[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-838-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":713},{"id":5,"name":6,"category":7,"favorite":8},838,"(设备安装施工)专业管理实务 岗位知识","建筑工程",0,18,50,1361,[13,38,53,68,83,98,112,127,142,155,169,183,198,212,226,240,254,268,279,289,303,317,331,344,359,370,382,395,410,424,439,454,468,480,494,508,522,536,547,561,575,590,604,618,631,645,659,673,687,701],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1254271,2,"多选题","属于单体单机的措施试验（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","风管的密闭性试验",true,{"key":24,"text":25,"correct":26},"B","风管的动力系统试验",false,{"key":28,"text":29,"correct":22},"C","电动或气动调节阀的单校",{"key":31,"text":32,"correct":22},"D","冷却水的水泵试运转试验",{"key":34,"text":35,"correct":22},"E","风机的单机试运行","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1254272,"自制吊杆的规格应符合设计要求，吊杆应（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"平直",{"key":24,"text":45,"correct":22},"螺纹完整",{"key":28,"text":47,"correct":22},"丝扣光洁",{"key":31,"text":49,"correct":26},"白色",{"key":34,"text":51,"correct":26},"黑色","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1254273,"方法控制包含（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工组织设计",{"key":24,"text":60,"correct":22},"施工方案",{"key":28,"text":62,"correct":22},"施工工艺",{"key":31,"text":64,"correct":22},"施工技术措施",{"key":34,"text":66,"correct":26},"施工技术规范","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1254274,"为使施工单位熟悉有关的设计图纸，充分了解拟建项目的特点、设计意图和工艺与质量要求，最大程度上减少图纸的差错，并消灭图纸中的质量隐患，必须要做好（ ）工作。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"设计交底",{"key":24,"text":75,"correct":22},"图纸会审",{"key":28,"text":77,"correct":26},"质量监督交底",{"key":31,"text":79,"correct":26},"技术交底",{"key":34,"text":81,"correct":26},"技术核定","AB",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1254275,"建筑智能化工程综合布线敷设的线缆，敷设完成均要检查测试，检测的内容包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"线缆的弯曲半径",{"key":24,"text":90,"correct":26},"线槽敷设、暗管敷设、线缆间的最大允许距离",{"key":28,"text":92,"correct":22},"建筑物内电缆、光缆及其导管与其他管线间距离",{"key":31,"text":94,"correct":26},"电缆和绞线的芯线起始接点",{"key":34,"text":96,"correct":22},"电缆和绞线的芯线终端接点","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":52,"analysis":37},1254276,"防水泵运转产生的噪音干扰要从（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"水泵机组隔振",{"key":24,"text":105,"correct":22},"管道隔振",{"key":28,"text":107,"correct":22},"支架隔振",{"key":31,"text":109,"correct":26},"接口隔振",{"key":34,"text":111,"correct":26},"管道压力",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1254277,"质量事故的处理方式（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"返工处理",{"key":24,"text":119,"correct":22},"返修处理",{"key":28,"text":121,"correct":22},"限制使用",{"key":31,"text":123,"correct":26},"形成事故处理报告",{"key":34,"text":125,"correct":22},"报废处理","ABCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1254278,"事中质量控制的具体措施是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"质量处理有复查",{"key":24,"text":134,"correct":22},"成品保护有措施",{"key":28,"text":136,"correct":22},"行使质控有否决",{"key":31,"text":138,"correct":22},"质量文件有档案",{"key":34,"text":140,"correct":22},"图纸会审有记录","ABCDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":52,"analysis":37},1254279,"施工记录要符合（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"规范要求",{"key":24,"text":149,"correct":22},"现场实际情况",{"key":28,"text":151,"correct":22},"专业部位要求",{"key":31,"text":153,"correct":26},"施工计划",{"key":34,"text":60,"correct":26},{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":52,"analysis":37},1254280,"设计交底的主要内容包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"施工图设计依据",{"key":24,"text":162,"correct":22},"设计意图",{"key":28,"text":164,"correct":22},"施工注意事项",{"key":31,"text":166,"correct":26},"资源管理",{"key":34,"text":168,"correct":26},"施工过程管理",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