[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":536},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,5,50,1361,[13,34,46,58,70,82,94,102,114,122,130,142,154,166,178,190,198,206,218,230,242,250,262,270,278,290,300,308,316,324,332,340,352,360,372,380,392,404,412,420,428,436,444,452,464,476,488,500,512,524],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1253619,1,"单选题","甲公司中标一高级写字楼机电工程，内容含给水排水工程、通风与空调工程、电气工程等多个专业分部工程，由于工程量大、工期紧，需要编制施工进度网络计划，充分利用公司资源，进行严密组织施工，才能满足工期需要。根据背景资料，回答下列问题。 下列（ ）不是甲公司编制施工总进度网络计划的依据。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","合同工期的承诺",false,{"key":24,"text":25,"correct":22},"B","业主的项目建设计划",{"key":27,"text":28,"correct":22},"C","公司生产要素",{"key":30,"text":31,"correct":32},"D","监理单位实力",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1253620,"施工企业内部通过奖励或惩罚经济手段进行施工项目的进度控制方法属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"行政方法",{"key":24,"text":41,"correct":32},"经济方法",{"key":27,"text":43,"correct":22},"管理技术方法",{"key":30,"text":45,"correct":22},"其他方法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1253621,"风管制作、风管安装分两个班组施工，责任明确，制作和安装同步进行，这种施工组织属于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"依次施工",{"key":24,"text":53,"correct":22},"平行施工",{"key":27,"text":55,"correct":32},"流水施工",{"key":30,"text":57,"correct":22},"不清楚",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1253622,"案例一这种影响进度计划实施的因素主要是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"供应商违约，违背采购合同对产品供应质量的约定",{"key":24,"text":65,"correct":22},"施工方造成的问题",{"key":27,"text":67,"correct":22},"自然因素导致施工延迟",{"key":30,"text":69,"correct":22},"供应商与施工方没有商议好",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1253623,"（ ）是编制同期的各种生产资源需要量计划的重要依据。",[74,76,78,80],{"key":20,"text":75,"correct":32},"编制好的施工进度计划",{"key":24,"text":77,"correct":22},"施工过程的各项措施",{"key":27,"text":79,"correct":22},"施工进度的控制",{"key":30,"text":81,"correct":22},"施工进度计划的编制、实施和控制",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1253624,"调度分为（ ）两类。",[86,88,90,92],{"key":20,"text":87,"correct":22},"正常调度和快速调度",{"key":24,"text":89,"correct":22},"不正常调度和应急调度",{"key":27,"text":91,"correct":32},"正常调度和应急调度",{"key":30,"text":93,"correct":22},"不正常调度和快速调度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1253625,"把施工对象划分成若干施工段，每个施工过程的专业队（组）依次连续地在每个施工段上进行作业，当前一个专业队（组）完成一个施工段的作业之后，就为下一个施工过程提供了作业面，不同的施工过程，按照工程对象的施工工艺要求，先后相继投人施工，使各专业队（组）在不同的空间范围内可以互不干扰地同时进行不同的工作的一种施工组织方式是（ ）。",[98,99,100,101],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":30,"analysis":33},1253626,"应急调度的目的是（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"发现进度计划执行发生偏差先兆或已发生偏差，采用对生产资源分配进行调整",{"key":24,"text":109,"correct":22},"进入单位工程的生产资源是按进度计划供给的",{"key":27,"text":111,"correct":22},"按预期方案将资源在各专业间合理分配",{"key":30,"text":113,"correct":32},"消除进度偏差",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":20,"analysis":33},1253627,"能够直接、迅速和有效，但要注意其科学性，防止武断、主观和片面控制项目进度的方法属于（ ）。",[118,119,120,121],{"key":20,"text":39,"correct":32},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":27,"analysis":33},1253628,"能够充分合理地利用工作面争取时间，减少或避免工人停工、窝工，属于（ ）。",[126,127,128,129],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1253629,"依据供货合同的要求控制供货进度是（ ）进度控制的任务。",[134,136,138,140],{"key":20,"text":135,"correct":22},"业主方",{"key":24,"text":137,"correct":22},"设计方",{"key":27,"text":139,"correct":22},"施工方",{"key":30,"text":141,"correct":32},"供货方",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1253630,"应急调度是指（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"进人单位工程的生产资源是按进度计划供给的",{"key":24,"text":149,"correct":32},"发现进度计划执行发生偏差先兆或已发生偏差，采用对生产资源分配进行调整，目的是消除进度偏差",{"key":27,"text":151,"correct":22},"检查计划执行效果的主要手段，可以发现进度有无偏差及偏差程度的大小",{"key":30,"text":153,"correct":22},"可以进一步协调各专业间的衔接关系，掌握工作面的状况和安全技术措施的落实程度，为下一轮计划的编制做好准备",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