[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":572},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,3,50,1361,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,248,256,268,280,292,304,316,324,336,348,356,368,380,392,404,416,424,436,444,452,460,468,477,489,501,510,522,530,542,550,562],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1253519,1,"单选题","滑车的吊钩（或吊环）中心，应与起吊构件的重心在一条垂直线上，以免构件起吊后不平稳滑车组上下滑车之间的最小距离一般为（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","300~400mm",false,{"key":24,"text":25,"correct":22},"B","500~700mm",{"key":27,"text":28,"correct":29},"C","700~1200mm",true,{"key":31,"text":32,"correct":22},"D","1200~1500mm","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1253520,"施工方案由（ ）审批。",[38,40,42,44],{"key":20,"text":39,"correct":22},"企业负责人",{"key":24,"text":41,"correct":22},"企业技术负责人",{"key":27,"text":43,"correct":22},"项目负责人",{"key":31,"text":45,"correct":29},"项目技术负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1253521,"配电箱安装底口距地一般为（ ），同一建筑物内、同类配电箱安装高度应一致，允许偏差10mm。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1.2m",{"key":24,"text":53,"correct":29},"1.5m",{"key":27,"text":55,"correct":22},"1.8m",{"key":31,"text":57,"correct":22},"2.0m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1253522,"建筑物在施工期主要是“四口”要防止人体坠落的防护，不含有（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"楼梯口",{"key":24,"text":65,"correct":22},"电梯厅门口",{"key":27,"text":67,"correct":22},"预留洞口",{"key":31,"text":69,"correct":29},"窗口",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1253523,"开关箱与其控制的固定式用电设备的水平距离不宜超过（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2m",{"key":24,"text":77,"correct":29},"3m",{"key":27,"text":79,"correct":22},"4m",{"key":31,"text":81,"correct":22},"5m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1253524,"甲公司总承包某超高层五星级酒店工程，并将其中的机电安装工程分包给乙公司完成，其电力供应的干线为电力电缆，电力电缆从地下一层的变配电室经电缆沟通至多个电缆竖井，再经电缆竖井至各层的分配电箱，电缆数量大、规格多、路径曲折，部分电缆出竖井后经导管或桥架到用电点，为此项目部制定编写了电缆敷设专项方案用于施工，保证了电缆敷设的顺利进行。根据背景资料，回答下列问题。 下列有关电缆敷设专项施工方案的编制审查说法错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"电缆敷设专项施工方案由甲公司组织编制",{"key":24,"text":89,"correct":22},"电缆敷设专项施工方案由乙公司组织编制",{"key":27,"text":91,"correct":22},"电缆敷设专项施工方案由乙公司单位技术负责人或技术负责人授权的技术人员审批",{"key":31,"text":93,"correct":22},"电缆敷设专项施工方案由甲公司项目技术负责人核准备案",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1253525,"支架上钻孔不得用（ ），孔径不得大于固定螺栓直径2mm。",[98,100,102,104],{"key":20,"text":99,"correct":22},"台钻钻孔",{"key":24,"text":101,"correct":22},"手电钻钻孔",{"key":27,"text":103,"correct":29},"气焊割孔",{"key":31,"text":105,"correct":22},"液压冲孔",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1253526,"单位工程施工组织设计以（ ）为主要对象编制的施工组织设计，对（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"若干单位工程组成的群体工程或特大型工程项目；整个项目的施工过程起到统筹规划、重点控制的作用",{"key":24,"text":113,"correct":29},"单位工程；单位工程的施工工程起指导和制约作用",{"key":27,"text":115,"correct":22},"分部工程或专项工程；具体指导其施工工程",{"key":31,"text":117,"correct":22},"专项工程；单位工程的施工工程起指导和制约作用",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1253527,"桥架连接处应根据桥架规格选择（ ）以上的多股铜芯软线进行可靠的接地。",[122,124,126,128],{"key":20,"text":123,"correct":22},"2.5m㎡",{"key":24,"text":125,"correct":29},"4.0m㎡",{"key":27,"text":127,"correct":22},"6.0m㎡",{"key":31,"text":129,"correct":22},"10.0m㎡",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1253528,"工业建筑工程的施工区段划分以（ ）为主导。",[134,136,138,140],{"key":20,"text":135,"correct":22},"结构界限（温度缝、沉降缝和建筑单元等）",{"key":24,"text":137,"correct":22},"各施工段上所消耗的劳动量尽可能相近",{"key":27,"text":139,"correct":22},"各施工段面积尽可能相近",{"key":31,"text":141,"correct":29},"生产流程",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1253529,"以分部（分项）工程或专项工程为主要对象编制的施工技术与组织方案，用以具体指导其施工过程的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"技术交底",{"key":24,"text":149,"correct":29},"施工方案",{"key":27,"text":151,"correct":22},"单位工程施工组织设计",{"key":31,"text":153,"correct":22},"施工组织总设计",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1253530,"下列风管材质中，不属于非金属风管的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"玻璃纤维复合板风管",{"key":24,"text":161,"correct":22},"玻璃钢",{"key":27,"text":163,"correct":22},"聚氯乙烯",{"key":31,"text":165,"correct":22},"玻镁复合风管",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1253531,"风管按其工作压力（P）可划分，系统工作压力P",[170,172,174,176],{"key":20,"text":171,"correct":29},"低压系统",{"key":24,"text":173,"correct":22},"中压系统",{"key":27,"text":175,"correct":22},"高压系统",{"key":31,"text":177,"correct":22},"超高压系统",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1253532,"母线槽沿墙水平安装高度应符合设计要求，设计无要求时距地不应小于（ ），母线应可靠固定在支架上。",[182,183,184,186],{"key":20,"text":55,"correct":22},{"key":24,"text":57,"correct":22},{"key":27,"text":185,"correct":29},"2.2m",{"key":31,"text":187,"correct":22},"2.4m",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},1253533,"建筑物在施工期，楼梯口、电梯厅门口、楼梯边以及其他临边处均要设置临时护栏，且有可靠的强度，护栏高度不低于（ ）m。",[192,194,196,198],{"key":20,"text":193,"correct":29},"1.2",{"key":24,"text":195,"correct":22},"1.5",{"key":27,"text":197,"correct":22},"1",{"key":31,"text":199,"correct":22},"1.3",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1253534,"施工方案比较，定量分析（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"要工程施工技术",{"key":24,"text":207,"correct":29},"要大量的数据积累",{"key":27,"text":209,"correct":22},"有较多的经验积累",{"key":31,"text":211,"correct":22},"要高技术的施工员",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1253535,"施工方案比较采用比较的方面不包括（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"技术先进性",{"key":24,"text":219,"correct":22},"经济合理性",{"key":27,"text":221,"correct":22},"重要性",{"key":31,"text":223,"correct":29},"施工可靠性",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1253536,"室内雨水管安装完毕后，做灌水试验，灌水高度必须灌至每根立管最上部的雨水斗为止，灌水试验持续（ ），不渗漏为合格。",[228,230,232,234],{"key":20,"text":229,"correct":22},"30min",{"key":24,"text":231,"correct":29},"1h",{"key":27,"text":233,"correct":22},"2h",{"key":31,"text":235,"correct":22},"24h",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1253537,"暗配的导管，埋设深度与建筑物、构筑物表面的距离不应小于（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"10mm",{"key":24,"text":243,"correct":29},"15mm",{"key":27,"text":245,"correct":22},"20mm",{"key":31,"text":247,"correct":22},"30mm",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":27,"analysis":33},1253538,"以单位（子单位）工程为主要对象编制的施工组织设计，对单位（子单位）工程的施工过程起指导和制约作用的是（ ）。",[252,253,254,255],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":29},{"key":31,"text":153,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1253539,"建筑给排水工程中，（ ）是在立管、支管的安装过程中交叉进行的。",[260,262,264,266],{"key":20,"text":261,"correct":29},"阀门安装",{"key":24,"text":263,"correct":22},"洁具安装",{"key":27,"text":265,"correct":22},"地漏安装",{"key":31,"text":267,"correct":22},"水泵安装",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1253540,"案例一A公司接到B公司的施工总进度计划后，应策划价值设备安装施工接到计划：第二阶段是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"与土建工程施工全面配合阶段",{"key":24,"text":275,"correct":29},"全面安装的高峰阶段",{"key":27,"text":277,"correct":22},"安装工程由高峰转入收尾，全面进行试运转阶段",{"key":31,"text":279,"correct":22},"安装工程结束阶段",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1253541,"热熔塑料管道嵌墙暗敷时，应配合土建预留槽，其尺寸设计无规定时，嵌墙暗管墙槽尺寸的深度为（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"de+k10mm",{"key":24,"text":287,"correct":29},"de+30mm",{"key":27,"text":289,"correct":22},"de+60mm",{"key":31,"text":291,"correct":22},"de+90mm",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1253542,"施工机械的（ ）指单位时间（小时、台班、月、年）机械完成的工程数量。",[296,298,300,302],{"key":20,"text":297,"correct":22},"工作容量",{"key":24,"text":299,"correct":29},"生产率",{"key":27,"text":301,"correct":22},"动力",{"key":31,"text":303,"correct":22},"工作性能参数",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1253543,"给水立管管卡安装，层高小于或等于5m时，每层须安装（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":29},"1个",{"key":24,"text":311,"correct":22},"2个",{"key":27,"text":313,"correct":22},"3个",{"key":31,"text":315,"correct":22},"4个",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},1253544,"施工机械的（ ）是驱动各类施工机械进行工作的原动力。",[320,321,322,323],{"key":20,"text":297,"correct":22},{"key":24,"text":299,"correct":22},{"key":27,"text":301,"correct":29},{"key":31,"text":303,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1253545,"如施工中某段管子需隐蔽的，则该段管子应先进行（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":29},"灌水试验和通球试验",{"key":24,"text":331,"correct":22},"通气试验和通球试验",{"key":27,"text":333,"correct":22},"灌水试验和通气试验",{"key":31,"text":335,"correct":22},"密闭试验和通球试验",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1253546,"下列施工组织方法中，属于不常用的是（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"依次施工",{"key":24,"text":343,"correct":22},"平行施工",{"key":27,"text":345,"correct":22},"流水施工",{"key":31,"text":347,"correct":29},"间断施工",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1253547,"给水立管管卡安装，层高大于5m时，每层不得少于（ ）。",[352,353,354,355],{"key":20,"text":309,"correct":22},{"key":24,"text":311,"correct":29},{"key":27,"text":313,"correct":22},{"key":31,"text":315,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1253548,"单位工程施工组织设计由（ ）审批。",[360,362,364,366],{"key":20,"text":361,"correct":22},"由总承包单位负责人",{"key":24,"text":363,"correct":22},"由总承包单位技术负责人",{"key":27,"text":365,"correct":22},"施工单位负责人",{"key":31,"text":367,"correct":29},"施工单位技术负责人",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1253549,"金属导管严禁对口熔焊连接镀锌和壁厚小于等于（ ）的钢导管不得套管熔焊连接。",[372,374,376,378],{"key":20,"text":373,"correct":22},"1.5mm",{"key":24,"text":375,"correct":22},"1.6mm",{"key":27,"text":377,"correct":22},"1.8mm",{"key":31,"text":379,"correct":29},"2.0mm",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1253550,"铜管道的切割严禁采用（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"钢锯",{"key":24,"text":387,"correct":22},"砂轮切割机",{"key":27,"text":389,"correct":22},"等离子弧切割机",{"key":31,"text":391,"correct":29},"割炬气割",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},1253551,"不属于主要施工管理计划的有（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"进度管理计划",{"key":24,"text":399,"correct":22},"成本管理计划",{"key":27,"text":401,"correct":22},"环境管理计划",{"key":31,"text":403,"correct":29},"绿色施工管理计划",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},1253552,"封闭式母线敷设长度超过（ ）时，应设置伸缩节。",[408,410,412,414],{"key":20,"text":409,"correct":22},"15m",{"key":24,"text":411,"correct":22},"20m",{"key":27,"text":413,"correct":22},"30m",{"key":31,"text":415,"correct":29},"40m",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1253553,"施工组织总设计以（ ）为主要对象编制的施工组织设计，有对（ ）。",[420,421,422,423],{"key":20,"text":111,"correct":29},{"key":24,"text":113,"correct":22},{"key":27,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},1253554,"甲公司总承包某超高层五星级酒店工程，并将其中的机电安装工程分包给乙公司完成，其电力供应的干线为电力电缆，电力电缆从地下一层的变配电室经电缆沟通至多个电缆竖井，再经电缆竖井至各层的分配电箱，电缆数量大、规格多、路径曲折，部分电缆出竖井后经导管或桥架到用电点，为此项目部制定编写了电缆敷设专项方案用于施工，保证了电缆敷设的顺利进行。根据背景资料，回答下列问题。 