},1254281,"施工成本分类的方法（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"按成本发生的时间划分",{"key":24,"text":176,"correct":22},"按生产费用进入成本的方法划",{"key":28,"text":178,"correct":22},"按生产费用和工程量的关系划分",{"key":31,"text":180,"correct":26},"按生产费用和施工标准划分",{"key":34,"text":182,"correct":26},"按生产成本",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1254282,"直接工程费是指施工过程中耗费的直接构成工程实体的各项费用，包括（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":26},"办公费",{"key":24,"text":190,"correct":22},"人工费",{"key":28,"text":192,"correct":26},"措施费",{"key":31,"text":194,"correct":22},"材料费",{"key":34,"text":196,"correct":22},"施工机械使用费","BDE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":141,"analysis":37},1254283,"成本管理的基本程序包括（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"成本计划",{"key":24,"text":205,"correct":22},"成本预测",{"key":28,"text":207,"correct":22},"成本控制",{"key":31,"text":209,"correct":22},"成本分析",{"key":34,"text":211,"correct":22},"成本考核",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":52,"analysis":37},1254284,"施工成本控制可分为（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"事先控制",{"key":24,"text":219,"correct":22},"事中控制（过程控制）",{"key":28,"text":221,"correct":22},"事后控制",{"key":31,"text":223,"correct":26},"综合控制",{"key":34,"text":225,"correct":26},"反馈控制",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":67,"analysis":37},1254285,"施工成本包括（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"消耗的原材料、辅助材料、外购件等的费用",{"key":24,"text":233,"correct":22},"施工机械的台班费或租赁费",{"key":28,"text":235,"correct":22},"支付给生产工人的工资、奖金、工资性津贴等",{"key":31,"text":237,"correct":22},"因组织施工而发生的组织和管理费用",{"key":34,"text":239,"correct":26},"折旧费",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":52,"analysis":37},1254286,"成本的控制活动要求（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"要按照计划成本目标值来控制物资采购价格，并做好物资进场验收工作，确保质量",{"key":24,"text":247,"correct":22},"注意工程变更等的动态因素影响",{"key":28,"text":249,"correct":22},"增强项目管理人员和全体员工的成本意识和控制能力",{"key":31,"text":251,"correct":26},"通过劳务合同进行人工费的控制",{"key":34,"text":253,"correct":26},"加强施工管理",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":67,"analysis":37},1254287,"施工成本是指在建设工程项目的施工过程中所发生的全部生产费用的总和，包括消耗的各种（ ）等费用，支付给生产工人的工资、奖金、工资性津贴等费用，以及进行施工组织和管理所发生的全部费用支出。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"原材料",{"key":24,"text":261,"correct":22},"辅助材料",{"key":28,"text":263,"correct":22},"构配件",{"key":31,"text":265,"correct":22},"周转材料的摊销费用或租赁费用",{"key":34,"text":267,"correct":26},"利润",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":82,"analysis":37},1254288,"属于固定成本（ ）。",[272,273,275,276,277],{"key":20,"text":239,"correct":22},{"key":24,"text":274,"correct":22},"管理人员的工资",{"key":28,"text":194,"correct":26},{"key":31,"text":190,"correct":26},{"key":34,"text":278,"correct":26},"技术费",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":288,"analysis":37},1254289,"属于变动成本（ ）。",[283,284,285,286,287],{"key":20,"text":239,"correct":26},{"key":24,"text":274,"correct":26},{"key":28,"text":194,"correct":22},{"key":31,"text":190,"correct":22},{"key":34,"text":278,"correct":26},"CD",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":302,"analysis":37},1254290,"建设工程项目施工成本由（ ）组成。",[293,295,296,298,300],{"key":20,"text":294,"correct":22},"直接成本",{"key":24,"text":267,"correct":26},{"key":28,"text":297,"correct":22},"间接成本",{"key":31,"text":299,"correct":26},"规费",{"key":34,"text":301,"correct":26},"设计费","AC",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":67,"analysis":37},1254291,"管理措施主要有（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"组织措施",{"key":24,"text":310,"correct":22},"经济措施",{"key":28,"text":312,"correct":22},"技术措施",{"key":31,"text":314,"correct":22},"合同措施",{"key":34,"text":316,"correct":26},"安全措施",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":67,"analysis":37},1254292,"工程变更一般包括（ ）。