1253631,"在调整施工进度计划时，采用实行包干激励，提高奖励金额；对所采取的技术措施给予相应的经济补偿是属于（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"组织措施",{"key":24,"text":161,"correct":22},"技术措施",{"key":27,"text":163,"correct":32},"经济措施",{"key":30,"text":165,"correct":22},"其他配套措施",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1253632,"在不影响紧后工作最早开始时间的条件下，允许延误的最长时间是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"总时差",{"key":24,"text":173,"correct":32},"自由时差",{"key":27,"text":175,"correct":22},"最晚开始时间",{"key":30,"text":177,"correct":22},"最晚结束时间",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1253633,"进度是指（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"某项工作进行的速度",{"key":24,"text":185,"correct":22},"工程施工进行的速度",{"key":27,"text":187,"correct":22},"根据已批准的建设文件或签订的承发包合同，将工程项目的建设进度作出周密的安排，是把预期施工完成的工作按时间坐标序列表达出来的书面文件",{"key":30,"text":189,"correct":22},"工程从开工至竣工所经历的时间",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1253634,"依据设计任务委托合同对设计工作进度的要求控制设计工作进度是（ ）进度控制的任务。",[194,195,196,197],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":32},{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},1253635,"控制整个项目实施阶段的进度，包括控制设计准备阶段的工作进度、设计工作进度、施工进度、物资采购工作进度，以及项目动用前准备阶段的工作进度是（ ）进度控制的任务。",[202,203,204,205],{"key":20,"text":135,"correct":32},{"key":24,"text":137,"correct":22},{"key":27,"text":139,"correct":22},{"key":30,"text":141,"correct":22},{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},1253636,"计算工期指（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"在平均建设管理水平、施工工艺和机械装备水平及正常的建设条件（自然的、社会经济的）下，工程从开工到竣工所经历的时间",{"key":24,"text":213,"correct":32},"根据项目方案具体的工艺、组织和管理等方面情况，排定网络计划后，根据网络计划所计算出的工期",{"key":27,"text":215,"correct":22},"指业主与承包商签订的合同中确定的承包商完成所承包项目的工期，也即业主对项目工期的期望",{"key":30,"text":217,"correct":22},"指工程从开工至竣工所经历的时间",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":27,"analysis":33},1253637,"下列有关进度计划的作用说法错误的是（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"施工总进度计划描述的对象是单位工程的开、竣工时间，是对整个项目工期目标实行宏观控制，因而计划的时间坐标是年、季、月为主，属于控制性计划",{"key":24,"text":225,"correct":22},"单位工程进度计划编制的工期目标应符合施工总进度计划时间节点的安排，仅在总进度计划作出调整后，新开工的单位工程进度计划才能与原总进度计划的安排有差异，这是计划安排严肃性的体现",{"key":27,"text":227,"correct":32},"房屋建筑安装工程的单位工程施工进度计划应表达部分专业（分部）的施工内容，是编制该工程各专业的施工作业计划的依据",{"key":30,"text":229,"correct":22},"实施性的计划编制时对生产资源情况、作业条件状况、作业环境分析等均做了充分的了解，因而计划的实施具有较强的可操作性",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":30,"analysis":33},1253638,"建筑市场状况、国家财政经济形势、建设管理体制和当地施工条件（气象、水文、地形、地质、交通和建筑材料供应）等影响进度管理的因素属于（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"业主",{"key":24,"text":237,"correct":22},"勘察设计单位",{"key":27,"text":239,"correct":22},"承包人",{"key":30,"text":241,"correct":32},"建设环境",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},1253639,"施工进度目标的确定，施工组织设计编制、投人的人力及施工设备的规模、施工管理水平等影响进度管理的因素属于（ ）。",[246,247,248,249],{"key":20,"text":235,"correct":22},{"key":24,"text":237,"correct":22},{"key":27,"text":239,"correct":32},{"key":30,"text":241,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1253640,"总时差是指（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":32},"在不影响总工期的条件下，可以延误的最长时间",{"key":24,"text":257,"correct":22},"在不影响紧后工作最早开始时间的条件下，允许延误的最长时间",{"key":27,"text":259,"correct":22},"完成全部工作的时间",{"key":30,"text":261,"correct":22},"完成工作时间",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1253641,"勘察设计目标的确定、可投人的力量及其工作效率、各专业设计的配合，以及业主和设计单位的配合等影响进度管理的因素属于（ ）。",[266,267,268,269],{"key":20,"text":235,"correct":22},{"key":24,"text":237,"correct":32},{"key":27,"text":239,"correct":22},{"key":30,"text":241,"correct":22},{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1253642,"所有施工对象的各施工段同时开工、同时完工的一种施工组织方式是（ ）。",[274,275,276,277],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":32},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":22},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1253643,"平行施工的缺点是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"由于同一工种工人无法连续施工造成窝工，从而使得施工工期较长",{"key":24,"text":285,"correct":32},"由于工作面拥挤，同时投人的人力、物力过多而造成组织困难和资源浪费",{"key":27,"text":287,"correct":22},"一种工人要对多个工序施工，使得熟练程度较低",{"key":30,"text":289,"correct":22},"容易在施工中遗漏某道工序",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1253644,"甲公司中标一高级写字楼机电工程，内容含给水排水工程、通风与空调工程、电气工程等多个专业分部工程，由于工程量大、工期紧，需要编制施工进度网络计划，充分利用公司资源，进行严密组织施工，才能满足工期需要。