下列有关专项方案的说法错误的是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"编制专项方案的类别由乙公司确定",{"key":24,"text":431,"correct":22},"专项方案的编制数量由乙公司确定",{"key":27,"text":433,"correct":29},"乙公司专项方案编制完成后，无需告诉甲公司",{"key":31,"text":435,"correct":22},"电缆敷设专项方案一般无需进行专家论证",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1253555,"下列不是根据施工组织设计编制的广度、深度和作用不同分类的是（ ）。",[440,441,442,443],{"key":20,"text":147,"correct":29},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":22},{"key":31,"text":153,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},1253556,"施工机械的（ ），一般列在机械的说明书上，施工机械的铭牌上都有标注，选择、计算和使用机械时可参照查用。",[448,449,450,451],{"key":20,"text":297,"correct":22},{"key":24,"text":299,"correct":22},{"key":27,"text":301,"correct":22},{"key":31,"text":303,"correct":29},{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":27,"analysis":33},1253557,"施工现场的主要道路应进行硬化处理，主干道应有排水措施，主干道宽度单行道不小于（ ）。",[456,457,458,459],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1253558,"施工组织总设计由（ ）审批。",[464,465,466,467],{"key":20,"text":361,"correct":22},{"key":24,"text":363,"correct":29},{"key":27,"text":365,"correct":22},{"key":31,"text":367,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1253559,"风管穿过需要封闭的防火防爆楼板或墙体时，应设钢板厚度不小于（ ）预埋管或防护套管，风管与防护套之间采用不燃材料封堵。",[472,474,475,476],{"key":20,"text":473,"correct":22},"1.2mm",{"key":24,"text":375,"correct":29},{"key":27,"text":377,"correct":22},{"key":31,"text":379,"correct":22},{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},1253560,"接闪器安装要排在（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":29},"最末端",{"key":24,"text":484,"correct":22},"最前端",{"key":27,"text":486,"correct":22},"中间",{"key":31,"text":488,"correct":22},"任何位置",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1253561,"施工机械的（ ），指的是机械在设计标准条件下，连续不停工作时的生产率。",[493,495,497,499],{"key":20,"text":494,"correct":29},"理论生产率",{"key":24,"text":496,"correct":22},"技术生产率",{"key":27,"text":498,"correct":22},"实际生产率",{"key":31,"text":500,"correct":22},"计算生产率",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1253562,"编制施工组织设计时，需组织编制组，明确负责人（主编），通常由（ ）主持编制。",[505,506,507,508],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":29},{"key":31,"text":509,"correct":22},"施工员",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},1253563,"建设工程安全生产管理条例明确的特种作业人员是指（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"探伤工",{"key":24,"text":517,"correct":22},"司炉工",{"key":27,"text":519,"correct":29},"架子工",{"key":31,"text":521,"correct":22},"水处理工",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1253564,"风管按其工作压力（P）可划分，系统工作压力p>1500Pa为（ ）。",[526,527,528,529],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":22},{"key":27,"text":175,"correct":29},{"key":31,"text":177,"correct":22},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},1253565,"安装工程资源管理的特殊点主要表现在材料管理方面有（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"特种设备作业两类人员的专门管理规定",{"key":24,"text":537,"correct":29},"要注意强制认证的产品使用管理和特殊场所使用的管理",{"key":27,"text":539,"correct":22},"特殊作业人员的专门管理规定",{"key":31,"text":541,"correct":22},"技术方案的确定管理",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},1253566,"以若干单位工程组成的群体工程或特大型项目为主要对象编制的施工组织设计，有对整个项目的施工过程起统筹规划、重点控制的作用的是（ ）。",[546,547,548,549],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":22},{"key":31,"text":153,"correct":29},{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1253567,"下列哪个指标不是衡量机械是否做到正确使用的主要指标（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"高效率",{"key":24,"text":557,"correct":22},"经济性率",{"key":27,"text":559,"correct":22},"机械非正常损耗防护",{"key":31,"text":561,"correct":29},"先进性",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1253568,"安全出口标志灯距地高度不低于（ ），且安装在疏散出口和楼梯口里侧的上方。",[566,567,568,570],{"key":20,"text":55,"correct":22},{"key":24,"text":57,"correct":29},{"key":27,"text":569,"correct":22},"2.4mm",{"key":31,"text":571,"correct":22},"3.0m",[573,576,579,582,585,588],{"id":15,"name":574,"category":7,"favorite":575},"领导干部任职前廉政法规知识测试题",92,{"id":577,"name":578,"category":7,"favorite":15},595,"建筑结构与设备",{"id":580,"name":581,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":583,"name":584,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":586,"name":587,"category":7,"favorite":8},534,"BIM工程师",{"id":589,"name":587,"category":7,"favorite":8},535]