":24,"text":164,"correct":26},"36，50",{"key":28,"text":166,"correct":26},"24，100",{"key":31,"text":168,"correct":22},"36，100",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},1253733,"ZSTB15的额定动作温度为（ ）0C。",[173,175,177,179],{"key":20,"text":174,"correct":22},"93",{"key":24,"text":176,"correct":26},"63",{"key":28,"text":178,"correct":26},"67",{"key":31,"text":180,"correct":26},"97",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":28,"analysis":33},1253734,"点型火灾探测器安装的基本规定是，感温探测器安装间距不大于（ ）m。",[185,186,187,188],{"key":20,"text":85,"correct":26},{"key":24,"text":139,"correct":26},{"key":28,"text":83,"correct":22},{"key":31,"text":189,"correct":26},"9",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1253735,"质量员发现的管道承重支架有较大的质量缺陷是处于施工高峰期，应属于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"事前阶段的质量控制",{"key":24,"text":197,"correct":26},"事后阶段的质量控制",{"key":28,"text":199,"correct":22},"事中阶段的质量控制",{"key":31,"text":201,"correct":26},"施工阶段的质量控制",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1253736,"质量员发现抱箍构造不合理，为验证构造不合理会导致抱箍功能失效的检查方法要用（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"实测法",{"key":24,"text":209,"correct":26},"目测法",{"key":28,"text":211,"correct":26},"试验法",{"key":31,"text":213,"correct":26},"检测法",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1253737,"风管连接处严密度合格标准为中压风管每（ ）m接缝，漏光点不大于（ ）处为合格。",[218,220,222,224],{"key":20,"text":219,"correct":26},"102",{"key":24,"text":221,"correct":22},"1O1",{"key":28,"text":223,"correct":26},"122",{"key":31,"text":225,"correct":26},"121",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1253738,"在质量管理的PDCA循环中：其中p是指（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"计划",{"key":24,"text":233,"correct":26},"实施",{"key":28,"text":235,"correct":26},"检查",{"key":31,"text":237,"correct":26},"处置",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1253739,"检验批及分项工程的验收由（ ）组织施工单位项目专业质量（技术）负责人等进行。",[242,244,246,248],{"key":20,"text":243,"correct":22},"监理工程师",{"key":24,"text":245,"correct":26},"总包技术负责任人",{"key":28,"text":247,"correct":26},"总包项目经理",{"key":31,"text":249,"correct":26},"施工单位负责人",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1253740,"对检验批的基本质量起决定性影响的是（ ），因此必须全部符合有关专业工程验收规范的规定。",[254,256,258,260],{"key":20,"text":255,"correct":22},"主控项目",{"key":24,"text":257,"correct":26},"一般项目",{"key":28,"text":259,"correct":26},"抽样检测项目",{"key":31,"text":261,"correct":26},"观感质量项目",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1253741,"实测法，实测检查法的手段可归纳为（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"看、摸、敲、照四个字",{"key":24,"text":269,"correct":26},"目测法、实测法和试验法三种",{"key":28,"text":271,"correct":22},"靠、吊、量、套四个字",{"key":31,"text":273,"correct":26},"计划、实施、检查和改进",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1253742,"中标后、开工前项目部的核心是（ ）",[278,280,282,284],{"key":20,"text":279,"correct":26},"工程质量目标的实现",{"key":24,"text":281,"correct":26},"编制实施的施工组织设计",{"key":28,"text":283,"correct":22},"使进度、质量、成本和安全的各项指标能实现",{"key":31,"text":285,"correct":26},"确定质量目标",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1253743,"当梁突出顶棚高度（ ）时，要按设计规范进行计算，确定保护面积和梁间区域探测器的个数。",[290,292,294,296],{"key":20,"text":291,"correct":26},"100mm～600mm",{"key":24,"text":293,"correct":26},"200mm～500mm",{"key":28,"text":295,"correct":26},"100mm～500mm",{"key":31,"text":297,"correct":22},"200mm～600mm",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1253744,"对风管材料进场验收的内容主要包括（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"风管的材质、规格、强度和严密性与成品的外观质量",{"key":24,"text":305,"correct":26},"风管的设计和尺寸。",{"key":28,"text":307,"correct":26},"风管的尺寸、规格和外观",{"key":31,"text":309,"correct":26},"风管的材质、规格、强度和严密性",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1253745,"不属于施工准备的内容（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"技术准备",{"key":24,"text":317,"correct":26},"物资准备",{"key":28,"text":319,"correct":26},"组织准备",{"key":31,"text":321,"correct":22},"分项工程施工准备",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1253746,"质量控制是指（ ）。",[326,327,328,329],{"key":20,"text":25,"correct":22},{"key":24,"text":29,"correct":26},{"key":28,"text":21,"correct":26},{"key":31,"text":32,"correct":26},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1253747,"在质量管理的PDCA循环中，总结经验，纠正偏差，并将遗留问题转人下一轮循环属于（ ）。",[334,335,336,337],{"key":20,"text":231,"correct":26},{"key":24,"text":233,"correct":26},{"key":28,"text":235,"correct":26},{"key":31,"text":237,"correct":22},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1253748,"工程的（ ）应由验收人员通过现场检查，并用共同确定。",[342,344,346,348],{"key":20,"text":343,"correct":26},"隐蔽工程质量",{"key":24,"text":345,"correct":22},"观感质量",{"key":28,"text":347,"correct":26},"结构安全质量",{"key":31,"text":349,"correct":26},"使用功能质量",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1253749,"施工项目质量计划的主要内容不包括（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":26},"质量目标",{"key":24,"text":357,"correct":26},"组织机构",{"key":28,"text":359,"correct":22},"主要施工方案",{"key":31,"text":361,"correct":26},"质量保证体系",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},1253750,"以下不是项目技术交底的层级是：（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":26},"施工组织设计的交底",{"key":24,"text":369,"correct":26},"施工方案的交底",{"key":28,"text":371,"correct":26},"分项工程交底",{"key":31,"text":373,"correct":22},"分部工程交底",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1253751,"ZSTP15的额定动作温度为（ ）0C。",[378,380,382,384],{"key":20,"text":379,"correct":22},"57",{"key":24,"text":381,"correct":26},"27",{"key":28,"text":383,"correct":26},"53",{"key":31,"text":385,"correct":26},"33",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1253752,"中标后、开工前项目部首先要做的是（ ）",[390,391,392,393],{"key":20,"text":279,"correct":26},{"key":24,"text":281,"correct":22},{"key":28,"text":283,"correct":26},{"key":31,"text":285,"correct":26},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1253753,"分部分项工程开工前，（ ）应组织施工员（专业工程师）编制工程质量通病预防措施，质量预防措施可单独编制，也可编制在施工组织设计或施工方案里。",[398,400,402,404],{"key":20,"text":399,"correct":22},"项目总工程师",{"key":24,"text":401,"correct":26},"方案编制人",{"key":28,"text":403,"correct":26},"质量检查员",{"key":31,"text":405,"correct":26},"分包单位施工人员",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1253754,"事中质量控制的策略是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"全面控制施工过程，重点控制工序质量",{"key":24,"text":413,"correct":26},"做好施工准备工作，且施工准备工作要贯穿施工全过程中",{"key":28,"text":415,"correct":26},"工序交接有对策",{"key":31,"text":417,"correct":26},"质量文件有档案",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},1253755,"自制吊杆的规格应符合设计要求，吊杆加长采用搭接双侧连接焊时，搭接长度不应小于吊杆直径的（ ）倍。",[422,424,426,428],{"key":20,"text":423,"correct":26},"4",{"key":24,"text":425,"correct":26},"5",{"key":28,"text":427,"correct":22},"6",{"key":31,"text":429,"correct":26},"7",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1253756,"当工程质量缺陷按修补方式处理不能达到规定的使用要求和安全，而又无法返工处理的情况下，可以作出（ ）的决定。",[434,436,438,440],{"key":20,"text":435,"correct":26},"不作处理",{"key":24,"text":437,"correct":26},"停工处理",{"key":28,"text":439,"correct":22},"限制使用",{"key":31,"text":441,"correct":26},"拆除处理",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1253757,"分部分项工程开工前，项目总工程师应组织（ ）编制工程质量通病预防措施。",[446,447,449,450],{"key":20,"text":401,"correct":26},{"key":24,"text":448,"correct":22},"施工员（专业工程师）",{"key":28,"text":403,"correct":26},{"key":31,"text":405,"correct":26},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1253758,"为使施工单位熟悉有关的设计图纸，充分了解拟建项目的特点、设计意图和工艺与质量要求，减少图纸的差错，消灭图纸中的质量隐患，要做好（ ）的工作。",[455,457,459,461],{"key":20,"text":456,"correct":26},"设计交底、图纸整理",{"key":24,"text":458,"correct":26},"设计修改、图纸审核",{"key":28,"text":460,"correct":22},"设计交底、图纸审核",{"key":31,"text":462,"correct":26},"设计修改、图纸整理",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},1253759,"探测器距端墙的距离为安装间距的（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"1\u002F2",{"key":24,"text":470,"correct":26},"2\u002F3",{"key":28,"text":472,"correct":26},"3\u002F4",{"key":31,"text":474,"correct":26},"3\u002F5",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1253760,"当梁突出顶棚高度小于（ ）mm时，可以不计梁对探测器保护面积的影响。",[479,481,483,485],{"key":20,"text":480,"correct":22},"200",{"key":24,"text":482,"correct":26},"100",{"key":28,"text":484,"correct":26},"150",{"key":31,"text":486,"correct":26},"300",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1253761,"风与空调工程的调试和调整目的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"把系统的每个出口用户的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":24,"text":494,"correct":26},"把系统的每个进口的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":28,"text":496,"correct":26},"把支管每个出口用户的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":31,"text":498,"correct":26},"把支管每个进口的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1253762,"重视节能效果，做好设备使用说明书的阅读，属于（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"事前阶段质量控制",{"key":24,"text":506,"correct":26},"事中阶段质量控制",{"key":28,"text":508,"correct":26},"事后阶段质量控制",{"key":31,"text":510,"correct":26},"事前阶段管理控制",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1253763,"质量员发现抱箍结构不合理，其检查方法为（ ）。",[515,516,517,518],{"key":20,"text":207,"correct":26},{"key":24,"text":209,"correct":22},{"key":28,"text":211,"correct":26},{"key":31,"text":213,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},1253764,"当参加验收各方对工程质量验收意见不一致时（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":26},"以监理单位意见为准",{"key":24,"text":526,"correct":22},"可请当地建设行政主管部门或工程质量监督机构协调处理",{"key":28,"text":528,"correct":26},"建设单位意见为准",{"key":31,"text":530,"correct":26},"法院仲裁",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1253765,"自制吊杆的规格应符合设计要求，采用螺纹连接时，拧入连接螺母的螺纹长度应（ ）吊杆直径，并有防松措施。",[535,537,539,541],{"key":20,"text":536,"correct":26},"小于",{"key":24,"text":538,"correct":22},"大于",{"key":28,"text":540,"correct":26},"等于",{"key":31,"text":542,"correct":26},"不大于",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},1253766,"由操作人员对自己的施工作业或已完成的分部分项工程进行自我检验，自我把关，及时消除缺陷，以防止不合格品进人下道作业的质量检查形式是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"自检",{"key":24,"text":550,"correct":26},"互检",{"key":28,"text":552,"correct":26},"专检",{"key":31,"text":554,"correct":26},"交接检",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},1253767,"施工技术交底的内容主要包括（ ）两个主要方面。",[559,561,563,565],{"key":20,"text":560,"correct":22},"技术和安全",{"key":24,"text":562,"correct":26},"技术和经济",{"key":28,"text":564,"correct":26},"经济和安全",{"key":31,"text":566,"correct":26},"技术和重要",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1253768,"案例一某公司承建的大型体育场环形地沟内冷却水循环管网，管径外径达630mm，管道除与设备法兰连接外，管与管、管与配件的连接均为沟槽式连接，应属于柔性连接。由于该公司大口径柔性连接钢管的技术尚属于初次应用，尤其对其试压会产生的弹性变形和复位情况所知不多，为此项目部编制了作业指导书，按作业指导书要求做了模拟试验，对试压用档墩和稳定支架的布置位置作出了修正，并设置了集水坑、配备潜水泵。试压作业前，项目部技术负责人组织了高层次的技术交底，要求施工员、作业队组长各司其职，实行监护，确保作业人员正确操作，增强安全防范意识。由于整个过程组织合理、方法可靠、对风险有预防，所以试压工作顺利完成，并未发生事故。案例二A各司承建的某住宅小区机电安装工程，住宅楼的生活供水管道最终要经消毒合格后才能交付使用，其基本方法是以溶解氯的高浓度消毒水注入管网中，侵泡至规定时间，经取样检验化验菌落数符合标准规定而判定合格，则消毒工作完成，管网排放消毒水，经冲洗后和后交付用户使用。按这样的消毒流程，项目部技术负责人编制了技术交底文件进行交底，并顺利实施按期完工。1.案例一该公司技术交底考虑的内容体现了（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"技术性内容和安全防范性内容",{"key":24,"text":574,"correct":26},"经济性内容和安全防范性内容",{"key":28,"text":576,"correct":26},"技术性内容和经济防范性内容",{"key":31,"text":578,"correct":26},"重要性内容和安全防范性内容",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1253769,"由吊杆支架悬吊安装的风管，每直线段均应设刚性的（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":26},"固定支架",{"key":24,"text":586,"correct":26},"矩形支架",{"key":28,"text":588,"correct":22},"防晃支架",{"key":31,"text":590,"correct":26},"单脚支架",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]