根据背景资料，回答下列问题。 工程进度管理是一个动态过程，影响因素多、风险大，应认真分析和预测，采取合理措施，在动态管理中实现进度目标。下列不是影响工程进度管理的主要因素有（ ）。",[294,295,296,298],{"key":20,"text":235,"correct":22},{"key":24,"text":237,"correct":22},{"key":27,"text":297,"correct":32},"住建局",{"key":30,"text":299,"correct":22},"施工单位",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1253645,"将拟建工程项目的整个建造过程分解成若干个施工过程，然后按照一定的施工顺序，各施工过程或施工段依次开工、依次完成的一种施工组织方式是（ ）。",[304,305,306,307],{"key":20,"text":51,"correct":32},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":22},{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1253646,"正常调度是指（ ）。",[312,313,314,315],{"key":20,"text":147,"correct":32},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":22},{"key":30,"text":153,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1253647,"依次施工的缺点是（ ）。",[320,321,322,323],{"key":20,"text":283,"correct":32},{"key":24,"text":285,"correct":22},{"key":27,"text":287,"correct":22},{"key":30,"text":289,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},1253648,"在调整施工进度计划时，采用改进施工工艺和施工技术，缩短工艺技术间歇时间；采用更先进的施工方法，加快施工进度；用更先进的施工机械是属于（ ）。",[328,329,330,331],{"key":20,"text":159,"correct":22},{"key":24,"text":161,"correct":32},{"key":27,"text":163,"correct":22},{"key":30,"text":165,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1253649,"合同工期指（ ）。",[336,337,338,339],{"key":20,"text":211,"correct":22},{"key":24,"text":213,"correct":22},{"key":27,"text":215,"correct":32},{"key":30,"text":217,"correct":22},{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1253650,"案例一发生进度偏差的主要因素是（ ）。",[344,346,348,350],{"key":20,"text":345,"correct":32},"在项目内部，属于项目管理不当",{"key":24,"text":347,"correct":22},"作业队长不熟悉工艺要求造成的",{"key":27,"text":349,"correct":22},"项目外部的影响因素",{"key":30,"text":351,"correct":22},"供货商供货质量发生差异",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1253651,"施工进度计划是指（ ）。",[356,357,358,359],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":27,"text":187,"correct":32},{"key":30,"text":189,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},1253652,"施工进度计划确定后，是（ ）的依据。",[364,366,368,370],{"key":20,"text":365,"correct":22},"施工进度计划实施",{"key":24,"text":367,"correct":32},"编制生产资源供给计划",{"key":27,"text":369,"correct":22},"资源供给计划实施",{"key":30,"text":371,"correct":22},"编制资源管理计划",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},1253653,"施工进度是指（ ）。",[376,377,378,379],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":32},{"key":27,"text":187,"correct":22},{"key":30,"text":189,"correct":22},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":30,"analysis":33},1253654,"下列有关施工进度计划与资源供给计划的关系叙述错误的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"施工进度计划编制前，必须对生产资源供给的状况和能力进行调查，做出评估，否则施工进度计划的实施有着一定的风险",{"key":24,"text":387,"correct":22},"施工进度计划确定后，是编制生产资源供给计划的依据，该计划的执行是施工进度计划实施的物质保证",{"key":27,"text":389,"correct":22},"施工进度计划的编制实行弹性原则，即计划要留有余地，使之有调整的可能",{"key":30,"text":391,"correct":32},"资源供给计划的编制好后，一般不宜调整",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},1253655,"不属于影响进度控制的有（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"动态控制原理",{"key":24,"text":399,"correct":22},"循环原理",{"key":27,"text":401,"correct":32},"静态控制原理",{"key":30,"text":403,"correct":22},"弹性原理",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1253656,"在不影响总工期的条件下可以延误的最长时间是（ ）。",[408,409,410,411],{"key":20,"text":171,"correct":32},{"key":24,"text":173,"correct":22},{"key":27,"text":175,"correct":22},{"key":30,"text":177,"correct":22},{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},1253657,"正常调度的作用是（ ）。",[416,417,418,419],{"key":20,"text":107,"correct":22},{"key":24,"text":109,"correct":22},{"key":27,"text":111,"correct":32},{"key":30,"text":113,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},1253658,"进度统计是（ ）。",[424,425,426,427],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":32},{"key":30,"text":153,"correct":22},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1253659,"施工进度计划的执行是（ ）的物质保证。",[432,433,434,435],{"key":20,"text":365,"correct":32},{"key":24,"text":367,"correct":22},{"key":27,"text":369,"correct":22},{"key":30,"text":371,"correct":22},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1253660,"定额工期指（ ）。",[440,441,442,443],{"key":20,"text":211,"correct":32},{"key":24,"text":213,"correct":22},{"key":27,"text":215,"correct":22},{"key":30,"text":217,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1253661,"业主提出的建设工期目标的合理性、在资金及材料等方面的供应进度、业主各项准备工作的进度和业主项目管理的有效性等影响进度管理的因素属于（ ）。",[448,449,450,451],{"key":20,"text":235,"correct":32},{"key":24,"text":237,"correct":22},{"key":27,"text":239,"correct":22},{"key":30,"text":241,"correct":22},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1253662,"不属于属于ISO\u002FTC176整理并编撰八项质量管理原则（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"持续改进",{"key":24,"text":459,"correct":32},"贯彻科学、公正、守法的职业规范",{"key":27,"text":461,"correct":22},"基于事实的决策方法",{"key":30,"text":463,"correct":22},"与供方互利的关系",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1253663,"停止点的概念：所有的（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"开工点、检查点、停止点等“点”的称谓",{"key":24,"text":471,"correct":32},"控制点、检查点、停止点等“点”的称谓",{"key":27,"text":473,"correct":22},"控制点、检查点、结束点等“点”的称谓",{"key":30,"text":475,"correct":22},"控制点、审核点、停止点等“点”的称谓",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1253664,"安装工程与（ ）要相符。",[480,482,484,486],{"key":20,"text":481,"correct":22},"有机联系",{"key":24,"text":483,"correct":32},"土建工程之间的交叉配合",{"key":27,"text":485,"correct":22},"目录",{"key":30,"text":487,"correct":22},"分包之间的记录",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1253665,"交底时技术方面包括（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"要在竖井每个门口设警戒标志，提醒安全作业不要跌入井道内",{"key":24,"text":495,"correct":32},"每根电缆的走向、规格，按测绘长度的同规格拼盘方式和部位",{"key":27,"text":497,"correct":22},"电缆竖井内作业要防止高空坠物",{"key":30,"text":499,"correct":22},"在电缆竖井未作隔堵前敷设电缆",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1253666,"点型火灾探测器安装的基本规定是，探测器至空调送风口边的水平距离不应小于（ ）m。",[504,506,508,510],{"key":20,"text":505,"correct":32},"1.5",{"key":24,"text":507,"correct":22},"1.2",{"key":27,"text":509,"correct":22},"1",{"key":30,"text":511,"correct":22},"0.5",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":30,"analysis":33},1253667,"质量保证是指（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"致力于制定质量目标并规定必要的运行工程和相关资源以实现质量目标",{"key":24,"text":519,"correct":22},"致力于增强满足质量要求的能力",{"key":27,"text":521,"correct":22},"致力于满足质量要求",{"key":30,"text":523,"correct":32},"致力于提供质量要求会得到满足的信任",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1253668,"摄像机固定用（ ）要大小适配，数量符合要求，要隐蔽的摄像机可设置在顶棚或嵌入壁内。",[528,530,532,534],{"key":20,"text":529,"correct":32},"安装紧固件",{"key":24,"text":531,"correct":22},"安装套筒",{"key":27,"text":533,"correct":22},"安装锁钉",{"key":30,"text":535,"correct":22},"安装固定件",[537,540,543,546,549,552],{"id":15,"name":538,"category":7,"favorite":539},"领导干部任职前廉政法规知识测试题",92,{"id":541,"name":542,"category":7,"favorite":15},595,"建筑结构与设备",{"id":544,"name":545,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":547,"name":548,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":550,"name":551,"category":7,"favorite":8},534,"BIM工程师",{"id":553,"name":551,"category":7,"favorite":8},535]