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"设计变更",{"key":24,"text":324,"correct":22},"进度计划变更",{"key":28,"text":326,"correct":22},"施工条件变更",{"key":31,"text":328,"correct":22},"技术标准规范变更",{"key":34,"text":330,"correct":26},"工程变更",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":126,"analysis":37},1254293,"成本的控制活动依据（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"工程的承包合同",{"key":24,"text":338,"correct":22},"进度统计报告",{"key":28,"text":340,"correct":22},"施工成本计划",{"key":31,"text":342,"correct":26},"规范变更",{"key":34,"text":330,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":358,"analysis":37},1254294,"材料费是指施工过程中耗费的构成工程实体的原材料、辅助材料、构配件、零件、半成品的费用，内容包括：（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"材料生产费",{"key":24,"text":351,"correct":22},"材料运杂费",{"key":28,"text":353,"correct":22},"运输损耗费",{"key":31,"text":355,"correct":22},"采购及保管费",{"key":34,"text":357,"correct":22},"检验试验费","BCDE",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":36,"analysis":37},1254295,"施工成本管理的任务主要包括：（ ）、成本分析和成本考核。",[363,364,366,367,368],{"key":20,"text":205,"correct":22},{"key":24,"text":365,"correct":26},"成本计算",{"key":28,"text":203,"correct":22},{"key":31,"text":207,"correct":22},{"key":34,"text":369,"correct":22},"成本核算",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":97,"analysis":37},1254296,"成本的控制的对象包括（ ）。",[374,375,377,379,380],{"key":20,"text":251,"correct":22},{"key":24,"text":376,"correct":26},"通过施工管理进行材料用量的控制",{"key":28,"text":378,"correct":22},"通过掌握市场信息，采用招标、询价等方式控制材料、设备的采购价格",{"key":31,"text":247,"correct":26},{"key":34,"text":381,"correct":22},"通过定额管理和计量管理进行材料用量的控制",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":141,"analysis":37},1254297,"管理环节主要有（ ）。",[386,388,389,391,393],{"key":20,"text":387,"correct":22},"施工成本预测",{"key":24,"text":340,"correct":22},{"key":28,"text":390,"correct":22},"施工成本控制",{"key":31,"text":392,"correct":22},"施工成本核算",{"key":34,"text":394,"correct":22},"施工成本考核",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":409,"analysis":37},1254298,"动火作业要从（ ）入手加强安全管理。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"保持消防设施完好",{"key":24,"text":402,"correct":22},"办理动火证制度",{"key":28,"text":404,"correct":26},"上岗方案的审定",{"key":31,"text":406,"correct":22},"易燃易爆场所动火作业有人监护",{"key":34,"text":408,"correct":26},"需持证上岗的人员","ABD",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":67,"analysis":37},1254299,"应急反应的实施原则（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"避免伤亡",{"key":24,"text":417,"correct":22},"保护人员不受伤害",{"key":28,"text":419,"correct":22},"避免或降低环境污染",{"key":31,"text":421,"correct":22},"保护设备、设施或其他财产避免和减少损失",{"key":34,"text":423,"correct":26},"应急避险的行动程序，应急预案的培训程序",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},1254300,"某公司接集团总部指令，组建一支电气作业队去灾区抢修10kV以下的架空输电线路。由A公司技术、安全部门负责组织作业前的动员和培训，除公司领导作动员报告外，技术部门负责人做任务交底和方案交底，安全部门负责人及专业施工员做了作业安全技术交底。并安排全体作业人员进行身体健康检查，对电工登高作业用具及施工机械按规定做试验性检查，保证抢修人员和机具完好程度都处于良好的准备状态，专业施工员特别对立杆、紧线的安全技术要求进行了讲解，由于准备充分、安全措施到位，即使在非常规状态下施工，还是顺利完成了任务。请针对上述情况，回答下列问题。 施工过程中安全检查的重点是（ ）。",[428,430,432,434,436],{"key":20,"text":429,"correct":26},"持证上岗",{"key":24,"text":431,"correct":22},"违章指挥",{"key":28,"text":433,"correct":22},"违章作业",{"key":31,"text":435,"correct":26},"防护用品",{"key":34,"text":437,"correct":26},"应急措施","BC",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":453,"analysis":37},1254301,"对房屋建筑安装工程中产生的环境污染源识别后，应按以下程序采取措施（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"对确定的重要环境因素制定目标、指标及管理方案",{"key":24,"text":446,"correct":22},"明确相关岗位人员和管理人员的职责",{"key":28,"text":448,"correct":26},"及时通报可能受到污染危害的单位和居民",{"key":31,"text":450,"correct":22},"建立对施工现场环境保护的制度",{"key":34,"text":452,"correct":22},"建立环境保护信息沟通渠道，实施有效监督，做到施工全过程监控，鼓励社会监督","ABDE",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":141,"analysis":37},1254302,"施工作业的安全管理重点包括（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"高空作业",{"key":24,"text":461,"correct":22},"施工机械机具操作",{"key":28,"text":463,"correct":22},"起重吊装作业",{"key":31,"text":465,"correct":22},"在容器内作业",{"key":34,"text":467,"correct":22},"无损探伤作业",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":358,"analysis":37},1254303,"环境事故发生后的处置（ ）。",[472,473,475,476,478],{"key":20,"text":450,"correct":26},{"key":24,"text":474,"correct":22},"按应急预案立即采取措施处理，防止事故扩大或发生次生灾害",{"key":28,"text":448,"correct":22},{"key":31,"text":477,"correct":22},"暂停相关事故作业，保护好事故现场",{"key":34,"text":479,"correct":22},"积极接受事故调查处理",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":67,"analysis":37},1254304,"项目经理负有（ ）。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"建立管理体系",{"key":24,"text":487,"correct":22},"提出目标或确定目标",{"key":28,"text":489,"correct":22},"建立完善体系文件责任",{"key":31,"text":491,"correct":22},"在实施中进行持续改进",{"key":34,"text":493,"correct":26},"建立施工方案",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":358,"analysis":37},1254305,"文明施工要求，场容管理（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":26},"建立施工保护措施",{"key":24,"text":501,"correct":22},"建立文明施工责任制，划分区域，明确管理负责人",{"key":28,"text":503,"correct":22},"施工地点和周围清洁整齐，做到随时清理、工完场清",{"key":31,"text":505,"correct":22},"严格执行成品保护措施",{"key":34,"text":507,"correct":22},"施工现场不随意堆垃圾，要按规划地点分类堆放，定期处理，并按规定分类清理",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":126,"analysis":37},1254306,"文明施工要求，材料管理（ ）。",[512,514,516,518,520],{"key":20,"text":513,"correct":22},"库房内材料要分类码放整齐，限宽限高，上架入箱，标识齐全",{"key":24,"text":515,"correct":22},"易燃易爆及有毒有害物品仓库按规定距离单独设立，且远离生活区和施工区，有专人保护",{"key":28,"text":517,"correct":22},"库房应保持干燥清洁、通风良好",{"key":31,"text":519,"correct":26},"库房应高大宽敞",{"key":34,"text":521,"correct":22},"材料堆场场地平整，尽可能作硬化处理，排水通畅，堆场清洁卫生，方便车辆运输",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":535,"analysis":37},1254307,"起重吊装作业要（ ）入手加强管理。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"起重吊装机械及索具的合格判定",{"key":24,"text":529,"correct":26},"完备的操作使用规范",{"key":28,"text":531,"correct":22},"施工方案的审定",{"key":31,"text":533,"correct":22},"特种作业人员持证上岗",{"key":34,"text":408,"correct":26},"ACD",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":546,"analysis":37},1254308,"施工机械机具操作要（ ）入手加强安全管理。",[540,541,542,543,545],{"key":20,"text":404,"correct":26},{"key":24,"text":529,"correct":22},{"key":28,"text":408,"correct":22},{"key":31,"text":544,"correct":22},"保持机械、机具的完好状态",{"key":34,"text":316,"correct":26},"BCD",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":67,"analysis":37},1254309,"事故调查组主要内容（ ）。",[551,553,555,557,559],{"key":20,"text":552,"correct":22},"事故现场处理",{"key":24,"text":554,"correct":22},"物证搜集",{"key":28,"text":556,"correct":22},"证人材料搜集",{"key":31,"text":558,"correct":22},"事故事实材料搜集",{"key":34,"text":560,"correct":26},"事故备案",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":302,"analysis":37},1254310,"危险源的种类（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"是指施工过程中存在的可能发生意外能量释放而造成伤亡事故的能量和危险物质",{"key":24,"text":568,"correct":26},"是指导致能量或危险物质的约束和限制措施被破坏或失效的各种危害",{"key":28,"text":570,"correct":22},"是指导致能量或危险物质的约束或限制措施被破坏或失效的各种因素",{"key":31,"text":572,"correct":26},"是指施工过程中发生能量释放而造成伤亡事故的能量和危险物质",{"key":34,"text":574,"correct":26},"项目部使用的相关方使用的施工机械设备",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":589,"analysis":37},1254311,"文明施工要求，施工机具管理（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"手动施工机具和较大的施工机械出库前保养完好并分类整齐排放在室内",{"key":24,"text":582,"correct":22},"机动车辆应停放在规划的停车场内，不应挤占施工通道",{"key":28,"text":584,"correct":26},"手动施工机具和较大的施工机械要有新品作为预防措施",{"key":31,"text":586,"correct":26},"所有施工机械要按规定定期更换新品",{"key":34,"text":588,"correct":22},"所有施工机械要按规定定期维护保养，保持性能处于完好状态，且外观整洁","ABE",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