[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,24,50,1361,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1254571,3,"判断题","施工阶段是工程实体的形成阶段，对施工阶段进度进行控制是整个工程项目建设进度控制的重点。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1254572,"若工程规模较大、工艺关系复杂时、制约因素较多，施工设计图纸、工程设备、特殊材料和大宗材料采购供应尚未全部清晰，为便于调整计划用横道图计划表示为妥。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1254573,"通过改变有关工作持续时间的进度计划调整方法不改变工作的持续时间，而只是改变某些工作的开始时间和完成时间。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1254574,"施工总进度计划节点较大，划分得也较粗，相互的制约依赖关系和衔接的逻辑关系比较清楚，用网络计划图表示为宜。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1254575,"施工进度计划的编制、实施和控制在施工活动的全部管理工作中是属于首位的。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1254576,"通过网络计划时间参数的计算，可以找出关键线路和关键工作，也可以明确各项工作的机动时间。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1254577,"大多数单位工程施工进度计划是与作业计划一样均为控制性计划。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1254578,"横道图计划调整只能用手工方式进行，其工作量较大。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1254579,"双代号网络图是以箭线及其两端节点的编号表示工作的网络图。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1254580,"横道图计划能够明确表达各项工作之间的逻辑关系，能够表示施工过程中各个环节之间互相依赖、互相制约的关系。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1254581,"若进度偏差大于总时差，说明此偏差对总工期无影响，但它对后续工作的影响程度，需要根据此偏差与自由时差的比较情况来确定。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1254582,"编制好的施工进度计划是编制同期的各种生产资源需要量计划的重要依据，包括人力资源、材料和工程设备、施工机械、施工技术和施工需用资金等各种需要量计划。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1254583,"网络图是有方向的，按习惯从第一个节点开始，宜保持从右向左顺序连接，不宜出现箭线箭头从左方向指向右方向。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1254584,"合同工期的确定可参考定额工期或计算工期，也可根据投产计划来确定。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1254585,"预期施工完成的工作即拟完成的工作，可以用实物工程量表示，也可用拟完成的产值金额数表示；前者称完成投资额度计划，后者称实物形象进度计划。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1254586,"作业指导书是施工作业中一个工序或数个连续相关的工序为对象编写的技术文件。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1254587,"质量预防措施可单独编制，也可编制在施工组织设计或施工方案里。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1254588,"做好技术交底是保证施工质量的重要措施之一",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1254589,"行灯的电源线为施工现场用橡皮软电缆线，不要使用塑料双芯线。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1254590,"在企业通过认证的质量管理体系的基础上结合本项目实际情况，分析质量控制程序文件等有关资料是否需要补充和完善。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1254591,"施工技术交底是施工活动开始前的一项有针对性的，关于施工技术方面的，技术管理人员向作业人或下级技术管理人员向上级技术管理人员做的符合法规规定、符合技术管理制度要求的重要工作。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1254592,"图纸会审是工程质量控制的重要手段，能够使施工单位熟悉了解设计图纸，明确设计意图和关键部位的工程质量要求，发现和减少设计差错，保证工程质量。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1254593,"“四新”在施工中有两种情况，无论何种情况，均应先试验后推广，以样板示范做技术交底的手段。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1254594,"分项工程应按主要工种、材料、施工工艺和设备类别等进行划分。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1254595,"事前对影响施工项目质量的要素严加控制，是保证施工项目质量的关键。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1254596,"酒店大堂平顶上安装施工失效属于在事前阶段的质量失控。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1254597,"施工技术方案未经分析论证，贸然组织施工引起的质量事故属于指导责任事故。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1254598,"产品质量是定性的。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1254599,"作业指导书是施工方案中技术部分的简化结果。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1254600,"检验批的质量按应按重要项目和一般项目验收。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1254601,"施工记录是工程使用维护和改造扩建的重要基础资料。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1254602,"机电工程检验批必须按楼层、施工段、变形缝等进行划分。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1254603,"质量交底可以与技术交底同时进行，施工员不可邀请质量员共同参加对作业队组的质量交底工作。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1254604,"技术交底资料应办理签字手续并归档保存。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1254605,"由法规明确的施工记录的内容随着规范标准的修订而变更。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1254606,"质量策划的结果形成质量管理机构。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1254607,"直接经济损失在5万元（含5万元以上），不满10万元的质量事故属于重大质量事故。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1254608,"摄像机镜头对准目标并应逆光拍摄。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1254609,"深化设计后的施工图应由原设计单位审查确认后，才能作为施工的依据。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1254610,"室内消火栓试射试验为检验工程的设计和安装是否取得预期的效果，选取的位置是在屋顶层一处，首层一处，共两处。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1254611,"分项工程交底包括分部工程（或重要部位、关键工艺、特殊过程）的范围、施工条件、施工组织、计划安排、特殊技术要求、技术措施、资源投人、质量及安全要求等。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1254612,"质量员发现抱箍构造不合理，其检查方法为监测法。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1254613,"通过施工质量策划形成的施工质量计划等同于施工组织设计。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1254614,"A公司没有按计划、实施、检查、改进弹性原理实施有效控制。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1254615,"施工过程发生设计更变信息传递中断而造成质量问题，应属于事前质量控制失效。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1254616,"2承重支架抱箍因构造不合理而返工，影响质量的直接因素是施工技术。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1254617,"停止点在本质上是施工过程中的某一个工序，一个工序完成两个作业内容。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1254618,"特殊过程和关键过程无须在施工组织设计中明确。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1254619,"项目部对工程质量控制各个阶段都有针对性的活动，自事前的编制施工组织设计、深化设计、人员上岗培训开始，到事中的材料筛选、管理人员加强巡视检查工程质量，最好把好检查验收关。说明项目部对工程质量策划的控制已全面。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1254620,"材料进场验收属于预检记录范畴。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]