[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,4,50,1361,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,225,233,245,253,262,274,286,298,310,322,330,339,347,359,371,383,395,407,415,423,434,446,454,466,478,490,502,514,526,538,550,562,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1253569,1,"单选题","对施工方案的比较：对一个具体对象编制的施工方案不应少于（ ）个，以便遴选和优化。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2",true,{"key":24,"text":25,"correct":26},"B","3",false,{"key":28,"text":29,"correct":26},"C","4",{"key":31,"text":32,"correct":26},"D","5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1253570,"重点、难点分部不（方向）工程和专项工程施工方案由施工单位技术部门组织有关专家评审，（ ）批准。",[38,40,42,44],{"key":20,"text":39,"correct":26},"施工单位负责人",{"key":24,"text":41,"correct":22},"施工单位技术负责人",{"key":28,"text":43,"correct":26},"项目负责人",{"key":31,"text":45,"correct":26},"项目技术负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1253571,"对施工方案的比较的方法是从（ ）两方面进行。",[50,52,54,56],{"key":20,"text":51,"correct":22},"技术和经济",{"key":24,"text":53,"correct":26},"重要和经济",{"key":28,"text":55,"correct":26},"技术和重要",{"key":31,"text":57,"correct":26},"方案和经济",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1253572,"喷洒管道不同管径连接不宜采用（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"补心",{"key":24,"text":65,"correct":26},"异径管箍",{"key":28,"text":67,"correct":26},"异径弯头",{"key":31,"text":69,"correct":26},"异径三通",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1253573,"消火栓安装，栓口应朝外，并不应安装在门轴侧，栓口中心距地面为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"1.0m",{"key":24,"text":77,"correct":22},"1.1m",{"key":28,"text":79,"correct":26},"1.2m",{"key":31,"text":81,"correct":26},"1.3m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1253574,"施工方案比较，经济合理性比较包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"安全可靠程度",{"key":24,"text":89,"correct":26},"资源节约",{"key":28,"text":91,"correct":26},"降低污染",{"key":31,"text":93,"correct":22},"对工程进度影响",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1253575,"给水立管管卡安装，立管的固定范围在距地面（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"1.0~1.2",{"key":24,"text":101,"correct":26},"1.2~1.5",{"key":28,"text":103,"correct":22},"1.5~1.8",{"key":31,"text":105,"correct":26},"1.8~2.0",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1253576,"施工机械的（ ），指的是机械在具体施工条件下连续工作的生产率，考虑了工作对象的性质和状态以及机械能力发挥的程度等因素。",[110,112,114,116],{"key":20,"text":111,"correct":26},"理论生产率",{"key":24,"text":113,"correct":22},"技术生产率",{"key":28,"text":115,"correct":26},"实际生产率",{"key":31,"text":117,"correct":26},"计算生产率",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1253577,"目前我国企业职工伤亡事故分类标准规定共有（ ）种。",[122,124,126,128],{"key":20,"text":123,"correct":22},"20",{"key":24,"text":125,"correct":26},"31",{"key":28,"text":127,"correct":26},"25",{"key":31,"text":129,"correct":26},"21",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1253578,"对特殊作业人员管理的基本要求：离开特殊作业一定期限时间一般为（ ）者，必须重新考试合格，方可上岗。",[134,136,138,140],{"key":20,"text":135,"correct":22},"六个月以上",{"key":24,"text":137,"correct":26},"七个月以上",{"key":28,"text":139,"correct":26},"十二个月以上",{"key":31,"text":141,"correct":26},"九月以上",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1253579,"施工机械的（ ）常以机械装置的外形尺寸、作用力（功率）和工作速度来表示。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工作容量",{"key":24,"text":149,"correct":26},"生产率",{"key":28,"text":151,"correct":26},"动力",{"key":31,"text":153,"correct":26},"工作性能参数",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1253580,"施工方案比较，重要性比较包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"技术效率",{"key":24,"text":161,"correct":26},"创新程度",{"key":28,"text":163,"correct":22},"推广应用价值",{"key":31,"text":165,"correct":26},"投资额度",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1253581,"风管与法兰连接采用铆接或焊接连接，风管的法兰焊缝符合要求并具有互换性，高压系统矩形风管法兰铆钉间距小于等于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"80mm",{"key":24,"text":173,"correct":22},"100mm",{"key":28,"text":175,"correct":26},"120mm",{"key":31,"text":177,"correct":26},"150mm",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1253582,"施工方案比较的方法为（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"定性和定量",{"key":24,"text":185,"correct":26},"解析和分析",{"key":28,"text":187,"correct":26},"次要和重要",{"key":31,"text":51,"correct":26},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},1253583,"当灯具距地面高度小于（ ）时，灯具的可接近裸露导体必须接地（P E）或接零（PEN）可靠，并应有专用接地螺栓，且有标识。",[193,195,197,199],{"key":20,"text":194,"correct":26},"1.8m",{"key":24,"text":196,"correct":26},"2.0m",{"key":28,"text":198,"correct":22},"2.4mm",{"key":31,"text":200,"correct":26},"3.0m",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1253584,"施工方案比较，定性分析（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"要工程施工技术",{"key":24,"text":208,"correct":26},"要大量的数据积累",{"key":28,"text":210,"correct":22},"有较多的经验积累",{"key":31,"text":212,"correct":26},"要高技术的施工员",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},1253585,"特种设备安全监察条例明确的特种设备作业人员是指（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"起重工",{"key":24,"text":220,"correct":26},"电工",{"key":28,"text":222,"correct":22},"探伤工",{"key":31,"text":224,"correct":26},"场内车辆运输工",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1253586,"施工机械的（ ），指的是机械在具体施工条件下，考虑了施工组织及生产时间的损失等因素后的生产率。",[229,230,231,232],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":26},{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},1253587,"通风与空调工程中，不属于金属风管制作施工顺序的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"板材加工",{"key":24,"text":240,"correct":26},"型材加工",{"key":28,"text":242,"correct":26},"组合（组成风管）",{"key":31,"text":244,"correct":22},"安装",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1253588,"风管与法兰连接采用铆接或焊接连接，风管的法兰焊缝符合要求并具有互换性，中低压系统矩形风管法兰铆钉间距小于等于（ ）。",[249,250,251,252],{"key":20,"text":171,"correct":26},{"key":24,"text":173,"correct":26},{"key":28,"text":175,"correct":26},{"key":31,"text":177,"correct":22},{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":28,"analysis":33},1253589,"水流指示器应水平立装，水流指示器前后应保持有（ ）倍安装管径长度的支管段，安装时注意水流方向与指示器的箭头一致。",[257,258,259,260],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":32,"correct":22},{"key":31,"text":261,"correct":26},"10",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1253590,"防排烟系统防火风管的板材厚度按（ ）的规定选用。",[266,268,270,272],{"key":20,"text":267,"correct":26},"低压系统",{"key":24,"text":269,"correct":26},"中压系统",{"key":28,"text":271,"correct":22},"高压系统",{"key":31,"text":273,"correct":26},"超高压系统",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1253591,"进人落地式柜、台、箱、盘内的导管管口，应高出柜、台、箱、盘的基础面（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"10~30mm",{"key":24,"text":281,"correct":26},"30~50mm",{"key":28,"text":283,"correct":22},"50~80mm",{"key":31,"text":285,"correct":26},"80~100mm",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1253592,"下列风管材质中，不属于复合风管的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"玻璃纤维复合板风管",{"key":24,"text":293,"correct":26},"聚氨酯铝箔",{"key":28,"text":295,"correct":26},"酚醛铝箔",{"key":31,"text":297,"correct":22},"玻镁复合风管",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1253593,"建筑电气工程中，无论何种情况，防雷接地的（ ）要排在最末端。",[302,304,306,308],{"key":20,"text":303,"correct":26},"接地干线敷设",{"key":24,"text":305,"correct":26},"引下线敷设",{"key":28,"text":307,"correct":22},"接闪器安装",{"key":31,"text":309,"correct":26},"接地极埋设",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1253594,"案例一A公司接到B公司的施工总进度计划后，应策划价值设备安装施工接到计划：第三阶段是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"与土建工程施工全面配合阶段",{"key":24,"text":317,"correct":26},"全面安装的高峰阶段",{"key":28,"text":319,"correct":22},"安装工程由高峰转入收尾，全面进行试运转阶段",{"key":31,"text":321,"correct":26},"安装工程结束阶段",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1253595,"施工方案比较通常用（ ）两个方面进行分析。",[326,327,328,329],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":57,"correct":26},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},1253596,"施工方案比较，技术先进性比较包括（ ）。",[334,335,337,338],{"key":20,"text":165,"correct":26},{"key":24,"text":336,"correct":26},"对环境影响程度",{"key":28,"text":93,"correct":26},{"key":31,"text":161,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},1253597,"报警阀应设在明显、易于操作的位置，距地高度（ ）左右为宜。",[343,344,345,346],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":26},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":26},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},1253598,"安装工程资源管理的特殊点主要表现在人力资源方面有（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"特殊作业人员和特种设备作业两类人员的专门管理规定",{"key":24,"text":354,"correct":26},"要注意强制认证的成品使用管理和特殊场所使用的管理",{"key":28,"text":356,"correct":26},"消防专有成品的管理",{"key":31,"text":358,"correct":26},"注意起重机械和压力容器的使用管理",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1253599,"甲公司总承包某超高层五星级酒店工程，并将其中的机电安装工程分包给乙公司完成，其电力供应的干线为电力电缆，电力电缆从地下一层的变配电室经电缆沟通至多个电缆竖井，再经电缆竖井至各层的分配电箱，电缆数量大、规格多、路径曲折，部分电缆出竖井后经导管或桥架到用电点，为此项目部制定编写了电缆敷设专项方案用于施工，保证了电缆敷设的顺利进行。根据背景资料，回答下列问题。 下列有关电缆敷设的说法错误的是（ ）",[363,365,367,369],{"key":20,"text":364,"correct":22},"有条件的最好自下而上敷设",{"key":24,"text":366,"correct":26},"敷设时，同截面电缆应先敷设低层，后敷设高层，要特别注意，在电缆轴附近和部分楼层应采取防滑措施",{"key":28,"text":368,"correct":26},"电缆敷设严禁有绞拧、铠装压扁、护层断裂和表面严重划伤等缺损",{"key":31,"text":370,"correct":26},"电缆敷设时，应敷设一根立即整理一根、卡固一根",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":28,"analysis":33},1253600,"施工方案以（ ）为主要对象编制的施工技术和组织方案，用以（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":26},"若干单位工程组成的群体工程或特大型工程项目；整个项目的施工过程起到统筹规划、重点控制的作用",{"key":24,"text":378,"correct":26},"单位工程；单位工程的施工工程起指导和制约作用",{"key":28,"text":380,"correct":22},"分部工程或专项工程；具体指导其施工工程",{"key":31,"text":382,"correct":26},"专项工程；单位工程的施工工程起指导和制约作用",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":28,"analysis":33},1253601,"下列有关插座的安装，说法错误的是（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":26},"A.单相三孔及四孔的接地线或接零线均应在上方，面对三孔插座，左边接零线，右边接相线；面对四孔插座，左孔接Ll、下孔接L2、右孔接L30",{"key":24,"text":390,"correct":26},"插座的接地线单独敷设，不允许与工作零线混用",{"key":28,"text":392,"correct":22},"接地（P或接零（PEN）线在插座间可串联连接",{"key":31,"text":394,"correct":26},"同一场所的三相插座，接线的相序一致。",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1253602,"下列风管材质中，不属于金属风管的是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":26},"普通钢板",{"key":24,"text":402,"correct":26},"铝板",{"key":28,"text":404,"correct":26},"不锈钢板",{"key":31,"text":406,"correct":22},"玻璃钢",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1253603,"案例一A公司接到B公司的施工总进度计划后，应策划价值设备安装施工接到计划：第一阶段是（ ）。",[411,412,413,414],{"key":20,"text":315,"correct":22},{"key":24,"text":317,"correct":26},{"key":28,"text":319,"correct":26},{"key":31,"text":321,"correct":26},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},1253604,"风管按其工作压力（P）可划分，系统工作压力500Pa",[419,420,421,422],{"key":20,"text":267,"correct":26},{"key":24,"text":269,"correct":22},{"key":28,"text":271,"correct":26},{"key":31,"text":273,"correct":26},{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1253605,"消防干管用卡箍沟槽连接，每根配管长度不宜超过（ ）。",[427,428,430,432],{"key":20,"text":200,"correct":26},{"key":24,"text":429,"correct":22},"6.0m",{"key":28,"text":431,"correct":26},"9.0m",{"key":31,"text":433,"correct":26},"10m",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1253606,"在调整施工进度计划时，采用增加工作面，组织更多的施工队伍；增加每天的施工时间；增加劳动力和施工机械的数量是属于（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"组织措施",{"key":24,"text":441,"correct":26},"技术措施",{"key":28,"text":443,"correct":26},"经济措施",{"key":31,"text":445,"correct":26},"其他配套措施",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},1253607,"在调整施工进度计划时，采用改善外部配合条件，改善劳动条件，实施强有力的调度等是属于（ ）。",[450,451,452,453],{"key":20,"text":439,"correct":26},{"key":24,"text":441,"correct":26},{"key":28,"text":443,"correct":22},{"key":31,"text":445,"correct":26},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1253608,"计划检查可以（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"进人单位工程的生产资源是按进度计划供给的",{"key":24,"text":461,"correct":26},"发现进度计划执行发生偏差先兆或已发生偏差，采用对生产资源分配进行调整，目的是消除进度偏差",{"key":28,"text":463,"correct":26},"检查计划执行效果的主要手段，可以发现进度有无偏差及偏差程度的大小",{"key":31,"text":465,"correct":22},"可以进一步协调各专业间的衔接关系，掌握工作面的状况和安全技术措施的落实程度，为下一轮计划的编制做好准备",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1253609,"工程工期是指（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":26},"某项工作进行的速度",{"key":24,"text":473,"correct":26},"工程施工进行的速度",{"key":28,"text":475,"correct":26},"根据已批准的建设文件或签订的承发包合同，将工程项目的建设进度作出周密的安排，是把预期施工完成的工作按时间坐标序列表达出来的书面文件",{"key":31,"text":477,"correct":22},"工程从开工至竣工所经历的时间",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},1253610,"通过流水作业方法、科学排序方法、网络计划方法、滚动计划方法和电子计算机辅助进度管理等控制项目进度的方法属于（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"行政方法",{"key":24,"text":485,"correct":26},"经济方法",{"key":28,"text":487,"correct":22},"管理技术方法",{"key":31,"text":489,"correct":26},"其他方法",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},1253611,"进度计划调整的方法不包括（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":26},"改变作业组织形式",{"key":24,"text":497,"correct":26},"在不违反工艺规律的情况下改变专业或工序衔接关系",{"key":28,"text":499,"correct":26},"修正施工方案",{"key":31,"text":501,"correct":22},"各专业分包单位不能如期履行分包合同",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1253612,"依据施工任务委托合同对施工进度的要求控制施工进度是（ ）进度控制的任务。",[506,508,510,512],{"key":20,"text":507,"correct":26},"业主方",{"key":24,"text":509,"correct":26},"设计方",{"key":28,"text":511,"correct":22},"施工方",{"key":31,"text":513,"correct":26},"供货方",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1253613,"（ ）在施工活动的全部管理工作中属于首位的。",[518,520,522,524],{"key":20,"text":519,"correct":26},"编制好的施工进度计划",{"key":24,"text":521,"correct":26},"施工过程的各项措施",{"key":28,"text":523,"correct":26},"施工进度的控制",{"key":31,"text":525,"correct":22},"施工进度计划的编制、实施和控制",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1253614,"自由时差是指（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"在不影响总工期的条件下，可以延误的最长时间",{"key":24,"text":533,"correct":22},"在不影响紧后工作最早开始时间的条件下，允许延误的最长时间",{"key":28,"text":535,"correct":26},"完成全部工作的时间",{"key":31,"text":537,"correct":26},"完成工作时间",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1253615,"施工作业进度计划是对单位工程进度计划目标分解后的计划，可按（ ）为单元进行编制。",[542,544,546,548],{"key":20,"text":543,"correct":26},"单位工程",{"key":24,"text":545,"correct":22},"分项工程或工序",{"key":28,"text":547,"correct":26},"主项工程",{"key":31,"text":549,"correct":26},"分部工程",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1253616,"工程工期指（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"在平均建设管理水平、施工工艺和机械装备水平及正常的建设条件（自然的、社会经济的）下，工程从开工到竣工所经历的时间",{"key":24,"text":557,"correct":26},"根据项目方案具体的工艺、组织和管理等方面情况，排定网络计划后，根据网络计划所计算出的工期",{"key":28,"text":559,"correct":26},"指业主与承包商签订的合同中确定的承包商完成所承包项目的工期，也即业主对项目工期的期望",{"key":31,"text":561,"correct":22},"指工程从开工至竣工所经历的时间",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1253617,"甲公司中标一高级写字楼机电工程，内容含给水排水工程、通风与空调工程、电气工程等多个专业分部工程，由于工程量大、工期紧，需要编制施工进度网络计划，充分利用公司资源，进行严密组织施工，才能满足工期需要。根据背景资料，回答下列问题。 下列（ ）不是以工程项目的实施阶段划分施工进度计划的。",[566,568,570,572],{"key":20,"text":567,"correct":26},"设计进度计划",{"key":24,"text":569,"correct":26},"施工进度计划",{"key":28,"text":571,"correct":26},"物资设备供应计划",{"key":31,"text":573,"correct":22},"总进度计划",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1253618,"为保证进度计划顺利实施，企业将采取的（ ）同时作出说明，以求取得共识。",[578,580,582,584],{"key":20,"text":579,"correct":22},"经济措施和组织措施",{"key":24,"text":581,"correct":26},"技术措施和组织措施",{"key":28,"text":583,"correct":26},"经济措施和技术措施",{"key":31,"text":585,"correct":26},"管理措施和组织措施",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]