":67,"analysis":37},1254312,"建筑设备安装工程施工产生的对环境有影响的有害物质（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"水污染源",{"key":24,"text":597,"correct":22},"气体污染源",{"key":28,"text":599,"correct":22},"噪声污染源",{"key":31,"text":601,"correct":22},"固体废弃物污染源",{"key":34,"text":603,"correct":26},"水体污染",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":453,"analysis":37},1254313,"文明施工要求，现场道路设置（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"所有设备吊装区设立警戒线，且标识清晰",{"key":24,"text":611,"correct":22},"临街处设立围挡",{"key":28,"text":613,"correct":26},"场区道路设置及时救治器具",{"key":31,"text":615,"correct":22},"场区道路设置人行通道",{"key":34,"text":617,"correct":22},"所有临时楼梯有扶手和安全护栏",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":67,"analysis":37},1254314,"对应急预案定期演练及检查，检查的主要内容为（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":22},"通信系统的情况是否正常",{"key":24,"text":625,"correct":22},"各种救护设施是否齐全有效",{"key":28,"text":627,"correct":22},"撤离步骤是否适宜",{"key":31,"text":629,"correct":22},"事故处置人员能否及时到位",{"key":34,"text":423,"correct":26},{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":52,"analysis":37},1254315,"工伤事故类别确定原则（ ）。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"要着重考虑导致事故发生的起因物方面因素",{"key":24,"text":638,"correct":22},"一次事故中同时存在两个或两个以上直接原因，应以先发的、诱导性的原因作为确定事故类别的主要依据",{"key":28,"text":640,"correct":22},"突出事故的专业特性",{"key":31,"text":642,"correct":26},"中出事故发生的起因物",{"key":34,"text":644,"correct":26},"突出事故的性质",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":36,"analysis":37},1254316,"油漆作业的安全防护有（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"油漆作业时，应通风良好，戴好防护口罩及有关用品。室内配料及施工应通风良好且站在上风头",{"key":24,"text":652,"correct":26},"患有高血压、心脏病及糖尿病者不得从事该项作业",{"key":28,"text":654,"correct":22},"不得将在油漆施工中或刚完工的室内作为宿舍用",{"key":31,"text":656,"correct":22},"各种有毒物品应专人负责，专柜分类保管。保管人员应熟悉各种物品性能，严格保管及领用制度",{"key":34,"text":658,"correct":22},"严禁在施工中进食和吸烟",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":97,"analysis":37},1254317,"下列情况中属于特别重大事故的是（ ）。",[663,665,667,669,671],{"key":20,"text":664,"correct":22},"造成30人以上死亡",{"key":24,"text":666,"correct":26},"造成20人以上死亡",{"key":28,"text":668,"correct":22},"造成100人以上重伤",{"key":31,"text":670,"correct":26},"造成急性工业中毒50人以上",{"key":34,"text":672,"correct":22},"造成直接经济损失1亿元以上",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":67,"analysis":37},1254318,"规范施工人员的行为主要是（ ）以达到提升施工单位外在形象的目的。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"制定措施和规范施工人员的语言及行为",{"key":24,"text":680,"correct":22},"提高自身素质",{"key":28,"text":682,"correct":22},"构建内部和谐气氛",{"key":31,"text":684,"correct":22},"提高对外沟通水平和质量",{"key":34,"text":686,"correct":26},"提高自身知识水平",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":67,"analysis":37},1254319,"管道、设备的试压、冲洗、消毒作业要从（完善施工方案、危险区域标识清楚、指示仪表正确有效、个人防护用品齐全）等方面入手加强安全管理。",[691,693,695,697,699],{"key":20,"text":692,"correct":22},"完善施工方案",{"key":24,"text":694,"correct":22},"危险区域标识清楚",{"key":28,"text":696,"correct":22},"指示仪表正确有效",{"key":31,"text":698,"correct":22},"个人防护用品齐全",{"key":34,"text":700,"correct":26},"指示标志错误",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":546,"analysis":37},1254320,"单机试运转和联动试运转要从（ ）等方面入手加强安全管理。",[705,706,708,710,712],{"key":20,"text":692,"correct":26},{"key":24,"text":707,"correct":22},"完善试运转方案",{"key":28,"text":709,"correct":22},"做到明确分工",{"key":31,"text":711,"correct":22},"有应急预案",{"key":34,"text":253,"correct":26},[714,718,721,724,727,730],{"id":715,"name":716,"category":7,"favorite":717},1,"领导干部任职前廉政法规知识测试题",92,{"id":719,"name":720,"category":7,"favorite":715},595,"建筑结构与设备",{"id":722,"name":723,"category":7,"favorite":715},715,"招标采购专业知识与法律法规",{"id":725,"name":726,"category":7,"favorite":715},848,"市政方向-通用基础",{"id":728,"name":729,"category":7,"favorite":8},534,"BIM工程师",{"id":731,"name":729,"category":7,"favorite":8},535]