[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,23,50,1361,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1254521,3,"判断题","空间顺序的目的是解决施工的流向。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1254522,"不同等级电压的电缆分层敷设，高压电缆应敷设在下层。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1254523,"室内排水管道工程是施工中，如施工中某段管子需隐蔽的，则该段管子应先进行灌压力试验。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1254524,"阶段性施工进度计划要依施工总进度计划的控制节点为准，一般可自行调整。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1254525,"盘柜施工顺序：施工准备→盘柜搬运→基础型钢制作安装→盘柜就位→硬母线安装→试验整定→一、二次线连接→送电运行验收。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1254526,"工种顺序的安排要以空间顺序为基础，不能违反工艺规律。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1254527,"单芯交流电缆固定用的卡子不能形成铁磁闭合回路，其卡子应用非导磁材料制成，如硬木、塑料、铝板等。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1254528,"边长或直径大于等于300mm的防火阀、消声器、消声弯头、静压箱和三通等应设置独立的支吊架。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1254529,"专项施工方案类别和数量由总包单位确定。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1254530,"施工组织设计以施工项目为对象编制的，用以指导施工的技术、经济和管理的综合性文件。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1254531,"施工方案比较通常用技术和经济两个方面进行分析，方法为定性和定量两种。定量分析要大量的数据积累，这些数据是随着时间和技术进步而波动的。定性分析要有较多的经验积累，这些经验不仅有个人的，更主要是团队的项目管理班子集体的。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1254532,"由专业承包单位施工的分部（分项）工程或专项工程的施工方案，由专业承包单位技术负责人或技术负责人授权的技术人员审批，有总承包单位时，由总承包单位项目技术负责人核准备案。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1254533,"安装工程的区段划分要与土建工程的区段划分保持一致，以保证项目建设按期完成。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1254534,"建筑电气工程在动力中心的变配电设备安装，机场建设的电力电缆敷设，带有36KV的变配电所的调整试验等。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1254535,"全面安装的高峰阶段，与建筑施工交叉多是协调管理的重点，也是控制施工进度计划的重点。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1254536,"宿舍内应保证有必要的生活空间，室内净高不得小于2.4m，通道宽度不得小于0.9m，每间宿舍居住人员不得超过12人。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1254537,"是否要进行专家论证，由项目部报本企业技术负责人批准，并征得总包单位。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1254538,"文字中用“或”表示视具体情况不确定的作业活动。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1254539,"离开特殊作业一定期限（通常为3个月以上）者，必须重新考试合格，方可上岗。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1254540,"正确选用是施工机械设备的基本要求，选用原则主要包括技术合理和经济合理两^方面。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1254541,"封闭式母线穿越防火墙、防火楼板时，应采取防火隔离措施，一般在外壳周围填充防火填料。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1254542,"房屋建筑安装工程的施工组织设计的书面文件资料由总承包单位收到后进行统一编排。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1254543,"第施工组织设计以施工项目为对象编制的，用于指导施工的技术、经济和管理的综合性文件。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1254544,"电缆穿过楼板时，应装套管，敷设完后应将套管用防火材料封堵严密；在强电井内，电缆穿过楼板敷设后应用防火材料封堵严密。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1254545,"民工走路时误入无防护的吊装孔而坠落身亡是一起触电事故。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1254546,"规模较小的单位工程可不分区，但必须分段施工，这是客观实际情况的反映。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1254547,"施工顺序反映施工活动中的工序衔接关系，应符合工艺技术规律，在一定生产力水平下是可以违反的。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1254548,"规模较大的分部（分项）工程和专项工程的施工方案要按单位工程施工组织设计进行编制和审批。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1254549,"每台用电设备必须有各自专用的开关箱，严禁用同一个开关箱直接控制2台或2台以上用电设备（不包含插座）。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1254550,"室内排水管道工程的施工顺序：施工准备→管道预制→支吊架制作安装→立管安装→支管安装→封口堵洞→通球试验→灌水试验。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1254551,"如室内室内供水形成环网供水，则干管是水平的，应后装。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1254552,"系统组件应在管网冲洗前安装，否则易在冲洗过程中导致损坏。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1254553,"危险性较大的施工方案要按法规规定组织有关专家进行论证，只有论证通过的方案才能实施。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1254554,"房屋建筑安装工程的承包单位是建筑工程承包总单位。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1254555,"定性分析要有较多的经验积累，这些经验主要是个人的。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1254556,"房屋建筑设备安装工程的专项施工方案编制的导向主要是指，工程规模较大、施工难度较大、施工安全风险较大或采用新材料和新工艺的分部或分项工程。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1254557,"金属风管制作加工顺序反映了金属薄板风管以现有加工机械制作的全部顺序安排。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1254558,"定量分析要大量的数据积累，这些数据是随着时间和技术进步而变动的。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1254559,"若是立管从室外环网引入的，则干管就是引入管的一段。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1254560,"室外给水管道工程施工顺序：施工准备→放线挖土→沟槽预制→布管、下管→管道对口、调直稳固→管道连接→试压、冲洗、消毒→土方回填、砌阀门井。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1254561,"立管安装包括干管安装。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1254562,"非主干管上阀门应以每批（同牌号、同规格、同型号）数量中抽查20％且不少于一个，作耐压强度试验，如有漏、裂不合格的应再抽查50％，仍有不合格的则逐个试验。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1254563,"电气导管敷设前要求对管道内部进行清理，埋设于混凝土内的金属导管内外壁应防腐处理。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1254564,"一个工程项目的施工要分区实施，区内要分段施工，才能使工程循序渐进，有条不紊地展开，从而取得良好效益。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1254565,"民用建筑工程土建施工单位为分包单位。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1254566,"逻辑关系通常由工作的工艺关系和组织关系所决定。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1254567,"进度控制的主要环节包括进度检查、进度分析和进度的调整等。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1254568,"机电工程项目施工进度表示方法有横道图、网络图、流水作业图表等。常用的有横道图和网络图两种。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1254569,"若进度偏差小于或等于自由时差，说明此偏差对后续工作产生影响，应根据后续工作允许的影响程度来确定如何调整。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1254570,"横道图编制方法简单，直观清晰，便于实际进度与计划进度比较，但不便于计算劳动力、物资和资金的需要量。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]