[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,25,50,1361,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1254621,3,"判断题","建筑智能化工程综合布线敷设的线缆是传递信号的路径，信号的量级大，因而敷设完成均要检查测试。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1254622,"管道试压作业指导书，编制后做模拟实验体现了样板领先的理念，说明了新技术的推广应用要经过实践的验证，是作业指导书编制形成的一个重要环节。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1254623,"整个系统联合调试和试运行试验结果形成的记录统称为系统调试试运行记录。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1254624,"交底是组织者与执行者间的一种行为，是执行者在活动前向执行者布置工作或任务的一个关键环节。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1254625,"项目质量检查员在对施工班组进行施工技术交底时，要详细说明预防质量通病的具体措施。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1254626,"施工质量验收最主要的是检验批质量验收记录。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1254627,"高强螺栓施工属于特殊过程。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1254628,"交底的目的是把工作或任务的内容、目标、手段，涉及的资源、环境条件，可能发生的风险等由组织者向执行者解释清楚，执行者在正确理解的基础上使活动结果达到组织者的预期。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1254629,"施工方案交底包括具体工作内容、操作方法、施工工艺、质量标准、安全注意事项。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1254630,"由业主按规定时间和程序及时向企业报告，并提供事故发生的初步调查文件及证据。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1254631,"一般情况下，自检、互检和专检要全盘检查。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1254632,"项目技术员负责监督工程质量通病预防措施的落实情况，并对质量通病的预防效果进行检验。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1254633,"施工员（专业工程师）监督工程质量通病预防措施的落实情况，并对质量通病的预防效果进行检验。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1254634,"在技术交底的实施中，作业中发生外部指令引起的变更与预期有较大变化者要及时向作业人员交底。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1254635,"对技术文件、报告、报表、记录的审核，是对工程质量进行全面控制的重要手段",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1254636,"作业指导书不可以用作技术交底文件的一部分。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1254637,"采购物资应符合设计文件、标准、规范、相关法规及承包合同要求，如果项目部另有附加的质量要求，则不应予以满足。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1254638,"质量控制点的关键部位是对工程实体而言，薄弱环节主要指作业行为或施工方法。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1254639,"质量预控的重点是生产要素的预控。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1254640,"事故调查内容包括施工调查和收集资料，调查的组织由施工企业管理制度依据法规规定作出。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1254641,"在正常使用条件下，工程的保修期应从工程移交之日起计算。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1254642,"设计交底后，由施工单位提出图纸中的问题和疑点，提出要解决的技术难题。由设计单位拟定出解决办法。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1254643,"工序质量控制的方法以质量预控为主。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1254644,"计划成本与承包成本比较即可判定项目的盈亏情况。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1254645,"工程变更，施工中工程变更是是可以避免的。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1254646,"项目管理层是项目生产成本的控制中心。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1254647,"项目的整体利益和施工方本身的利益是对立统一关系，两者有其统一的一面，也有其对立的一面。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1254648,"变动成本的降低要从分项工程的消耗额降低入手。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1254649,"要降低固定成本必须提高管理效率、增加企业承揽的工程量，则单位工程量占有的变动成本就会降低。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1254650,"在实践中，将工程项目分解为既能方便地表示时间，又能方便地表示施工成本支出计划的工作是不容易的。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1254651,"成本管理的基本程序就是宏观上成本控制必须做到的六个环节或六个方面。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1254652,"施工项目成本是指建筑企业以施工项目作为成本核算对象的施工过程中所消耗的生产资料转移价值和劳动者的必要劳动所创造的价值的数字形式。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1254653,"间接成本计划反映间接成本的计划数及降低额，在计划制订中，成本项目与会计核算中间接成本项目的内容不一致。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1254654,"直接成本是指施工过程中直接耗费的构成工程实体或有助于工程形成的各项支出，包括人工费、材料费、机械使用费和施工措施费等。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1254655,"成本核算是反映实际发生的施工费用额度。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1254656,"施工阶段是项目成本发生的主要阶段，也是成本控制的重点阶段。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1254657,"第企业的成本管理责任体系包括两个方面：一是企业管理层；二是施工管理层.",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1254658,"成本计划是进行成本控制活动的基础。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1254659,"成本核算的结果反映了成本控制的效果。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1254660,"施工成本是企业成本的主要部分，能全部代表企业成本的组成，所以成本的摊入还要按照企业的规章制度或工程项目承包合同的约定来办。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1254661,"施工预算就是施工图预算。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1254662,"成本控制是该工程降低成本的指导性文件",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1254663,"间接成本是指为施工准备、组织和管理施工生产的全部费用的支出，是非直接用于也无法直接计人工程对象，但为进行工程施工所必须发生的费用。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1254664,"风险识别有三种时态、三种状态和六种类型",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1254665,"施工现场发生的噪声、粉尘排放，主要是对环境的人体健康、大气污染影响较大。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1254666,"项目经理是职业健康安全环境风险管理组的第一责任人。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1254667,"电气设备的金属外壳，必须接地或接零。同一设备可做接地和接零，同一供电网不允许有的接地有的接零。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1254668,"项目经理部风险管理组负责对已识别的风险，尤其是对不可接受的职业健康、安全和环境风险采取措施，包括预防和制止措施。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1254669,"安全检查的重点是违章指挥和违章作业。安全检查后应编制安全检查报告，说明已达标项目、未达标项目、存在问题、原因分析、纠正和预防措施。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1254670,"氧气管道安装、吹扫、试压所用的工具、零部件、物料等均不得有油。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]